Detector R&D for Muon Chamber Anand K. Dubey For VECC group.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Present Status of GEM Detector Development for Position Counter 1.Introduction 2.GEM 3.Readout Board 4.Fabrication Test 5.Large GEM 6.Readout Electronics.
Mariana Petris, CBM Collaboration Meeting, March 9 – 13, 2009, GSI Darmstadt Layout and first test results of new TRD prototypes Mariana Petris, NIPNE.
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
Micro MEsh GASeous Detectors (MicroMegas)
CMS GEM Workshop III, April 20, 2012
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
GEM Development in India, test beam analysis and plan for next test beam Anand Kumar Dubey for VECC group, Kolkata.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
Rate and Gain Measurements of the 1-m long GEM detector Aiwu Zhang EIC tracking R&D weekly meeting.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
Chamber R&D for CBM Muon Tracker Anand Kumar Dubey VECC, Kolkata.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
David Emschermann CBM Collaboration Meeting - GSI – 12/04/2010 TRD geometry in CBMroot and conclusions for detector module design David Emschermann Institut.
HV connection for a Common GEM foil design Aiwu Zhang
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
GEM detector development at VECC Anand Dubey. 2-GEM detector tested with source symmetric mode of biasing scheme, (i.e. same voltage across both the GEMS)
Self triggered readout of GEM in CBM J. Saini VECC, Kolkata.
Test Beam the μ-RWELL Test Beam the μ-RWELL G. Bencivenni (a), R. de Oliveira (b), M. Gatta (a), G. Felici (a), G. Morello (a), M. Poli Lener (a) (a),
Design of a readout system for RPCs Olu Amoda2 The LODEN Group The group is an association of Fermilab scientists who teamed up to build a cosmic ray.
Update on TPC R&D C. Woody BNL DC Upgrades Meeting October 9, 2003.
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
1 NA58 RICH Test Beam T10 sept.2014 Fulvio Tessarotto – Stefano Levorato Partecipants: Alessandria, Aveiro, Budapest, Calcutta, Freiburg, Liberec, Prague,
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
1 FoCal Status of Silicon Pad detector Array: Design and Tests 1.Review of results from last test beam 2.Plan for the test beam for March 2015.
M. Bianco On behalf of the ATLAS Collaboration
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
PNPI, R&D MUCH related activity ● Segmentation ● Simulation of the neutral background influence ● R&D of the detectors for MUCH ● Preparation to the beam.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Florida Institute of Technology, Melbourne, FL
1 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
 The zigzag readout board is divided into eight η-sectors; each sector has a length of ~12 cm and comprises 128 zigzag strips; zigzag strips run in radial.
P. Colas on behalf of LCTPC. Strategy for Micromegas The Micromegas option is studied within the same (EUDET) facility as the other options (see R. Diener’s.
Mariana Petris, The 11th Vienna Conference on Instrumentation, Feb. 19 – 24, 2007 High Counting Rate Transition Radiation Detector Mariana Petris, Mihai.
R & D with GEMs and THGEMs at VECC, Kolkata Anand Kumar Dubey ( for the VECC Group )
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
GEM Integrated PCB readout and cooling
Large THGEM sampling elements for DHCAL status report
Start Detector for pion experiments
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Tests of a MM octant prototype towards a Micromegas TPC Polarimeter
WG1 Task2 New structures, new designs, new geometries
Hans Rudolf Schmidt GSI Darmstadt
GEM-based Digital Hadron Calorimetry for SiD
Pre-installation Tests of the LHCb Muon Chambers
(On Behalf of CMS Muon Group)
Status of MUCH Electronics
A DLC μRWELL with 2-D Readout
Presentation transcript:

Detector R&D for Muon Chamber Anand K. Dubey For VECC group

CBM Muon detector requirements: Main issues:  The first plane(s) has a high density of tracks -- detector should be able to cope up with high rate. ~ 10 MHz/cm 2  good position resolution  Should be radiation resistant  Large area detector – modular arrangement  suitable options: micropattern gas detectors such as GEMs, Micromegas, and THGEMs.

MUCH R&D so far: we have assembled and tested double and triple GEM prototypes based on 10 cm x 10 cm GEM foils. Optimize the operating conditions with 10 cm x 10 cm. the detector should have: -- a high charged particle efficiency(>90%) -- a good dynamic range. -- a reasonable cluster size for tracking. -- a good rate handling capability In future we would like to go to 30 cm x 30 and later to foils with larger dimensions.

Schematic of prototype GEM chamber assembly GEMS Drift plane (inner side copper plated) 12 x cm 12 cm x 10 mm Readout PCB CERN made GEM foils obtained from Area: 10cm x 10cm Drift gap: ~7mm Induction gap: 1.5mm Transfer gap: 1mm In the next prototypes we have an O-ring on the perspex frame In order to facilitate quick changing on GEMs if needed.

Testing of GEM At the SIS 18 beam line using proton beams of 2.5 GeV/c Aim being : -- to test the response of the detector to charged particles. -- efficiency, cluster size, gain uniformity, rate capability -- testing with actual electronics for CBM : nXYTER -- testing with the actual DAQ -- Aug08-- first successful test with n-XYTER(with 64 channels bonded ) + GEM was performed. MIP spectra for 2GEMs and 3 GEMs were obtained. -- Aug-Sep 09, In 2009 a fuller version of nXYTER with all the 128 channels bonded was available. this offered a better configuration for efficiency estimation and also for cluster size estimation.

