First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, 11-12 December 2001 Flavia Donno, Marco Serra for IT and WPs.

Slides:



Advertisements
Similar presentations
DataTAG WP4 Meeting CNAF Jan 14, 2003 Interfacing AliEn and EDG 1/13 Stefano Bagnasco, INFN Torino Interfacing AliEn to EDG Stefano Bagnasco, INFN Torino.
Advertisements

LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
WP2: Data Management Gavin McCance University of Glasgow November 5, 2001.
Andrew McNab - Manchester HEP - 17 September 2002 Putting Existing Farms on the Testbed Manchester DZero/Atlas and BaBar farms are available via the Testbed.
ATLAS/LHCb GANGA DEVELOPMENT Introduction Requirements Architecture and design Interfacing to the Grid Ganga prototyping A. Soroko (Oxford), K. Harrison.
LNL CMS M.Biasotto, Bologna, 29 aprile LNL Analysis Farm Massimo Biasotto - LNL.
NorduGrid Grid Manager developed at NorduGrid project.
1 CHEP 2000, Roberto Barbera Tests of data management services in EDG 1.2 ALICE Off-line Week,
Andrew McNab - EDG Access Control - 14 Jan 2003 EU DataGrid security with GSI and Globus Andrew McNab University of Manchester
Andrew McNab - Manchester HEP - 6 November Old version of website was maintained from Unix command line => needed (gsi)ssh access.
DataGrid is a project funded by the European Union CHEP 2003 – March 2003 – Title – n° 1 Grid Data Management in Action Experience in Running and.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Status of Globus activities within INFN (update) Massimo Sgaravatto INFN Padova for the INFN Globus group
Andrew McNab - Manchester HEP - 22 April 2002 UK Rollout and Support Plan Aim of this talk is to the answer question “As a site admin, what are the steps.
The EDG Testbed Deployment Details The European DataGrid Project
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
C. Loomis – Testbed Status – 28/01/2002 – n° 1 Future WP6 Tasks Charles Loomis January 28, 2002
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
KNMI Applications on Testbed 1 …and other activities.
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
Support for system administrators Feedback from site admins after Testbed1 experience 05/03/2002 4th EDG WS Paris G. Merino, IFAE.
Computational grids and grids projects DSS,
G RID M IDDLEWARE AND S ECURITY Suchandra Thapa Computation Institute University of Chicago.
DataGrid WP1 Massimo Sgaravatto INFN Padova. WP1 (Grid Workload Management) Objective of the first DataGrid workpackage is (according to the project "Technical.
Grid Workload Management Massimo Sgaravatto INFN Padova.
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
Edg Testbed Experience u EDG a short introduction u Services provided by the EDG Middleware u EDG Testbeds/CERN Testbeds.
Andrew McNabETF Firewall Meeting, NeSC, 5 Nov 2002Slide 1 Firewall issues for Globus 2 and EDG Andrew McNab High Energy Physics University of Manchester.
Author - Title- Date - n° 1 Partner Logo WP5 Summary Paris John Gordon WP5 6th March 2002.
05/29/2002Flavia Donno, INFN-Pisa1 Packaging and distribution issues Flavia Donno, INFN-Pisa EDG/WP8 EDT/WP4 joint meeting, 29 May 2002.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
TERENA 2003, May 21, Zagreb TERENA Networking Conference, 2003 MOBILE WORK ENVIRONMENT FOR GRID USERS. TESTBED Miroslaw Kupczyk Rafal.
Ariel Garcia LCG cluster installation, EGEE training, Ariel Garcia - IWR LCG Cluster Installation Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft.
GRIDS Center Middleware Overview Sandra Redman Information Technology and Systems Center and Information Technology Research Center National Space Science.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
Stephen Burke – Data Management - 3/9/02 Partner Logo Data Management Stephen Burke, PPARC/RAL Jeff Templon, NIKHEF.
University of Bristol 5th GridPP Collaboration Meeting 16/17 September, 2002Owen Maroney University of Bristol 1 Testbed Site –EDG 1.2 –LCFG GridPP Replica.
DataGRID Testbed Enlargement EDG Retreat Chavannes, august 2002 Fabio HERNANDEZ
Presenter Name Facility Name UK Testbed Status and EDG Testbed Two. Steve Traylen GridPP 7, Oxford.
DGC Paris WP2 Summary of Discussions and Plans Peter Z. Kunszt And the WP2 team.
WP1 WMS rel. 2.0 Some issues Massimo Sgaravatto INFN Padova.
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
December 26, 2015 RHIC/USATLAS Grid Computing Facility Overview Dantong Yu Brookhaven National Lab.
DataTAG: Glue schema test C.Vistoli DataTAG Wp4 Meeting 23/5/2002.
Maite Barroso - 10/05/01 - n° 1 WP4 PM9 Deliverable Presentation: Interim Installation System Configuration Management Prototype
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Grid2Win : gLite for Microsoft Windows Roberto.
Yannick Patois - Datagrid Software Repository Presentation - March, n° 1 Datagrid Software Repository Presentation CVS, packages and automatic.
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
Summary from WP 1 Parallel Section Massimo Sgaravatto INFN Padova.
Andrew McNab - Globus Distribution for Testbed 1 Globus Distribution for Testbed 1 Andrew McNab, University of Manchester
Data Management The European DataGrid Project Team
The EDG Testbed The European DataGrid Project Team
Site Certification Process (Round Table) Fabio Hernandez IN2P3 Computing Center - Lyon October
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
Gennaro Tortone, Sergio Fantinel – Bologna, LCG-EDT Monitoring Service DataTAG WP4 Monitoring Group DataTAG WP4 meeting Bologna –
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
Tests at Saclay D. Calvet, A. Formica, Z. Georgette, I. Mandjavidze, P. Micout DAPNIA/SEDI, CEA Saclay Gif-sur-Yvette Cedex.
Stephen Burke – Sysman meeting - 22/4/2002 Partner Logo The Testbed – A User View Stephen Burke, PPARC/RAL.
Bob Jones – Project Architecture - 1 March n° 1 Project Architecture, Middleware and Delivery Schedule Bob Jones Technical Coordinator, WP12, CERN.
II EGEE conference Den Haag November, ROC-CIC status in Italy
Consorzio COMETA - Progetto PI2S2 UNIONE EUROPEA Grid2Win : gLite for Microsoft Windows Elisa Ingrà - INFN.
INFSO-RI Enabling Grids for E-sciencE Padova site report Massimo Sgaravatto On behalf of the JRA1 IT-CZ Padova group.
The EDG Testbed Deployment Details
Sergio Fantinel, INFN LNL/PD
CMS report from FNAL demo week Marco Verlato (INFN-Padova)
The EU DataGrid Fabric Management Services
Presentation transcript:

