TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.

Slides:



Advertisements
Similar presentations
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
Advertisements

SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
Alfonso Benot Morell, CERN BE-BI CLIC Module Working Group Meeting, 24 April 2013.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
From one module to a long string 6 th CLIC Advisory Committee February 3, 2011 Erik Adli, Department of Physics, University of Oslo, Norway.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
 Installation: equipment, waveguides, water cooling, local cabling  Upgrade of LEP equipment  Contract follow up: new klystrons, spare circulators.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
University of Oslo and CLIC Short overview for first “NorduCLIC” meeting Erik Adli and Steinar Stapnes, University of Oslo May 19, 2008.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
TBTS Test Program & Schedule G. Riddone
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
CLIC-ACE, Frank Tecker CTF3 program completion and upgrade to CTF3+ Frank Tecker – CERN for the CTF3 team CTF3 program completion and upgrade.
R. Corsini, CTF3 results in /2/2011 CLIC MEETING 1 CTF3 Experimental results in 2010 R. Corsini for the CTF3 Team.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
R. Corsini CLIC work-package planning meeting 2-3 November 2011 Introduction to the session.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
Status and plans of drive beam components and tests Status and plans of drive beam components and tests CLIC review, March 1 st, 2016Steffen Döbert, BE-RF.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Status of CIEMAT work on PETS
Work packages : Overview of experimental verification, CTF3 and CLIC Zero R. Corsini for the CLIC/CTF3 Collaboration Basically all WP scientific and.
WP5 Elliptical cavities
First Year of Operation at the Two-beam Test Stand
Steering algorithm experience at CTF3
CLEX* Status and Plans CTF3 complex CLEX
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
TBL, Status, Plans, Experiments
Have a chance to operate your own beam at CERN
CTF3 Collaboration Technical Meeting January 2008
LCWS 2017 – 26th October C. Rossi
Recent high-gradient testing results from the CLIC XBoxes
Measurements, ideas, curiosities
Accelerators R&D at IFIC “Reunión de Electrónicos”, May 2010
LCLS Gun Commissioning Status & Plans David H
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of series production  First results form commissioning  What’s next ? TBL upgrade

TBL vs CLIC PETS are designed to produce nominal CLIC power of 135 MW for nominal 28 A CTF3 current

TBL status  Beam line including PETS prototype installed all Quads on movers, BPM’s with new read out electronics, diagnostic section with emittance meter and time resolved spectrometer  First commissioning and measurements performed PETS qualified and found consistent up to 20 MW beam matching and transport performed end of line spectrometer tested BPM resolution measured Magnet movers tested  First commissioning and measurements performed PETS qualified and found consistent up to 20 MW beam matching and transport performed end of line spectrometer tested BPM resolution measured Magnet movers tested

TBL in CLEX

TBL commissioning

KlystronDrive beam RF power out RF power in Drive beam RF power out ASTA (SLAC) CTF3 (CERN + Collaborations) Two beam test stand (CERN + Collaborations) Objective: to understand the limiting factors for the PETS ultimate performce Objective: to demonstrate design rf parameters at the output of the PETS Test beam line (CERN + Collaborations) Objective: to demonstrate the beam transportation without looses and ~ 50% deceleration. PETS testing I. Syratchev What matters is the output section !

PETS, beam driven test TBL 20 MW power produced with a 10A beam according to predictions, form factor 0.9

PETS, power production PETS is a very sensitive diagnostics for the longitudinal beam structure, IQ-detectors used for power measurements

PETS, power production stability Current stability ~ 1.3%; P ~ I 2 Measured current stability in the CTF3 linac 9x10 -4

PETS, power production position correlation Offset: -5 mm;h -3 mm;v 0 mm; +2 mm;v +5 mm;h

Status of series production  Well defined program to produce next 8 tanks 3 by CIEMAT, 5 by CERN  Pacing item is the PETS itself  First set of 8 received (last week)  At CERN we prepared for clean room assembly  Hope to have 4 tanks installed in January, 8 tanks in summer 2011, 16 in 2012  India and BINP both made PETS prototypes as well (option for second series)

Status of series production First conform PETS bar for series production

Status of series production First conform PETS bar for series production

Status of series production SiC dampers for HOM installed on a PETS bar SiC prepared for baking at 950 deg C

Status of series production Two PETS bar’s from India

Status of series production Several couplers brazed and cold tested at CERN Series in production S11 S12

Plans for completion and feasibility demonstration  Goal to have 4 tanks installed in January 2011  Demonstration with 8 until summer 2011, >30% deceleration  Complete TBL with 16 PETS in 2012  Perform full experimental program afterwards >50% deceleration  Detailed program, see talks in DB working group

Plans for TBL beyond 2012  Upgrade TBL to a test facility relevant for CLIC TDR work  12 GHz power production for structure conditioning  Working experience with a real decelerator  Beam dynamics studies, pulse shaping, feedbacks, etc What can be done ? What is reasonable ?

Plans for TBL beyond 2012 TBL versus klystrons, additional value of TBL Klystron TBL+ Rep rate (Hz) slots2211 Number of units22168 hours/day24 12 days/year Rf-pulses/year5E+091E+104E+093E+08 TBL: Test of PETS and structure possible Closer to CLIC situation Less flexible for frequent changes in the set up 28 A needed for 135 MW/PETS 20 A for 70 MW/PETS 15 A for 70 MW/ for two PETS

Plans for TBL beyond 2012 How could it look like

Plans for TBL beyond 2012 Possible scenario to be studied further  TBL seem not ideal for around the clock conditioning facility (klystrons seem more suited)  But, TBL is a unique facility for conditioning R&D specific to CLIC  Create a limited number of testing slots (4-8) to do this kind of experiments, limited run time

Plans for TBL beyond 2012 What can be done with TBL+  Develop conditioning scenario for CLIC conditioning with beam / use of ON/OFF mechanism of PETS precondition with klystron and then with beam conditioning of PETS  Test bed for PETS development, ON/OFF, new designs, etc  Power production as a function of beam parameters alignment, stability, pulse shape, phase stability, beam loses, failure modes  Continue decelerator beam dynamics studies

Conclusion  TBL commissioning ongoing, feasibility demonstration can be started in 2011 with 8 PETS and finished with 16 in 2012  TBL+ - upgrade useful as a facility dedicated to conditioning experiments, essential for CLIC TDR phase  Working horse conditioning facility based on klystrons is needed in addition to support the structure development