Readout Board for Test beam Aug-Sep 09 Inside view Outside view Two triple GEM chambers were fabricated : det 01 – with two different pad sizes(shown below) det02 -- same size pads but with larger induction gap Inside view

GEM chambers – Beamtest 2009

Aug-Sep09 test (with 2.3 GeV/c protons) Correlation between GEM1 and GEM2 pulse height spectra

ADC distribution of main cell and variation with HV 4 fold increase in ADC for a deltaV(GEM) increase by 50V

Time difference between trigger(aux) and GEM ROC Procedure: Get the GEM pads hit in nsec after last Aux. Offset + drift time Determining the Efficiency Using STS Hits

Eff_66 Efficiency with time HV= 3650HV= 3750 Looks like the detector takes some time to become stable, -- need more online investigations 95 % efficiency has been achieved by 3 GEM chamber used by the CMS upgrade group. The chamber tested in June2010.  next slide

12 Slides from Stefano Colaresi – CMS upgrade, RD51 miniweek, cm x 10 cm GEMs Readout: Strips of 0.8 mm pitch so 95 % efficiency is achievable things can be complicated with pads, -- one such large GEM with pad readout was tested in June analysis is still underway

Cosmic Ray test setup at VECC Setup for detector efficiency: 1. Detector+Ortec preamp+amp 2.Using MANAS coupled to PCI CFD card 3. Using Aux + nXYTER

Pedestal GEM signal connected to Channel 56 of FEE (MANAS) After pedestal subtraction - ADC of Channel 56 No of triggers( from 3 FOLD) = 187 Entries =158 => 85% Results with MANAS 64 channels for 4 MANAS

3GEM Pulse height distribution at different HV with MANAS HV =3550 (Vgem=394 V) HV=3600 HV 3650 HV =3725(Vgem=413) HV 3700 The MIP peak shifts with HV

Top copper Pad area- 67*73 Sq mm For 3mm. For 4mm - 88*97 sq mm  Main Features : Main Features :  Both 3 and 4mm square pad sizes Both 3 and 4mm square pad sizes  Not Staggered (‘09 test beam module) Not Staggered (‘09 test beam module)  Symmetric Square Pads Symmetric Square Pads  Multi Layers ( 4) with GND Planes Multi Layers ( 4) with GND Planes  Signal Tracks are distributed in 3 planes Signal Tracks are distributed in 3 planes Reduce the capacitance Track to Track spacing increases Reduce Cross talk  Blind Vias for gas integrity Blind Vias for gas integrity  Gnd Tracks between Signal Tracks Gnd Tracks between Signal Tracks Bottom copper Connector with resistors Top copper GND Plane Bottom copper GND Plane Connectors for FEBs Inner 1 Inner 2 16 Readout PCBS for Test beam 2010

MuCh Layout

Tracking station plane 2m ROC stack 3mt (approx) Placement of ROC Boards ROC stack 10 March Physics With FAIR: Indian Perspective, Susanta K Pal

-- CMS upgrade, slides from A. Sharma, RD51 miniweek, (1)

22 CMS Prototype GEM - Stack (2) Profile ~ 15 mm

CMS Prototype GEM - Test Box Large Drift Electrode Sample under test Jean-Paul Chatelain (3)

Inner 1Inner-2Bottom Copper Top copper Blind vias from inner layers( blue) Blind vias (red ) to inner layer 2.6 mm square pads  Pads arranged in one block of 32*8=256.  Connected to 300 pin connector.  Tracks - shorter and not closer.  can be easily duplicated for bigger sizes.  40 such FEE Boards for One Slat of 1mt. Length..  Each block read by 1 FEB with 2/4 n-XYTERs ( 128/64 Channels)  FEBs can be mounted horizontal or vertical  Modular Approach MUCH PCB design 10 March Physics With FAIR: Indian Perspective, Susanta K Pal

Gas out Conceptual sketch of Triple GEM chamber module Gas in Segmented LV power line/power plane on Detector PCB  each power line is feeding 5-FEBs  ground plane of LV line is in other layer of PCB HV 1 mt 10cm To be decided LV connector 40 FEBs in one module in 1mt slat with about channels 10 March Physics With FAIR: Indian Perspective, Susanta K Pal

Chamber PCB 4 sq mm pads. 32*32 Array(1024 pads). PCB active area is 135mm *135 mm. Read by 2 chip FEB(256 channels) Basic block=32*8 array. Track lengths are short. Bottom side Inner 2 layer Inner 1 layer Top side GND Plane Sa SAMTEC-300 Pin connectors 2chipFEBs

Chamber PCB with 4 FEBs Top view with 4 sq mm padsBottom view –Connectors for FEBs FEB 1FEB 4 FEB 2FEB 3 Bottom view of FEB

2 CHIP FEB –PCB Top Copper Bottom copper N-XYTER 8 layer PCB. Size =111mm*31mm No scooping for N XYTER on the PCB. Regulators - on top copper. Filter capacitors- on bottom copper ADC ROC Connector 300 Pin SAMTEC Connector

 Double and Triple GEMs have been assembled at VECC. Tests performed with radioactive sources as well with proton beams at GSI.  Test with proton beams : Double GEM and triple GEMs coupled to the first prototype of n-XYTER readout chip. – preliminary response looked encouraging. -- charged particle detection efficiency needs to be still higher. investigations underway, using tests with cosmic rays.  Next test beam: two chambers of 3x3 sq. mm 4x4 sq. mm chamber would require 8 FEBs.  Several layout s of the actual design of the Muon Chamber under discussion. Actual size of large GEMs for the final chamber under consideration –- keeping informed with the CMS upgrade involving triple GEMs. SUMMARY

Thanks For Your Attention

BACKUPS

Readout plane-bottom Copper 68 Pin connectors for FEB 1nXGen 68 Pin connectors for FEB 1nXGen Resistors for input Protection ERNI Part no No –68Pins

Triple GEM: Test with Fe-55 3GEM : Gain vs. Vgem