Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May CERN-GSI Technical Coordination Meeting Felix Wamers, Yu Xiang,
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Cryostat Production Readiness Review January 23, 2002 T. Nicol – Fermilab
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
DFBX Thermo-Mechanical Review
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
US LHC Accel Proj Review October 2003 Joseph Rasson LBNL Project Manager 1 LBNL Project Overview Joseph Rasson Jon Zbasnik Bill Elliott LBNL Presented.
1 LHC-DFBX DFBX Production Readiness Review Project Overview Joseph Rasson LBNL October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC ACCELERATOR.
1 LHC-DFBX Shipping Specification Steve Virostek LBNL Presented at the DFBX RFP Review October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC.
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT 24 Feb 2004 R. BossertCERN/KEK/FNAL Meeting 1 Inner Triplet Interconnects Electrical Connections.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
650 MHz Cryomodule -- Discussions at RRCAT October 2010 Tom Peterson, with Harry Carter, Camille Ginsburg, and Jim Kerby 19 Nov 2010.
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Roadmap for triplet cryostats
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Complementary ISTC Projects #3888, 3889p
Progress and Issues with VTS Upgrade
Far Detector Activities Late 2017 – Early 2018
Industrialization of previous projects
2K CB FDR Overview:  Agenda, Charge, Review Process
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
SNS PPU Cryomodule Thermal Shield
SNS PPU Cryomodule Vacuum Vessel
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley

DFBX PRR 10/23/02Tom Peterson -- US LHC Project2 DFBX (feed-box) -- design status One of six design variants (BFBXC/G, points 2 and 8 left) is complete and released (271 drawings) Engineering and top level drawings for the other five design variants are done. Some detailed drawings remain (about 100 unique drawings)

DFBX PRR 10/23/02Tom Peterson -- US LHC Project3 DFBX design meetings at LBL within the past year December 11, 2001, review of results of November 2001 vendor fabrication study (PHPK and Meyer Tool, also Tom Peterson review of drawings) February (with Fermilab) April (with Fermilab, including Tom Nicol) June (with Fermilab and Don Brown) August 6-8 (Don Brown reviewing drawings) August (with Fermilab, including Kerry Ewald) September 4-5 (with Fermilab, Rob Van Weelderen and Vladislav Benda from CERN) September (with Fermilab)

DFBX PRR 10/23/02Tom Peterson -- US LHC Project4 Vendor fabrication study In October and November, 2001, PHPK and Meyer Tool reviewed the full (but at the time incomplete) set of drawings for DFBXC/G Their charge was to “review the designs for manufacturability, including suggestions for design changes that would lead to cost reductions or more rapid fabrication.” The issues outlined during the fabrication study set the design agenda for the past year. The recommendations have almost all been incorporated into the design. In particular, a lot of attention has been given to tolerances, one of the main vendor recommendations

DFBX PRR 10/23/02Tom Peterson -- US LHC Project5 Design issues and their resolution– tolerances and dimensioning Tolerances were brought to the highest possible assembly level, such that they define the actual requirement

DFBX PRR 10/23/02Tom Peterson -- US LHC Project6 Design issues and their resolution-- helium vessel design Helium vessel access port weld detail with provisions for cutting Helium vessel supports carry bus duct bellows pressure forces; bus duct gusseted for stiffness Attachment of power lead chimney to top plate of vacuum vessel Vessel meets ASME code except helium access door weld

DFBX PRR 10/23/02Tom Peterson -- US LHC Project7 Design issues and their resolution-- helium vessel support design Thin vertical invar rods carry vertical loads; helium vessel hangs from vacuum vessel top plate Horizontal invar rods carry axial loads and provide lateral stability Static and dynamic load analyses for the vessel and support elements are complete

DFBX PRR 10/23/02Tom Peterson -- US LHC Project8 Design issues and their resolution-- helium piping design Pipes hang from G-10 support plates in the vertical risers. Pipes are free to slide in the other support plates. Bellows remain only in the main bus ducts and large pumping line. Braided flex hose takes magnet interconnect motion as well as DFBX contraction; used extensively to prevent transmission of axial pressure loads at flex elements

DFBX PRR 10/23/02Tom Peterson -- US LHC Project9 Special design features-- lambda plate, buswork, current leads Lambda plate R&D phase at LBL including prototype is a success. LBL will produce a pre-production unit with full length leads.

DFBX PRR 10/23/02Tom Peterson -- US LHC Project10 Special design features-- lambda plate, buswork, current leads Completed specification for splicing superconducting leads and qualification contract with each vendor.

DFBX PRR 10/23/02Tom Peterson -- US LHC Project11 Special design features-- lambda plate, buswork, current leads Pirelli is expected to deliver the first pair of HTS leads in November. Testing of the leads will be at Fermilab.

DFBX PRR 10/23/02Tom Peterson -- US LHC Project12 Special design features-- lambda plate, buswork, current leads Completed specification and RFP for purchase of conventional vapor cooled leads.

DFBX PRR 10/23/02Tom Peterson -- US LHC Project13 DFBX remaining design details Some details for five remaining variants –Some new pipe routing arrangements –Variations of large pumping line supports –Variations of small pipe G-10 supports –Beam tube cooling details –These details are just “variations on a theme”

DFBX PRR 10/23/02Tom Peterson -- US LHC Project14 DFBX remaining design details Some interconnect weld details are not resolved with CERN but need not be resolved before contract is placed

DFBX PRR 10/23/02Tom Peterson -- US LHC Project15 DFBX remaining design details Some instrumentation details –Two instrument conduits are still under design. LBL will provide these subassemblies to the vendor. –Naming convention for magnet thermometers still not resolved with CERN –These are not problems for the RFP

DFBX PRR 10/23/02Tom Peterson -- US LHC Project16 Design status for RFP Engineering is complete for all boxes; remaining details are variations on the complete design and do not present any new engineering problems One drawing package is complete The vendors will have one complete design package with which to start making their estimates The vendors have requested the one complete drawing package, rather than our holding the package until the other details are complete The vendors will have all remaining details well before their final proposals are due

DFBX PRR 10/23/02Tom Peterson -- US LHC Project17 Design Summary The DFBX design has been very thoroughly engineered, documented and reviewed. Issues raised by the various reviewers including the vendors have been addressed in the design and documentation. Vendors will have the option to make modifications in order to follow their standard practices, reduce their cost, or speed up production, with LBL approval. But the vendors have an excellent, detailed design as a baseline guide. Fermilab will continue to work closely with LBL throughout the contract negotiations and fabrication.