Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Lisa Grow Vice President, Delivery Engineering & Operations Our Energy Future.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
Federal Energy Regulatory Commission Pat Wood III, Chairman Regional Grid Development Pat Wood, III Kansas Transmission Summit September 8, 2004.
Infrastructure Planning: Non-Transmission Alternatives 2010 NASUCA Mid-Year Meeting San Francisco, June 15, 2010 Drew Murphy NRG Executive Vice President.
Jim Larranaga Men’s Basketball Head Coach, AP National Coach of the Year University of Miami Our Formula for Success: The Miami Way.
Resource Adequacy in PJM
BOSTON DALLAS DENVER LOS ANGELES MENLO PARK MONTREAL NEW YORK SAN FRANCISCO WASHINGTON Renewables in the Northeast Local Opportunities, National Context.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Queue Reform at the Midwest ISO NARUC February, 2008.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
Expanding and Modernizing the Electrical Grid: Essential Infrastructure for the Midwest’s Clean Energy Future Des Moines Public Library Des Moines, IowaOctober.
SD Energy Infrastructure Authority “Transmission 101” June 9, 2006 Mike Risan Senior Vice President, Transmission Basin Electric Power Cooperative Mike.
WIND ENERGY CAMI GHANBARABBASI, KRISTEN RUNDSTEIN AND RACHEL STEINER.
The Continuing Evolution of U.S. Electricity Markets
BOSTON CHICAGO DALLAS DENVER LOS ANGELES MENLO PARK MONTREAL NEW YORK SAN FRANCISCO WASHINGTON Governors’ Wind Energy Coalition November, 2011 Competitive.
Infrastructure, Regulators and Utilities in the World of RTOs and Electricity Markets Steve Gaw, Commissioner, Missouri Public Service Commission President.
AMERICAN PUBLIC POWER ASSOCIATION NATIONAL MEETING Salt Lake City June 15, 2009 Panel: “WHAT DOES IT TAKE TO GET TRANSMISSION BUILT?” Remarks of James.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
The Transmission Imperative November 3, 2011 Jay Caspary.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
An Overview of Our Regulatory Proposal
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
Montana Ambassadors Helena, Montana February 25, 2011.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
The Value of Electric Transmission NASUCA Mid-Year Meeting June 25, 2012.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
1 Are We Ready For The Future? 2005 NIPPC Annual Meeting September 8, 2005 Michael R. Niggli President, Sempra Generation.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Pat Wood III, Chairman Federal Energy Regulatory Commission Bringing Power to California Customers Silicon Valley Manufacturing Group May 27, 2004.
ThinkEquity Summer Call Series “CAN WE DEAL WITH THE CHALLENGES TO GETTING TRANSMISSION BUILT?” Remarks of James J. Hoecker Husch Blackwell Sanders LLP.
Southwest Renewable Energy Transmission Conference May 21, 2010 Jeff Mechenbier Director Transmission & Distribution Planning and Contracts.
BUILDING THE NEXT ERA OF CLEAN ENERGY 2010 Mid-America Regulatory Conference - Integrating Renewables to the Grid F. Allen Wiley Vice President, Business.
Reactive Power Federal Energy Regulatory Commission Open Meeting December 15, 2004.
Kansas Renewable Energy Conference September 26th, 2007.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
1 Clean Line Energy National Association of State Utility Consumer Advocates Charleston SC Annual Meeting June 2012.
Updated 1/28/2011.
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
Transmission Issues & Renewables Perspectives of a Wind Developer.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Monterey Plaza Hotel October 8-10, 2007
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
GETTING ENOUGH COAL: MORE THAN A THREE LEGGED STOOL DAY ONE KEYNOTE: NOVEMBER 2, 2006 COAL NEEDS POWER COMPETITION TO SUCCEED John E. Shelk.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
1.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Energy and Environmental Policy Renewable Energy: Wind Presented by: Adam Smith Damien Hammond Veera Kondapi Jeff Gruppo.
R ENEWABLE E NERGY IN T EXAS Jess Totten Public Utility Commission of Texas 1.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Sun City U.S.A "New Day in the Sun". Peak Electric Demand Growing.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Grid Modernization and the Energy Policy Act of 2005
Clair Moeller Mid-Continent ISO
Panel II - Future of Competitive Transmission in the PJM Footprint December 1, 2016 Chip Richardson – PPL Electric Utilities.
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Gordon van Welie, President & Chief Executive Officer
Presentation transcript:

Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008

2 The United States has abundant wind resources It is estimated there are 8,000 GW of wind energy that can be economically delivered to customers….

