Arizona Corporation Commission Energy Workshop 2001-2002 February 16, 2001.

Slides:



Advertisements
Similar presentations
WECC TEPPC Meeting SWAT Update
Advertisements

Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
Arizona Corporation Commission Workshop
State of the Arizona Energy System Examining the current state of Arizona’s energy mix in the context of the Clean Power Plan.
Arizona Corporation Commission Summer Peak 2000 Preparedness Workshop May 17,
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
2/16/2001ACC Energy Workshop – Summer Preparedness 2001 and SS-1 SRP Summer Preparedness 2001 and 2002 Presented to the Arizona Corporation.
RB:UMT Arizona Corporation Commission Workshop on Natural Gas Infrastructure NOI February 13, 2004 Phoenix, Arizona.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
2006 BTA 8/5/ SSC-1 ACC BTA Requirements SRP’s Ten Year Plan Presentation Chuck Russell Salt River Project June 6, 2006 Phoenix, Arizona Arizona.
Energy Retreat Institute for Sustainability, Energy, and Environment May 8, 2014.
R Southwest Gas Corporation February 16, 2001 Southwest Gas Corporation Update on Factors Affecting Gas Prices n Storage u Storage levels continue below.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
NOI on Arizona Natural Gas Infrastructure Strawman Proposal and Workshop Comments of Sempra Energy Global Enterprises September 25, 2003.
5/17/2000Summer Preparedness /17/2000Summer Preparedness SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
Kinder Morgan Silver Canyon Pipeline Kinder Morgan Silver Canyon Pipeline Business Overview ACC Workshop NOI February 13, 2004.
California’s Electricity Situation Briefing for the staff of the U.S. House of Representatives February 9, 2001 Energy Information Administration (Updated.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
 2005 Pinnacle West Capital Corporation Special Open Meeting of the Arizona Corporation Commission 2005 Summer Assessment March 18, 2005 Arizona Public.
Demand Response in Midwest ISO Markets February 17, 2008.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
APS Ten-Year Plans th BTA Presentation John Lucas Manager Transmission Planning May 22, 2008.
Western Area Power Administration Summer Status Arizona Corporation Commission Special Open Meeting May 17, 2000.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
APS Overview Richard Nicosia. APS Snapshot Largest and longest serving electric utility Operations dating back to th largest employer headquartered.
03/22/07 ACC Open MeetingSummer Preparedness SRP Summer Preparedness 2007 Mike Hummel Manager – Supply & Trading and Gary Harper Manager - System.
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
Florida’s Electric Capacity and Fuel Needs Presentation by: James Dean Florida Public Service Commission to the: House Utilities and Telecommunications.
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
CALIFORNIA ENERGY COMMISSION Electricity Supply Adequacy in the West Daniel Nix Deputy Director California Energy Commission April 2000 Committee on Regional.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
12/15/ SS-1 Arizona Corporation Commission Special Open Meeting Gary Harper Manager, System Operations July 23, 2004 Phoenix, Arizona.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
APS Ten-Year Plans th BTA Presentation
Puerto Rico Electric Power
Renewable Power Resources within Florida and Alachua County What are the needs, and why Alternative Energy Subcommittee - Energy Conservation Strategies.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
Aliso Canyon Reliability Briefing to the Porter Ranch Community Advisory Committee Edward Randolph, Energy Division Director, California Public Utilities.
CALIFORNIA ENERGY COMMISSION Electricity Supply Adequacy in the West William J. Keese Chairman, California Energy Commission January 25, 2000 for the Harvard.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
3/18/ FUTURE LINES EXISTING LINES FUTURE 500kV SUBSTATIONEXISTING 500kV SUBSTATION ATTACHMENT A SALT RIVER PROJECT 500kV SYSTEM January 23,
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
Navajo Transmission System
APS Resource Management February 10, 2017
PMC Membership as of 5/1/2016 Enrolled TO Coordinating TO 1
Deliverability Maps for 2017 Peaking Capacity RFP
Michael I. Henderson ISO New England Inc.
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
Solar Energy Commercialization
Presentation transcript:

Arizona Corporation Commission Energy Workshop February 16, 2001

2 3/16/01ACCEnergy Workshop 2001/2002 Agenda California Energy Situation Update - Staff Energy Preparedness for 2001 and 2002 –Arizona Public Service Company –Salt River Project –Tucson Electric Power –Arizona Electric Power Cooperative –Western Area Power Administration –Southwest Gas Corporation Contingency Response Plan - Staff

3 3/16/01ACCEnergy Workshop 2001/2002 California Update

4 3/16/01ACCEnergy Workshop 2001/2002 Western Interconnection WSCC California Desert Southwest

WSCC EHV Transmission

Reference: NERC Reliability Assessment WSCC Data June 2000 Min.Reserve Min.Reserve Requirements

7 3/16/01ACCEnergy Workshop 2001/2002 History of Reserve Margins Per Dan Nix of CEC 5/17/00

8 3/16/01ACCEnergy Workshop 2001/2002 WSCC Generation Additions

9 3/16/01ACCEnergy Workshop 2001/2002 WSCC Generation Mix +28,189 +2,219

Wholesale Gas Supply Basins And Pipelines

11 3/16/01ACCEnergy Workshop 2001/2002 California ISO Forecast Per Dan Nix of CEC 5/17/00

WSCC NON-SIMULTANEOUS TRANSFER CAPABILITIES (MW) 4/00

75% OTC 90% OTC

Arizona EHV Transmission San Juan Navajo Glen Canyon North Gila Palo Verde Silver King Kyrene Liberty South Saguaro Vail Greenlee Cholla Mohave Mead Four Corners Springerville McKinley Tortolita Phoenix Tucson Yuma Westwing Coronad o Pinnacle Peak Transmission Import Constrained Area

15 3/16/01ACCEnergy Workshop 2001/2002 AZ-NM-S.Nev Reserve Requirements (MW) 1 Total Min. Reserve Load Year Resources Requirements Responsibility ,932 20,834 18, ,187 22,060 19, ,581 24,757 21, ,521 25,454 22, ,576 26,379 23, ,076 27,348 24, ,076 28,256 25, ,576 29,140 25, ,576 30,048 26, ,576 30,966 27,430 1 Per WSCC Information Summary, June , ,242 2,444

16 3/16/01ACCEnergy Workshop 2001/2002 Arizona-NM-S. NV Generation Mix +11,763

17 3/16/01ACCEnergy Workshop 2001/2002 Arizona Generation 2001

18 3/16/01ACCEnergy Workshop 2001/2002 New Arizona Generation 2002

19 3/16/01ACCEnergy Workshop 2001/2002 Staff Summary AZ Supply Plans Met WSCC Reserve Req & 2002 Dependent Upon New Plants Existing Gas Supply & Delivery is Critical and Subject to Curtailment New Plants Utilize Fuel Portfolio’s With Interruptible Gas Purchases But Sell Firm Electric Commodity Transmission Capacity Is Marginal With Local Transmission Import Constraints Exposed To System Deficiencies In WSCC

20 3/16/01ACCEnergy Workshop 2001/2002 What Actions Are Needed? Prepare a coordinated load reduction strategy –Voluntary reduction / Price induced ? –Emergency response Encourage distributed resource solutions Encourage new EHV transmission to accompany new plant additions ACC Web Site

21 3/16/01ACCEnergy Workshop 2001/2002 Questions ?