David Adams ATLAS DIAL status David Adams BNL November 21, 2002 ATLAS software meeting GRID session.

Slides:



Advertisements
Similar presentations
Dual use tools: requirements and design David Adams BNL November 20, 2013 ASG tools working group.
Advertisements

Sphinx Server Sphinx Client Data Warehouse Submitter Generic Grid Site Monitoring Service Resource Message Interface Current Sphinx Client/Server Multi-threaded.
David Adams ATLAS DIAL Distributed Interactive Analysis of Large datasets David Adams BNL March 25, 2003 CHEP 2003 Data Analysis Environment and Visualization.
Grid Collector: Enabling File-Transparent Object Access For Analysis Wei-Ming Zhang Kent State University John Wu, Alex Sim, Junmin Gu and Arie Shoshani.
Current Monte Carlo calculation activities in ATLAS (ATLAS Data Challenges) Oxana Smirnova LCG/ATLAS, Lund University SWEGRID Seminar (April 9, 2003, Uppsala)
David Adams ATLAS DIAL Distributed Interactive Analysis of Large datasets David Adams BNL June 23, 2003 GAE workshop Caltech.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Alexandre A. P. Suaide VI DOSAR workshop, São Paulo, 2005 STAR grid activities and São Paulo experience.
David Adams ATLAS DIAL Distributed Interactive Analysis of Large datasets David Adams BNL July 15, 2003 LCG Analysis RTAG CERN.
David Adams ATLAS ATLAS Distributed Analysis David Adams BNL March 18, 2004 ATLAS Software Workshop Grid session.
03/27/2003CHEP20031 Remote Operation of a Monte Carlo Production Farm Using Globus Dirk Hufnagel, Teela Pulliam, Thomas Allmendinger, Klaus Honscheid (Ohio.
David Adams ATLAS AJDL: Analysis Job Description Language David Adams BNL December 15, 2003 PPDG Collaboration Meeting LBL.
CERN IT Department CH-1211 Genève 23 Switzerland t Internet Services Job Monitoring for the LHC experiments Irina Sidorova (CERN, JINR) on.
ATLAS DIAL: Distributed Interactive Analysis of Large Datasets David Adams – BNL September 16, 2005 DOSAR meeting.
David Adams ATLAS DIAL status David Adams BNL July 16, 2003 ATLAS GRID meeting CERN.
David Adams ATLAS ATLAS Distributed Analysis Plans David Adams BNL December 2, 2003 ATLAS software workshop CERN.
DOSAR Workshop, Sao Paulo, Brazil, September 16-17, 2005 LCG Tier 2 and DOSAR Pat Skubic OU.
David N. Brown Lawrence Berkeley National Lab Representing the BaBar Collaboration The BaBar Mini  BaBar  BaBar’s Data Formats  Design of the Mini 
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
2nd September Richard Hawkings / Paul Laycock Conditions data handling in FDR2c  Tag hierarchies set up (largely by Paul) and communicated in advance.
Datasets on the GRID David Adams PPDG All Hands Meeting Catalogs and Datasets session June 11, 2003 BNL.
November SC06 Tampa F.Fanzago CRAB a user-friendly tool for CMS distributed analysis Federica Fanzago INFN-PADOVA for CRAB team.
Submitting jobs to the grid Argonne Jamboree January 2010 R. Yoshida (revised March 2010) Esteban Fullana.
Status report from T2K-SK group Task list of this group discussion about NEUT Kaneyuki, Walter, Konaka We have just started the discussion.
David Adams ATLAS ADA, ARDA and PPDG David Adams BNL June 28, 2004 PPDG Collaboration Meeting Williams Bay, Wisconsin.
Introduction Advantages/ disadvantages Code examples Speed Summary Running on the AOD Analysis Platforms 1/11/2007 Andrew Mehta.
INFSO-RI Enabling Grids for E-sciencE ATLAS Distributed Analysis A. Zalite / PNPI.
David Adams ATLAS Architecture for ATLAS Distributed Analysis David Adams BNL March 25, 2004 ATLAS Distributed Analysis Meeting.
Questions for ATLAS  How can the US ATLAS costs per SW FTE be lowered?  Is the scope of the T1 facility matched to the foreseen physics requirements.
9-13/9/03 Atlas Overview WeekPeter Sherwood 1 Atlfast, Artemis and Atlantis What, Where and How.
David Adams ATLAS DIAL/ADA JDL and catalogs David Adams BNL December 4, 2003 ATLAS software workshop Production session CERN.
David Adams ATLAS ADA: ATLAS Distributed Analysis David Adams BNL June 7, 2004 BNL Technology Meeting.
Evolution of a High Performance Computing and Monitoring system onto the GRID for High Energy Experiments T.L. Hsieh, S. Hou, P.K. Teng Academia Sinica,
GDB Meeting - 10 June 2003 ATLAS Offline Software David R. Quarrie Lawrence Berkeley National Laboratory
