F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.

Slides:



Advertisements
Similar presentations
SMAW Equipment (Shielded Metal Arc Welding- commonly called “stick welding”, or “arc welding”)
Advertisements

Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Booster Main Bending Magnet Test in SM18. Why The energy upgrade of the PS Booster main bending magnet requires endurance tests at high current (≈12 kA)
Booster Corrector Upgrade October William Pellico.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
Proton Plan Director's Review 8/15/06 – Booster Corrector UpgradeDrennan1 Proton Plan Booster Corrector Upgrade Directors Review August 2006 Presenter:
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Electrical & Control Power Supplies Trevor Hartnett.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
G2p/gep Beamline Project Overview Tim Michalski Project Lead.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
New Corrector System for the Fermilab Booster E.J. Prebys, C.C. Drennan, D.J. Harding, V. Kashikhin, J.R. Lackey, A. Makarov, W.A. Pellico Fermilab, Batavia,
F AAC Review, May 10, Prebys 1 Answer to Question  What is the analysis backing up the claim that the losses will be reduced with the new corrector.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
Status of RF stations for NICA project MAC meeting october 2015.
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
MICE Power Supply System John Joseph LBNL Spectrometer Solenoid Controls & Monitoring Review Dec 11 th 2012.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
Proposed Conventional Sextupole for Installation at A0 Introduction (Dean Still) Reasons for installation- Reduce I in S6 feeddown sextupole circuit at.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
F Booster Long Straight Corrector Package Installation Craig Drennan 2007 Shutdown Planning Meeting April 6, 2007.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Haixin Huang AGS Cold Snake: Status and Plans.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
Muon Department Meeting Jerry Annala Staged Commissioning of Muon Campus 17 December 2015.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
Brian Drendel October 31, This talk  Beams-doc private/DocDB/ShowDocument?docid=4474https://beamdocs.fnal.gov/AD-
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
Report Technical Director Storage-Ring-Installation Completed
Powering the LHC Magnets
Potential Use of PEP-II Magnets by Project X
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Presentation transcript:

f Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007

f 2007 DOE Tevatron Operations Review – C. Drennan 2 Long Straight Corrector Upgrade STATUS AND INSTALLATION PLANS  Goal of the Corrector Upgrade  Corrector Magnet Status  Magnet Stands and Installation Plans  Power Supply Status and Schedule  Power Cables and Rack Installation  Corrector Control Status

f 2007 DOE Tevatron Operations Review – C. Drennan 3 Long Straight Corrector Upgrade  The Long Straight Corrector Upgrade will install 24 new corrector magnets for improved beam control in the vertical plane.  The 24 short straight correctors will be upgraded during the 2008 shutdown.

f 2007 DOE Tevatron Operations Review – C. Drennan 4 Corrector Goals  Specifications for new corrector system:  Position Control: Be able to produce 1 cm of beam motion at highest beam energy (8GeV). Be able to slew position 1 mm/ms up to the middle of the cycle.  Tune Control: Maintain tune arbitrarily close to upper integer resonance throughout cycle. Be able to switch from full field plus to full field minus in ~2 ms in order to rapidly switch tunes at transition time.  Sextupoles Total strength consistent with existing system. Increase slew rate to rapidly switch chromaticity at transition time.

f 2007 DOE Tevatron Operations Review – C. Drennan 5 Meeting the Goals

f 6 Long Straight Corrector Upgrade The first corrector package prototype in test stand at the Magnet Test Facility.

f 2007 DOE Tevatron Operations Review – C. Drennan 7 Long Straight Corrector Upgrade CORRECTOR MAGNET STATUS  Magnet Tests on First Prototype, BMA000  Thermal Tests (Passed), Beams-doc-2713-v1 Test performed at full supply current and maximum specified RMS current. Tested with full, half, and no water flow.  Electrical Parameters (Passed), Beams-doc-2700-v1 Simple measurement of magnet inductance and resistance  DC Field Strengths (Passed), Beams-doc-2711-v1 Meets booster specifications Field strengths measured along with hysteresis  DC Field Shapes (Passed), Beams-doc-2712-v1 Excellent to +/- 25 mm, Good to +/- 38 mm

