Geosciences group Organization. Organization of reservoir engineering tasks The too many shortcuts taken by BEOC in their basic evaluations, and the absence.

Slides:



Advertisements
Similar presentations
CHAPTER 7 Business Management.
Advertisements

Overview Click on slides to advance presentation Company Presentation Back to index page.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
MÉXICO M. Sc. JOSÉ LUIS FIGUEROA
Project Overview Enhancing Information and Communication system in GEFONT - Buddhi Acharya GEFONT.
S17: Field work. Session Objectives  To explain the manner in which field audit is carried out.  To explain the nature of evidence and the different.
Managing Distributed University Courses Sanna-Maria Räisänen Tampere University of Technology Institute of Software Systems.
Quality evaluation and improvement for Internal Audit
Roles of IT Personnel Unit Customer Service This is a facility that helps customers with wide-ranging questions relating to a specific company,
Intro to Business Chapter 7
Development plan and quality plan for your Project
Upstream solutions kazpetro technology ltd. Statement of Capability kazpetro technology ltd (Kazakhstan) delivers innovative exploration techniques, reservoir,
Training of National Judges INFO DAY Introduction to the new Call for Proposals 2014 Raffaella Battella - DG Competition.
Copyright © 2014, Drilling Info, Inc. All right reserved. All brand names and trademarks are the properties of their respective companies. 1 DI Geology.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
Unit 6 Working with Science: Level 2 BTEC First Unit content, section 1: Be able to investigate and demonstrate knowledge of the basic duties and responsibilities.
Sedimentology & Stratigraphy:
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Gudrun Nachtschatt, Peter Oberbichler Arbeitsmarktservice Österreich Targets and Activities of the benchmarking group Mutual Learning – Benchmarking among.
Data Analysis through SAP HANA TEAM4Solutions Capstone Presentation Michael Chepkwony, Julio Silveira, Mark Ryan Talabis, Hung Tran, Greg Zheng.
Visit us at E mail: Tele:
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Forum for Reservoir Characterisation, Reservoir Engineering and Exploration Technology Cooperation Officially opened by Jens Stoltenberg 17. November 1995.
Georex Group Integrated Expertise in the Service of the Petroleum Industry Over 35 years experience in geosciences GEOREX offers studies assistance in.
Workflow for Finding Bypassed Reserves in Mature Assets  Real Time Integration of Simulation, Seismic Interpretation, and Geophysics  Best Answers Possible.
Introduction to Petroleum Design
1 Air Quality Bureau Kaizen Event Report Out By: Modeling Meddlers October 6, 2006.
 Sana Riaz  Registration No  Saira Khalid  Registration No
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
Action Planning Webinar September 12 th Your speaker today Matt Roddan Director, Employee Research ORC International.
1 Welcome to Senior Design 4106 Fall 2005 Section B: Dr. Marc Goetschalckx Dr. Spyros Reveliotis Webpage: Acknowledgement:
1-1 System Development Process System development process – a set of activities, methods, best practices, deliverables, and automated tools that stakeholders.
Research & Technology Implementation TxDOT RTI OFFICE.
GEOLOGIST / GEOPHYSICIST (Intern / Full-time) At BP, we use leading-edge technology to supply energy—primarily oil and gas—to meet the growing world demand.
German Guidebook on the Implementation of the EC Water Framework Directive Dr. Harald Irmer Germany.
Avoid Disputes, Not Complaints Presented by: Stuart Ayres and Derek Pullen Stuart Ayres, Scheme Manager Derek Pullen, Scheme Adjudicator.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Position Opening Job Classification: Accounting Specialist – Accounts Receivable Opening Date: July 11, 2014 Location: Corporate Office - Chaparral Closing.
Evaluation of the Rapid Risk Factor Surveillance System (RRFSS) RRFSS Annual Workshop 20 June 2006.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Presentation and review of TTA-report: Exploration and Reservoir Characterisation Summary Background Project Proposal.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
Paulus obey DAPCEP 3/29/14. A petroleum engineer is involved in nearly all of the stages of oil and gas field evaluation, development and production.
PBIS Team: Establishing a Foundation for Collaboration and Operation.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
April 29th, Chapter 6 Decision Making 6.1 The Nature of Management decisions 6.1 The Nature of Management decisions 6.2The decision making process.
Classification: Internal Status: Draft Gullfaks Village 2010 IOR Challenges.
Project Management. Introduction  Project management process goes alongside the system development process Process management process made up of three.
Literacy Partner 2007 – 2008 The literacy partner supports student learning by collaborating with teachers and administrators to model best practices and.
FIELD SERVICE upstream solutions. statement of capability We deliver reservoir, well, and integrated field management services to the upstream oil and.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Read to Learn Describe the overall purpose of management. Discuss the four functions of management.
26 February 2016M253 Team working in distributed environments 1.
Team-Based Development ISYS321 Managing the Information Systems Project.
 Problem solving involves a number of well- defined steps, which are as follows:  Define the problem.  Analyze the problem.  Identify and evaluate.
- 1 - FINAL_NOScript_JDVerificationTraining pptx Job Titles Examples Used for HISD Nonexempt Jobs Assistant: Using knowledge of a functional area(s),
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
CodeClass 1 Course Title Interpretation of Reflection data & petroleum Exploration Credit Lecturer Kim, Ki Young Rm NS3-303 Office Hour By appointment.
GEOINFORMATIC DISCIPLINES FOR OIL&GAS GEOLOGISTS PEOPLES’ FRIENDSHIP UNIVERSITY OF RUSSIA Engineering Faculty Department of Mineral Deposits and Exploration.
Hospital Office Managers & Mailing List Thinking of marketing Lists? Think of Global B2B Contacts! Reach global business prospects with top.
PRESENTED BY MANISH CHAND TOMAR (115) IMAN SINGH(096) BTECH MECHANICAL-b 3 RD YR.
Job Titles Examples Used for HISD Nonexempt Jobs
ROLE of a Continuous Improvement LEADER
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Campus Locator – Definition Phase (May04-04)
CMGT 410 Perfect Education/ cmgt410.com.
Coventry, Jun, 2016 – Coordination of activities related to WP3 –
How to Conduct Effectively
Presentation transcript:

Geosciences group Organization

Organization of reservoir engineering tasks The too many shortcuts taken by BEOC in their basic evaluations, and the absence of any decent task schedule, show that the Reservoir Engineering group is presently understaffed and struggles to cope with the daily operational duties. It is generally accepted for significant operations such as the BEOC work program that operations and studies cannot be validly carried out by the same people. Proposal: – A team dedicated to operations – A team dedicated to reservoir studies – Ahead of both Operations and Studies, a pivot team composed of the reservoir & production engineering manager assisted by one database technician

reservoir engineering operations A team dedicated to operations is deemed necessary before the next offshore drilling campaign starts: at least two professionals, composed of one senior reservoir engineer and one or two juniors, responsible for operations follow-up, planning, data acquisition such as perforating, well testing, pressure recordings, production logging (design + implementation)

reservoir engineering studies A team dedicated to reservoir studies, reservoir issues of well proposals, also to performance prediction and reservoir monitoring & management: at least four professionals, composed of one reservoir modeling expert (Fevzi Gumrah) and three junior engineers

reservoir engineering management Ahead of both Operations and Studies, a pivot team composed of the reservoir & production engineering manager assisted by one database technician with strong IT background, in charge of updating and maintaining the production database and various reservoir softwares

Organization of Geological and geophysical tasks In terms of organization a clear distinction must be made between G&G professionals dealing with operations and the ones dealing with studies. It is highly probable that today everybody is working on operations. This will be even worse in the near future with the increase of drilling activity and writing of final geological reports. When an organization chart showing those two branches with names and seniority/résumés of everybody is provided, BTT is prepared to provide comments and suggestions to improve/recruit. Normally, senior and most reliable/autonomous personnel should be in the study group.

Three branches A team dedicated to Operation Geology A team dedicated to Geophysics A team dedicated to Production Geology

Operation Geology Regarding the operations, the Division head must at minimum – have standards for Drilling proposals (they probably have one) and for final geological reports at least – Have a time table showing the expected dates of spud/completion of wells and giving for each well The deadlines for (1) Drilling prognosis diffusion to partners (30 days before spud?) (2) Final geological report diffusion to partners (30 days after final log?) The name of the person (from the study group) responsible to issue those documents in time for each well

Geophysics Geophysics: Seismic cannot play its major role in supporting production geology and reservoir engineering activities: definition of accumulations and drilling target definitions, or blocks boundaries and reservoir imaging, or 2P, 3P and prospective reserves. These last ones will not be defined and efficiently evaluated (drilled) without a 3D support. BEOC needs a geophysical arm to manage acquisition first and supervise and coordinate all relevant activities including processing and interpretation.

Production Geology Studies Perform a quality control of the well tops reliability/anomalies. Checking/correcting structure map of each of the 13 main horizons for well location or directional surveys, for example, Perform a qualitative well log analysis in terms of lithology, fluids, and contacts. Lithology will be sand, possible sand, shale. Fluid will be oil, possible oil, possible water, water. Contacts will be ODT, OWC, and WUT. Correlate reservoirs, provide geological model to reconcile measured productions and reservoir pressures, etc. Such studies will most probably take more than two years. Consequently, given the necessary input from G&G, in the near future, for well location and prognosis, the work will start in focused sectors of the fields (i.e. specific projects such as Island area, P2 – block 7 area, BE-8/10 project, 208a/209 project…)

Production Geologists – In terms of personnel, a minimum of 2 senior, experienced, autonomous, creative geologists are required to carry this work full time – They will work in close, constant cooperation. A planning starting as described just above and extending tentatively until end 2013 will be prepared and presented to BEOC management ASAP. It will show what is the area expected to be completed by end It has to be a commitment to deliver from the G&G division so that they trust the added value of their specialists and waste no more time and money playing darts all year long.