David Adams ATLAS Virtual Data in ATLAS David Adams BNL May 5, 2002 US ATLAS core/grid software meeting.
David Adams ATLAS ATLAS Distributed Analysis David Adams BNL September 30, 2004 CHEP2004 Track 5: Distributed Computing Systems and Experiences.
D. Adams, D. Liko, K...Harrison, C. L. Tan ATLAS ATLAS Distributed Analysis: Current roadmap David Adams – DIAL/PPDG/BNL Dietrich Liko – ARDA/EGEE/CERN.
David Adams ATLAS DIAL: Distributed Interactive Analysis of Large datasets David Adams BNL August 5, 2002 BNL OMEGA talk.
PROOF and ALICE Analysis Facilities Arsen Hayrapetyan Yerevan Physics Institute, CERN.
David Adams ATLAS DIAL Distributed Interactive Analysis of Large datasets David Adams BNL November 17, 2003 SC2003 Phoenix.
Korea Workshop May GAE CMS Analysis (Example) Michael Thomas (on behalf of the GAE group)
David Adams ATLAS ATLAS Distributed Analysis: Overview David Adams BNL December 8, 2004 Distributed Analysis working group ATLAS software workshop.
Using Ganga for physics analysis Karl Harrison (University of Cambridge) ATLAS Distributed Analysis Tutorial Milano, 5-6 February 2007
JAS and JACO – Status Report Atlas Graphics Group August 2000 Tony Johnson.
David Adams ATLAS ATLAS-ARDA strategy and priorities David Adams BNL October 21, 2004 ARDA Workshop.
1 OO Muon Reconstruction in ATLAS Michela Biglietti Univ. of Naples INFN/Naples Atlas offline software MuonSpectrometer reconstruction (Moore) Atlas combined.
ATLAS-specific functionality in Ganga - Requirements for distributed analysis - ATLAS considerations - DIAL submission from Ganga - Graphical interfaces.
- GMA Athena (24mar03 - CHEP La Jolla, CA) GMA Instrumentation of the Athena Framework using NetLogger Dan Gunter, Wim Lavrijsen,
David Adams ATLAS Datasets for the Grid and for ATLAS David Adams BNL September 24, 2003 ATLAS Software Workshop Database Session CERN.
TAGS in the Analysis Model Jack Cranshaw, Argonne National Lab September 10, 2009.
Introduction to the Athena Software Hong Ma BNL Athena Tutorial USATLAS Software Workshop.
ATLAS Distributed Analysis Dietrich Liko IT/GD. Overview  Some problems trying to analyze Rome data on the grid Basics Metadata Data  Activities AMI.
Distributed Analysis Tutorial Dietrich Liko. Overview  Three grid flavors in ATLAS EGEE OSG Nordugrid  Distributed Analysis Activities GANGA/LCG PANDA/OSG.
David Adams ATLAS ATLAS Distributed Analysis (ADA) David Adams BNL December 5, 2003 ATLAS software workshop CERN.
David Adams ATLAS ATLAS Distributed Analysis and proposal for ATLAS-LHCb system David Adams BNL March 22, 2004 ATLAS-LHCb-GANGA Meeting.
Planning Session. ATLAS(-CMS) End-to-End Demo Kaushik De is the Demo Czar Need to put team together Atlfast production jobs –Atlfast may be unstable over.
David Adams ATLAS AJDL: Abstract Job Description Language David Adams BNL June 29, 2004 PPDG Collaboration Meeting Williams Bay.
David Adams ATLAS ADA: ATLAS Distributed Analysis David Adams BNL December 15, 2003 PPDG Collaboration Meeting LBL.
ATLAS DIAL: Distributed Interactive Analysis of Large Datasets David Adams Brookhaven National Laboratory February 13, 2006 CHEP06 Distributed Data Analysis.
Thomas Ruf, CERN EP Experience with C++ and ROOT used in the VX Beam Test Thomas Ruf, CERN, EP  Why? Event structure for VX-data rather complex: raw hits.
ATLAS TIER3 in Valencia Santiago González de la Hoz IFIC – Instituto de Física Corpuscular (Valencia)
BES III Software: Beta Release Plan Weidong Li 19 th October 2005.
ATLAS Physics Analysis Framework James R. Catmore Lancaster University.
PanDA HPC integration. Current status. Danila Oleynik BigPanda F2F meeting 13 August 2013 from.
David Adams ATLAS DIAL Distributed Interactive Analysis of Large datasets David Adams BNL May 19, 2003 BNL Technology Meeting.
ANALYSIS TRAIN ON THE GRID Mihaela Gheata. AOD production train ◦ AOD production will be organized in a ‘train’ of tasks ◦ To maximize efficiency of full.
David Adams ATLAS Hybrid Event Store Integration with Athena/StoreGate David Adams BNL March 5, 2002 ATLAS Software Week Event Data Model and Detector.
LHCb Computing Model and Data Handling Angelo Carbone 5° workshop italiano sulla fisica p-p ad LHC 31st January 2008.
ADA aodhisto transformation
ADA analysis transformations
Presentation transcript:

