Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.

Slides:



Advertisements
Similar presentations
Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
Advertisements

FPUA Storm Readiness 2007 Florida Public Service Commission Internal Affairs May 23, 2007 Craig Brewer- Superintendent of Electric T&D.
Lee County Electric Cooperative 2006 Hurricane Preparedness Plan.
Progress Energy Florida 2007 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 23, 2007.
JEA Storm Readiness 2006 Florida Public Service Commission Internal Affairs June 5, 2006 Presenter: Ted Hobson, VP, Fuels, Purchased Power & Compliance.
Westar Energy Emergency Preparedness and Restoration TFR Meeting June 26, 2012 Jim Tyler Director, Distribution Services.
APEC Earthquake Response Cooperative Program on Energy Supply Systems Australian Experience Mr Allan Gillespie FTSE Hon FIE Aust Chairman, Electricity.
ACKNOWLEDGEMENT: numerous photo contributions courtesy of Robert Stephenson of Facilities Joint Use Thanks, Rob!
Storm Hardening Initiatives Robert Schimmenti VP Engineering and Planning Consolidated Edison Company of New York, Inc. June 12, 2013.
Assumption University Thailand EE4503 Electrical Systems Design Introduction 1.
1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
Oregon Public Utility Commission Safety and Reliability Section Jerry Murray, Manager Bob Sipler, Utility Analyst What is an “Attachment”? … that’s easy!
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Experience you can trust. Hurricane Hardening Commission Staff Workshop on Electric Utility Infrastructure Richard E. Brown, PhD, PE Tallahassee,
APPA Engineering and Operations Technical Conference Atlanta, Georgia April 13-18, 2007 “Nailing the Basics” Earns Princeton, IL RP3 Diamond Award.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
Disaster Recovery: Lessons from Katrina Gail Ann McCreary, CRM Mississippi Power Company.
1 Oncor Electric Delivery Proposed Changes To The 2012 National Electrical Safety Code.
Introduction & Opening Remarks l Hurricanes of 2004 & 2005 highlight the need for a fresh look at these issues l We support this effort and will be active.
Florida Power & Light 2006 Hurricane Preparedness Plan June 5, 2006 Presented by: Geisha Williams.
Storm Hardening Workshop Docket No Verizon Florida, Inc. July 13, 2006.
After the Storm Recreated from Carolina Country, the monthly magazine of the N.C. Association of Electric Cooperatives The steps to restoring power Click.
PROPOSED CHANGES TO THE 2007 NATIONAL ELECTRICAL SAFETY CODE.
Experience you can trust. 1 Electric Infrastructure Hardening Rebuilding Utility Infrastructure LSU Center for Energy Studies Bill Snyder
Avian Protection Plans Cooperative Utility/Agency Efforts to Reduce Bird Mortality and Improve Service Reliability.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Substation Inspection Program. Mission Substation Incident The event occurred on December 20, 2003 during the peak Christmas shopping season A fire occurred.
FPSC Electric Utility Infrastructure Workshop Florida Municipal Electric Utilities Alan Shaffer Assistant General Manager - Delivery Lakeland Electric.
Utility Engineers, PC.  Generation  Transmission  Distribution.
POWER HOUSE.
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
Distribution Systems-General
Florida Municipal Electric Utilities May 6, 2009 Paul Kalv, Director City of Leesburg Electric Department Florida Public Service Commission Docket No.
Tampa Electric Company 2009 Hurricane Season Preparation Regan Haines Director, Energy Delivery May 6, 2009.
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2009 Hurricane Season Preparations Florida Public Utilities Company May 6, 2009.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2014 Hurricane Season Preparation Informal Meeting for Electric Utilities with Florida Public Service Commission Staff March 26, 2014.
2009 Hurricane Preparedness Richard Shaheen Sr. Director, Engineering & Technical Services May 6, 2009.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Hurricane Season Preparation Briefing Florida Public Service Commission May 1, 2008 Kevin Wailes General Manager – Electric Utility.
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
Transmission Substation 2004 Storm Season. Transmission & Substation 2 HURRICANE CHARLEY August 13, 2004 Transmission Sections Locked Out ………………………… 44.
2009 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 6, 2009.
2008 Hurricane Season Preparedness Briefing Gulf Power Company Presented by Andy McQuagge Power Delivery Services Manager May 1, 2008.
2015 Storm Readiness Report Kurt Miller, Director of Engineering Suwannee Valley Electric Cooperative, Inc.
2014 Storm Preparedness Jeff Brewer – Manager of Engineering Tri-County Electric Cooperative, Inc.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
Cooperative Continuity Management Bill Willingham Florida Electric Cooperatives Association, Inc. Tallahassee, FL.
Informal Meeting with FPSC Staff 2015 Hurricane Season Preparation March 18, 2015.
Maryland Public Service Commission 2006 Summer Reliability Status Conference May 16, 2006 Baltimore, MD.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
Presented by Leighton Porter, EIT Monte R. Lee & Company
2008 Hurricane Season Preparations
Florida Public Service Commission
Hurricane Preparedness Plan 2008
Personal Protective Equipment
Pacific Power Seismic Preparedness Update
Progress Energy Florida 2008 Hurricane Preparedness Florida PSC Hurricane Preparedness Meeting May 1, 2008.
2007 Hurricane Season Preparations
Florida PSC 2014 Hurricane Season Preparation
Florida PSC Hurricane Preparedness Meeting May 6, 2009
2007 Hurricane Season Preparedness Briefing
TxMAG presentation
Presentation transcript:

Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

LCEC Service Territory

Restoration Plan Plan Update –Began February 2007 –Complete May 2007 Employee Training –May 7 th through June 8 th

Transmission Preparation ActivityPercent Complete of YTD Goal (May) Bucket/ Climbing Inspection of Each Pole93% Flying Patrol100% Infra-Red Inspections100% Water Crossing Inspections100% GOAB Switch Adjustments100%

Substation Preparation ActivityPercent Complete of YTD Goal (May) Monthly Substation Inspections95% 230 kV Breaker Maintenance100% Transformer Maintenance400% (Note: Moved Transformer Maintenance to Spring) Substation Switch Maintenance30% (Note: Moved Switch Maintenance to Fall) Distribution Breakers80% Infra-Red Inspections100%

Distribution Preparation ActivityPercent Complete of YTD Goal (May) Three Phase Mechanical100% Single Phase Mechanical75% Single Phase Visual100% Distribution Switches250% Reclosers195% Infra-Red Inspection100% Avian Protection100%

Vegetation Management Preparedness ActivityPercent Complete of YTD Goal (May) 230 kV Transmission100% 138 kV Transmission100% Transmission ROW Mowing100% Three Phase Distribution100% Single Phase Distribution95%

Governmental Coordination Employee Liaison's staff the following Emergency Operations Centers in LCEC’s Service Area for Coordination of Activities: –Lee County –Collier County –City of Cape Coral –City of Marco Island –City of Sanibel Island

Standards of Construction LCEC's construction standards, policies, guidelines, practices, and procedures comply with the National Electrical Safety Code (ANSI C-2) [NESC]. Electrical facilities constructed through December 31, 2006 comply with the edition of the code in effect at the time of the facility’s initial construction.

Standards of Construction LCEC has construction standards, for required facilities, that meet the extreme wind loading standards specified by Figure 250-2(d) of the 2002 edition of the NESC. LCEC is an active participant in the Utility Sponsor Steering Committee on collaborative research efforts associated with storm hardening.

Standards of Construction Although not waterproof, LCEC's equipment and constructed facilities are designed to be water resistant. The majority of our underground facilities (excluding conduits and cables) are at or above existing/surrounding grade. Even with these design and installation considerations, LCEC experienced some significant damage to our underground facilities as the result of flooding and storm surges. On the other hand, it has been LCEC's experience that flooding and storm surges have little effect on overhead facilities whether part of an underground or overhead system.

Standards of Construction LCEC's standards for joint use provide clearances (distances) for conductors, equipment, and risers. The joint use agreements that are entered into with pole attachment parties detail the process for evaluating pole loading capacity. Additionally, the agreements define the responsibilities for pole reliability and upgrading. Currently, LCEC does not permit attachments to transmission poles.

Joint Use Survey LCEC is in the process of doing a System Wide Joint Use Survey –Verify Attachments –Identify any Clearance Violations –Identify any uncompleted field work