3 No country—in a single year—has added the volume of wind that the US put in service last year Rising concerns over climate change and public policies favoring wind generation are spurring the tremendous growth in wind energy…

4 Compound Annual Growth Rate of 19% Installed GigaWatts (GW) Source: Emerging Energy Research The U.S. wind market is expected to double from 2006 to 2009, and double again by 2015 The U.S. wind market is growing rapidly and is forecasted to continue

5 Texas still leads all states in wind growth by a wide margin Source: AWEA; Cumulative megawatts (MW)/As of 1/08

6 Wind development is expected to be robust for the foreseeable future

7 FPL Energy operates wind generating facilities in 15 states and in Canada FPL Energy’s wind portfolio at year end of 2007

8 U.S. market leader with 30% market share –5,077 net MW in operation at 1/1/08 –1,100+ MW expected to be added during 2008 –FPL Energy wind investment ~$8 billion by year end 2008 Adding 8 – 10,000 MW in 2007 – 2012 –$ billion expected new investment FPL Energy is the U.S. leader in wind development FPL Energy was largest developer again in 2007

9 Source: Emerging Energy Research 2007 Installed Wind Capacity Top 10 U.S. Wind Developers The number of large wind developers is growing as US wind market tops over 5,000 MW added in 2007 New players are emerging in the U.S…..

10 And more are on the way….

11 Ensuring greater wind growth requires policymakers to address well known regulatory and transmission challenges Who will build? What is the cost? Who decides Who pays? How to maintain reliability? Surging wind growth is forcing policymakers to confront old challenges with new sense of urgency

12 Location constrained resource Resource constrained interconnection points Resource remote from load Transmission lines needed to support this variable resource Wind faces unique challenges Transmission is the critical path for wind development

13 Queue Management Transmission Planning & Investment Cost Allocation & Cost Recovery Transmission Siting Key Regulatory Challenges Transforming the transmission system for wind Eliminating barriers to greater transmission investment will determine pace and direction of renewable development in US

14 The Interconnection Problem First-come, first-served” queue management Minimum deposits Minimal Land Control Requirements 3-year, no-cost suspension period The interconnection process created in FERC Order 2003 is broken Lengthy process (Years) “Real” projects are unable to interconnect to grid State RPS Policies now at risk

15 The interconnection bottleneck is a national problem There are over 200 GW of wind interconnection requests mired in queues across the country

16 Wind interconnection queue is stalling wind development in the Midwest Wind now makes up 85 % of roughly 80,000 MW of interconnection requests in Midwest ISO queue Slide title in Arial 24 bold underlined

17 FERC & RTOs are leading efforts to reform the interconnection process FERC –December 2007 Technical Conference –Midwest ISO Proposed Tariff Changes (June 2008) –CAISO Proposed Tariff Changes (July 2008) –Other RTOs to File Proposed Tariff Changes by December 2008 Key Short Term Reforms –Meaningful Financial Milestones –Increased Deposits –Promotion of Conditional Energy Resource Service Finding a path forward on queue reform

18 Greater transmission investment is the long-term challenge Getting more lines built is the common denominator for getting more renewable resources to consumers

19 Transmission fixes have to occur in Midwest to harness wind’s potential According to Midwest ISO, wind farms and lines capable of delivering 16,000 MW of wind energy to consumers in East means 5,000 miles of new 765kV lines at a cost $13 billion

20 Competitive Renewable Energy Zones (CREZ) –Will set course for future transmission growth in Texas –PUCT approved significant transmission expansion ($4.9B for 11.5GW) last week –Largest build out in US history The CREZ process in Texas will deliver long term solutions for wind generation and transmission expansion CREZ process ensures transmission development critical to renewable growth will continue Texas

21 Benefits of transmission build out are clear Transmission costs make up less than 10% of delivered cost of energy Benefits far exceed the costs

22 Who pays? Proving a “direct benefit” of oversized line for your ratepayers is high hurdle Postage stamp or License Plate? Uncertainty over cost allocation is hampering transmission development across the country No one wants to pay for something that benefits many others…. Cost Allocation & Cost Recovery

23 Who Decides? –State jurisdiction –Federal backstop authority Fractured siting processes is stalling transmission development across the country Getting more clean energy on the grid will take more aggressive solutions on siting needed transmission lines No Silver Bullet on Transmission Siting

24 FERC Order 890 Regional Efforts State Efforts Renewed emphasis on regional planning to access renewables Success or failure of efforts will be measured by getting more lines built Greater Focus on Planning

25 QUESTIONS?