David Adams ATLAS DIAL status David Adams BNL November 21, 2002 ATLAS software meeting GRID session

David Adams ATLAS November 21, 2002DIAL status ATLAS SW – GRID session2 Goals of DIAL Demonstrate the feasibility of interactive analysis of large datasets Large means too big for interactive analysis on a single CPU Set requirements for GRID middleware Provide ATLAS with a tool to analyze DC1 and DC2 event data More that just ntuples Large samples Distributed data and processing

David Adams ATLAS November 21, 2002DIAL status ATLAS SW – GRID session3 What is DIAL? Distributed Data and processing Interactive Prompt response (seconds rather than hours) Analysis of Histograms, event selection, … Large datasets Any event data (not just ntuples or tag)

David Adams ATLAS November 21, 2002DIAL status ATLAS SW – GRID session4 What is DIAL? (cont) DIAL provides a connection between Interactive analysis framework –ROOT –Afrodita? Data processing application –Athena User supplies task Defines result –E.g. histogram C++ code snippet to fill result

David Adams ATLAS November 21, 2002DIAL status ATLAS SW – GRID session5 What is DIAL? (cont) Scheduler Accepts dataset, task and application from user Splits dataset along event boundaries Creates and submits a job for each sub-dataset Concatenates results from jobs Makes combined result available to the user Provides status reports –Fraction of events processed –Estimated time to completion –Partial results

David Adams ATLAS November 21, 2002DIAL status ATLAS SW – GRID session6 DIAL interactions Analyzer Job 1 Job 2 ApplicationTask Dataset 1 Scheduler 1. Create or locate 2. select3. Create or select 4. select 8. create(app,tsk,ds1) 5. submit(app,tsk,ds) 8. create(app,tsk,ds2) 6. split Dataset Dataset 2 7. create e.g. ROOT e.g. ATHENA (Afrodita?) Result 9. fill 10. cat

David Adams ATLAS November 21, 2002DIAL status ATLAS SW – GRID session7 Status Datasets Generic implementation in place – Includes AthenaRoot MC track and vertex DIAL All components in place – Simple scheduler –local (same node) –creates a single processing job

David Adams ATLAS November 21, 2002DIAL status ATLAS SW – GRID session8 Future Dataset Zebra hits and digits (DC1-1) AthenaRoot reco objects (DC1-2) POOL EventCollection all objects (DC2) Scheduler Remote processing Multiple jobs (splitting input dataset) GRID integration –Big deal