f 2007 DOE Tevatron Operations Review – C. Drennan 8 Long Straight Corrector Upgrade CORRECTOR MAGNET STATUS  Magnet Tests on First Prototype, BMA000 --continued—  AC Slew Rate and Field Strength (Passed), Beams-doc-2714-v1  Field Harmonics Testing (Passed)  Other Corrector Documents  Coordinate System: Booster Corrector Magnet System Beams-doc-2632-v2  Specification For The Booster Corrector Magnets And Power Supplies, Beams-doc-1881-v5  Current Schedule  Core production well ahead of schedule.  First production coil set arrived 3/15/2007  First production corrector package complete 6/22/2007  24 th corrector package complete 8/27/2007 Detailed Schedule available upon request –

f 9 Long Straight Corrector Upgrade Status of BPM’s  New BPM's have been designed and will be available for installation. A late design revision was made in Feb Reference Jim Crisp, “Proposed Booster BPM Geometry”, Beams-doc-2221-v1

f 2007 DOE Tevatron Operations Review – C. Drennan 10 Long Straight Corrector Upgrade MAGNET STANDS AND INSTALLATION PLANS  New Stands are being design for the Corrector installation.  22 Locations use the standard design.  2 Locations require their own design.

f 2007 DOE Tevatron Operations Review – C. Drennan 11 Long Straight Corrector Upgrade  Standard Installation

f 2007 DOE Tevatron Operations Review – C. Drennan 12 Long Straight Corrector Upgrade  New Corrector Support

f 2007 DOE Tevatron Operations Review – C. Drennan 13 Long Straight Corrector Upgrade Special Case 1: L3 Dogleg  The new corrector package will mount between the dogleg magnets and the BEX magnet will move to where the current corrector is now.

f 2007 DOE Tevatron Operations Review – C. Drennan 14 Long Straight Corrector Upgrade Special Case 2: Injection Girder

f 2007 DOE Tevatron Operations Review – C. Drennan 15 Long Straight Corrector Upgrade  Mechanical Design Schedule

f 2007 DOE Tevatron Operations Review – C. Drennan 16 Long Straight Corrector Upgrade  Mechanical Installation Schedule

f 2007 DOE Tevatron Operations Review – C. Drennan 17 Long Straight Corrector Upgrade POWER SUPPLY STATUS AND SCHEDULE  New 40 Amp and 65 Amp power supply designs are tested and ready for production assembly bidding.

f 2007 DOE Tevatron Operations Review – C. Drennan 18 Long Straight Corrector Upgrade POWER SUPPLY STATUS AND SCHEDULE  Power Supply Production Schedule  Bid construction 3/19/2007 to 4/9/2007  Award contract 4/16/2007  Receive first units 5/7/2007  Receive 15 units per week 5/14/2007 to 7/2/2007  Production unit testing 5/21/2007 to 7/23/2007  Installation into Booster racks 6/11/2007 to 7/30/2007

f 2007 DOE Tevatron Operations Review – C. Drennan 19 Long Straight Corrector Upgrade POWER CABLES AND RACK INSTALLATION  Power cables are expected to arrive 3/31/2007 and will be pulled during the shutdown.  Sample run of cables have been tested in a Booster penetration

f 2007 DOE Tevatron Operations Review – C. Drennan 20 Long Straight Corrector Upgrade POWER CABLES AND RACK INSTALLATION  Rack mock up is being built in the Transfer Gallery area  This will include full set of amplifiers, bulk supply, control and monitoring electronics, and cooling hardware.  Empty Racks have been install in all 6 locations in the Booster gallery.  Racks have been equipped with the basic hardware and the AC power installation has begun.

f 21 Long Straight Corrector Upgrade Corrector Control Status  New Power Supply Ramp Controllers Available 5/30/07  Will output ACNET programmable current reference curves for the power amplifiers and monitor amplifier tracking.  Controller specifications available, Beams-doc-1882-v3  CAMAC C473 Users Manual available, Beams-doc-2361-v2

f 22 Long Straight Corrector Upgrade  ACNET / Software to support the new CAMAC ramp controller is available and in use in test areas.  The path for making the significant number of database entries and implementing the device change over is being charted.