First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs LCFG group Test suite group

Outline u Common installation platform: n SE, CE, WN, UI list of RPMs (basic for a site to join) n Manual and automatic (via WP4 tools) configuration u The Resource Broker, Logging & Bookeeping, Information Index n Special cases. Only few needed. Installation instructions are coming. Good support from WP1 u Creating a test suite to avoid most common problems. It can be used to verify an installation before joining testbed n SE test suite (under testing) n CE test suite (few addition missing) n WN and UI test suite (only basic functionalities are tested. Almost ready) u Wide deployment

Common Installation Platform (1) u Installation of an SE: n For what concerns Globus2: s GRIS s gsincftpd n The SE information providers implemented by WP5/WP3 n The GDMP server and client libraries by WP2 n In /etc/grid-security all the RPMs concerning the “trusted” EDG CAs should be installed. n A proper grid-mapfile needs to exist to allow for GDMP transfers. n GDMP needs to be properly configured n Optionally a gatekeeper for issuing gdmp commands remotely

Common Installation Platform (2) u Installation of a CE: n For what concerns Globus2: s GRAM s GRIS n The CE information providers implemented by WP4/WP3 n The local logger services (provided by WP1) n Since a running job can update the Replica Catalog (RC) with new “produced” data (by the job), it is necessary to install the RC API (provided by WP2) n Since a running job can query info about the close SEs, then, it is necessary to install the GDMP BrokerInfo API provided by WP2 n Grid-mapfile and /etc/grid-security/certificates in place n A LRMS (Local Resource Management System) must be installed and properly configured (only PBS and LSF are supported) from sys-admin

Common Installation Platform (3) u Installation of a WN: n For what concerns Globus2: s gridftp client n Since a running job can update the Replica Catalog (RC) with new data “produced” by the job, it is necessary to install the RC API (provided by WP2) n Since a running job can query info about the close SEs, then, it is necessary to install the GDMP BrokerInfo API provided by WP2 n /etc/grid-security/certificates in place n A LRMS client must be installed and properly configured (only PBS and LSF are supported) from sys-admin

Common Installation Platform (4) u Installation of a UI: n For what concerns Globus2: s services required by the user (eventually none) n UserInterface as provided by WP1 n User accounts and certificates n /etc/grid-security/ in place n VERY LIGHT INSTALLATION

Installation and Configuration via LCFG u The deployment of testbed sites, requires a common installation and configuration tool. A LCFG working group has been created to: n “integrate” all software needed (OS, Globus, WPs middleware, Applications) s test the RPM compatibility/dependencies and the full installation procedure n prepare a “LCFG toolkit” for automatic installation and configuration of testbed machines (SE, CE, WN, UI) n provide documentation and help for farm administrators s to install quickly a new machine s also for users management, NFS, …

LCFG kit summary u “LCFG toolkit” for automatic installation and configuration of testbed machines: n RPM lists (ComputingElement.h, StorageElement.h, …) n set of configuration/templates files u LCFG Globus object for configuration of Globus components n different actions for CE, SE, UI u Web page with software and installation guide: n n ……… moving to the official documentation site

Test suite u We put together a test suite per machine type to avoid most frequent errors: n Configuration problems for the various machine types (missing rpms) n Miss-configured grid-mapfiles (CE,SE,UI) n CRLs expired or /etc/grid-security/certificates not correct. (CE,WN,SE,UI) n home directories not exported/mounted via NFS (between CE and WNs) n GRIS not answering correctly/Information Providers not correctly configured. (CE,SE) n Main Globus commands(CE) n gsincftp(SE,CE,WN) n GDMP commands(SE) n Replica Catalogue/BrokerInfo operations.(SE, CE, WN) n WP1 UI commands/configuration(UI) u Still under development … for the moving target

Wide deployment u To verify that what we produced was useful: n LCFG installation and the developed configuration objects successfully tested (alpha15+ … beta21 ??). n Some sites already tried out the produced templates and the instructions n The work done has been a very good starting point to test a farm-installation procedure to join testbed1, and useful tools have been produced u The tools are ready to start a wide deployment of the testbed1 farms.

Conclusions u The machine types defined seem to be OK u Lists/Templates produced are valid and LCFG objects make (~)automatic the process of setting up a site n (with a 100Mb/s network ~10 min to install a node) u The testing suite is a good starting point for a validation process. A more comprehensive test is needed, but preconfigured testing “services” need to be in place u The process of registering a site which has passed the validation tests can be made more automatic u The tools are ready to start a wide deployment of the testbed1 farms.