4. Flow-Time Analysis Flow Time 1-Introduction Based on the book: Managing Business Process Flows.

Slides:



Advertisements
Similar presentations
EMBA-2, BUP Major Asad EO Chapter 5: Process Analysis.
Advertisements

QUAN 6610 Flow Time Analysis (T)
Process Analysis and Applications Module
Process Analysis If you cannot describe what you are doing as a process, you do not know what you are doing. W.E. Deming.
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 6: Developing a Project Plan
Project Management 6e..
Developing the Project Plan
Project Management Project Management
Developing a Project Plan
Estimating, scheduling and budgeting
Based on the book: Managing Business Process Flows
OPSM 301 Operations Management
11–1. 11–2 Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers are responsible for.
5.5.1 Plan of Operation 1 Guidelines for Implementation UPA Package 5, Module 5.
II N T R O D U C T I O N PP R E T E S T DD E S I G N I N G A L G O R I T H M DD E S I G N I N G F L O W C H A R T GG E N E R A L R U L E S F.
Lin/Operations/Process Analysis & Apps1 Process Analysis and Applications Module u Operational Measures: Time T, Inventory I, Throughput rate R »Link to.
Assignment Capacity.
4. Flow-Time Analysis Flow Time 3-Flow Time Reduction Levers Based on the book: Managing Business Process Flows.
Healthcare Operations Management © 2008 Health Administration Press. All rights reserved. 1.
1 4. Flow-Time Analysis Inventory adversely affects all competing edges (P/Q/V/D)  Has cost  Physical carrying costs  Financial costs  Causes obsolescence.
Systems Design: Process Costing 2/23/04
OM&PM/Class 2b1 1Operations Strategy –Class 1a: Introduction to OM –Class 1b: Strategic Operational Audits 2 Process Analysis –Class 2a + 2b: Process Flow.
Based on the book: Managing Business Process Flows.
INTRODUCTION TO BUSINESS
Flow Time and Theoretical Flow Time
1 3. Process Flow Measures MBPF Inc.: Consolidated Income Statement.
1 Ardavan Asef-Vaziri Sep-09Operations Management: Waiting Lines2  Made-to-stock (MTS) operations  Product is manufactured and stocked in advance of.
1 Process Management and Strategy Introduction 1Ardavan Asef-Vaziri Sep-09 Process -1 Business Process Management Building block of Operations Management.
Problem Solving Tools INSY 3021 Auburn University Spring 2008.
1 Process Mapping BA 339 Mellie Pullman. 2 Objectives Service Process Differences Little’s Law Process Analysis & Mapping.
Process Analysis and Applications Module
from Prof. Goldsman’s lecture notes
Polling: Lower Waiting Time, Longer Processing Time (Perhaps)
ELC 347 DAY 7. Agenda Questions Assignment 3 Due Assignment #4 posted  Due next week Group Progress report due next week Exam 2 next week  Same format.
Chapter 6, Process-Flow Analysis
OPSM 301: Operations Management Session 7: Process analysis Koç University Zeynep Aksin
Network Flows Based on the book: Introduction to Management Science. Hillier & Hillier. McGraw-Hill.
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.
Operations Managment Kristen’s Cookie - Lecture 4 (Chapters 4 and 5)
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
Based on the book: Managing Business Process Flows.
1 Process Management and Strategy Introduction 1Ardavan Asef-Vaziri Sep-09 Process -1 Processes A business process is a recurring network of activities.
© 2012 Prentice Hall Inc Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. 1-1 Copyright ©2013 Pearson Education, Inc. publishing.
So What? Operations Management EMBA Summer TARGET You are, aspire to be, or need to communicate with an executive that does not have direct responsibility.
Throughput Part 2 Effective Capacity & Utilization Based on the book: Managing Business Process Flows.
OPSM 501: Operations Management Week 4: Process analysis Kristen’s Cookie Koç University Graduate School of Business MBA Program Zeynep Aksin
Process View & Strategy Part 4- Some OM Tools and Techniques.
Operations Management For Competitive Advantage 1 Process Analysis Operations Management For Competitive Advantage Chapter 4.
Flow Rate and Capacity Analysis
1 Ardavan Asef-Vaziri Feb-2013Capacity- Basics Capacity  Case: Scharfen Berger Chocolate Maker  Throughput (Average Flow Rate): Average # of flow units.
Critical Chain Method These sides and note were prepared using 1. The book Streamlined: Building Lean Supply Chain Using the Theory of Constraints. Srinivasan.
Assignment Capacity. 2 Ardavan Asef-Vaziri March, 2015Capacity- Basics MamossaAssaf Inc. fabricates garage doors. Roofs are punched in a roof punching.
3-1Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
Principles of Linear Pipelining
5 © The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin 5 5 Slide 5-1 Target Costing,Theory of Constraints, and Life-Cycle Cost.
Lin/Operations/Managing Services1 Capacity Management in Services Module u Queuing processes and performance measures u Why do queues build up? u Performance.
Supply Chain Customer Order Decoupling Point
Key Learnings: Little’s Law
Example: A Hospital Emergency Room
Process Design and Analysis
Chapter 5 Process Analysis.
Problem 4.3 (a) The network of the Deluxe model
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
Assignment Capacity The recorded solution to the first problem is available at
Chapter 5 Process Analysis.
Presentation transcript:

4. Flow-Time Analysis Flow Time 1-Introduction Based on the book: Managing Business Process Flows

4. Flow-Time Analysis Competitive Advantages of a short flow time  Short response time both in production and in product design.  More responsive to changes in customer preferences and technological advancements.  Delayed differentiation, Postponement.  Moving from Made To Stock towards Make To Order.  Lower inventory costs, due to Little’s Law. Flow Time - Introduction2 Ardavan Asef-Vaziri, June, 2015

4. Flow-Time Analysis Direct Method of Measuring Flow Time  Randomly sample flow units over an extended period of time.  Measure the flow time for each flow unit from entry to exit.  Compute the average of flow times.  During a given month, a sample of 50 applications was taken  The average flow time = 20.8 working days. Flow Time - Introduction3Ardavan Asef-Vaziri, June, 2015

4. Flow-Time Analysis Indirect Methods of Measuring Flow Time  Count the number of units produced over an extended period of time.  R = number of units produced / duration of time period.  Count the number of units of inventory at random points during the time period. Compute the average inventory (I).  Compute flow time T =I/R 200 applications processed during 20 days; average throughput of R=200/20 = 10 applications per day. The number of waiting applications counted at 4 random points during these days added to 860. I= 860/4 =215. T = I/R  T = 215/10  flow time is 21.5 days vs 20.8 Flow Time - Introduction4Ardavan Asef-Vaziri, June, 2015

4. Flow-Time Analysis Process : Network of activities performed by resources 1-2. Flow unit (input/output) : Unit of analysis– Level of detail 3. Network of Activities & Buffers  Define Process Boundaries  Activities with activity times  Buffers with waiting times  Routes: precedence relationships (solid lines) with throughputs 4. Resources & Allocation  Who does what? 5. Information Structure & flow (dashed lines) Key for capacity analysis Process Flow Chart Flow Time - Introduction5Ardavan Asef-Vaziri, June, 2015

4. Flow-Time Analysis Flowcharting Activity Buffer Physical flow Event Information flow  See the total process; a systems view  Define flow units and process boundaries  Include only the key steps  Clarify the level of detail needed. Processes can be broken down into sub-activities. On the other hand, cascading allows several activities to be combined in a single sub-process  Depicts resources required to carry out activities  Identify the processes that need attention (weak points) Decision Flow Time - Introduction6Ardavan Asef-Vaziri, June, 2015

4. Flow-Time Analysis Wondershed Inc: Narrative Representation 1.Separate the roof and the base sheets 2. Punch the base 3. Punch the roof 4. Form the base 5. Form the roof 6. Weld the base 7. Assemble base and roof 8. Inspect Flow Time - Introduction7Ardavan Asef-Vaziri, June, 2015

4. Flow-Time Analysis End Wondershed Inc. : Schematic Representation Start Separate Sheet Punch base Punch roof Form base Form roof Wed base Inspect Assemble Start Activity A Activity B Activity C End Flow Time - Introduction8Ardavan Asef-Vaziri, June, 2015 Buffer Activity

4. Flow-Time Analysis Theoretical Flow Time Activity Time: The time required by a typical flow unit to complete the activity. Tp for a single activity. Theoretical Activity Time. Tp net of any waste inside Tp Unless stated otherwise, we assume that an activity cannot be broken down into smaller activities that can be executed in parallel. What does that mean??? Pure Theoretical Flow Time: The minimum amount of time required for processing a typical flow unit without any waiting and without any waste inside Tp. Theoretical Flow Time: The minimum amount of time required for processing a typical flow unit without any waiting. Flow Time - Introduction9Ardavan Asef-Vaziri, June, 2015

4. Flow-Time Analysis Critical Path Theoretical flow time of each path in the process flowchart = sum of the activity times of all activities on that path Critical Path: the longest path Critical Activities: activities that lie on the critical path Theoretical flow time of the process = Time of the theoretical critical path Activity Time 2Activity Time 1Activity Time 3 Activity Time 5Activity Time 4Activity Time 6 Sequential Activities Parallel Activities How many Paths? Activity Time 2Activity Time 1Activity Time 3 Activity Time 2Activity Time 1Activity Time 3 Flow Time - Introduction10Ardavan Asef-Vaziri, June, 2015

4. Flow-Time Analysis Wondershed Inc. Theoretical Flow Time Path 1 (roof) Start  1  3  5  7  8  End = 80 min Path 2 (base) Start  1  2  4  6  7  8  End = 90 min Theoretical Flow Time = 90 min Flow Time - Introduction11Ardavan Asef-Vaziri, June, 2015

4. Flow-Time Analysis Wondershed Inc. Flow Time Path 1 (roof) Start  1  3  5  7  8  End = 385 min Path 2 (base) Start  1  2  4  6  7  8  End = 370 min Flow Time = 385 min Flow Time - Introduction12Ardavan Asef-Vaziri, June, 2015

4. Flow-Time Analysis Flow Time Efficiencies in White Collar Processes Flow Time Efficiency = Theoretical Flow Time / Flow Time Flow Time Efficiency = 90/385 = 23.4% Flow Time - Introduction13Ardavan Asef-Vaziri, June, 2015