Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Chris Dandurand, P.Eng Kiewit Infrastructure Group Large Hydro Perspective on the Permitting Process & Environmental Approvals.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
Conservation Commissions and the Kinder Morgan Proposed Gas Pipeline PRESENTATION TO NORTHEAST MUNICIPAL GAS PIPELINE COALITION SEPTEMBER 22, 2014 MASSACHUSETTS.
1 The National Environmental Policy Act in the Oil & Gas Industry.
The FERC Review Process and Interaction with State Authorities Council of State Governments July 27, 2005 Office of Energy Projects Federal Energy Regulatory.
Conference on Environmental Assessments in Federations A Montana Perspective September 14, 2009 Tom Livers, Deputy Director Montana Department of Environmental.
LNG PAT WOOD III Federal Energy Regulatory Commission December 17, 2003.
Federal Energy Regulatory Commission
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
FERC Office of Energy Projects 1 Federal Energy Regulatory Commission EPAct of 2005 Effect on Review of LNG Facilities & Working with FERC CSO Annual meeting.
Federal Energy Regulatory Commission GITA Seminar on: New Construction Project Lifecycle JW Marriott Houston, TX September 20, 2004 Lonnie Lister, Chief.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
Natural Gas Transmission Networks: So You Want To Build A Pipeline?
Platting Update Orange County BCC January 27, 2015.
© Copyright 2013 by K&L Gates LLP. All rights reserved. U.S. Natural Gas Pipelines: Regulatory and Policy Developments University of Pittsburgh School.
Connecticut Department of Transportation Bureau of Policy & Planning.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
FGDC Standards Process Review Survey Results Summary Julie Binder Maitra FGDC Standards Coordinator April 13, 2010 Coordination.
Douglas A. Sipe Outreach Manager Outreach Manager Division of Gas-Environment and Engineering Federal Energy Regulatory Commission Office of Energy Projects.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Challenges in Transmission. 2 Environmental and Public Affairs Consulting for the Energy Industry Energy Sectors  Oil & Gas  Pipeline  Storage  LNG.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Monterey Peninsula Water Management District 1 Confirm Scope of Work and Description for MPWMD ASR Project Item 13 April 18, 2005 Regular Meeting Staff.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
Douglas A. Sipe Outreach Manager Outreach Manager Division of Gas-Environment and Engineering Federal Energy Regulatory Commission Office of Energy Projects.
FERC Office of Energy Projects 1 Hydroelectric Licensing Regulations Final Rule July 23, 2003 Federal Energy Regulatory Commission Office of Energy Projects.
Phase 3 Environmental Documentation Process SEQUOIA NATIONAL FOREST AND GIANT SEQUOIA NATIONAL MONUMENT.
Considerations In Dealing With NEPA and 3 rd Party Contractors PLA NEPA Conference June 11, 2008.
1.What is the standard relicensing process in the U.S. and what is the ALP (Alternative Licensing Process) ? 2.How did we convince FERC to agree to an.
April 2006 Middle Fork Project Relicensing Process April 25, 2006
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
1 USAEE/IEAA North American Conference Pittsburgh, PA October 28, 2015 Energy Infrastructure Plenary: Natural Gas Pipelines Donald F. Santa President &
FERC Office of Energy Projects 1 Richard Hoffmann, Director Division of Gas – Environment & Engineering Office of Energy Projects Policies Affecting.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
LNG Permitting: You Want it When? Lauren H. O’Donnell Deputy Director, DG2E Office of Energy Projects.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
INTERSTATE PIPELINE FORUM Presented by: Rebecca F. Zachas, Esq.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
“The people’s forests” Public Participation in National Forest Planning Susan Jane Brown, Staff Attorney Western Environmental Law Center The National.
Two Energy Facility Permitting Reforms: New Hampshire’s Site Evaluation Committee, and the Federal FAST-41 Tom Burack, Esq., Sheehan Phinney New England.
Overview What is the CEQA environmental review process?
National Environmental Policy Act (NEPA)
Environmental Assessment PUC Application Process
Nick Bonvoisin Secretary to the Convention on the
NEPA Assignment Program Overview
Presentation transcript:

Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI

FERC Gas Program  Evaluate applications for facilities to import, export transport, store or exchange natural gas in interstate commerce  Authorize the construction and operation of facilities  Approve abandonment of facilities  Conduct environmental reviews of proposals involving construction, modification, or abandonment  Implement Pre-Filing Process  Conduct inspections of LNG facilities and pipeline construction

Phases of Project Review  Project Preparation ─The applicant working on its own  Pre-Filing ─FERC staff working with the applicant and stakeholders before the filing of an application  Application Review ─FERC staff working with the applicant and stakeholders after the filing of an application  Post-Authorization ─FERC staff working with the applicant and stakeholders to ensure compliance with conditions to the FERC approval

The Pre-Filing Process  Voluntary for pipelines, required for LNG facilities  Used for projects requiring an EIS, or an EA where controversy is likely  Normally requires the applicant to hire and fund a contractor to prepare EA/EIS ─Staff selects contractor from list of three provided by the applicant ─Contractor works solely under Staff’s direction

Pre-Filing Requirements  Project sponsor selects site, pipeline routes and begins surveys and studies  Meet with staff regarding proposed project  Submit draft RFP for 3rd-party contract and draft PF request for staff review  File PF request  Complete at least 6 months of PF review

Goals of the Pre-Filing Process  Early identification and resolution of environmental issues  More direct interaction between FERC staff and stakeholders  Interactive, concurrent NEPA/permitting process, no shortcuts  FERC staff are advocates of the Process, not the Project!  Goal of “no surprises” when application is filed

FERC Staff Pre-Filing Activities  Identify affected parties: ─landowners ─agencies ─other stakeholders  Facilitate identification of issues  Identify study needs  Facilitate resolution of issues  Issue scoping notice  Examine alternatives  Arrange and attend site visits and meetings  Initiate preparation of preliminary NEPA document  Review draft resource reports

Public Involvement During Pre-Filing Review The FERC Process  Project Sponsor Sends Landowner Notification Package  Issue Notice of Intent to Prepare the NEPA Document (i.e., scoping)  Hold Scoping Meetings Public Input  Contact the project sponsor w/questions, concerns; contact FERC  Send letters expressing concerns about environmental impact  Attend scoping meetings

The Environmental Report (13 Resource Reports) 1. General Project Description 2. Water Use & Quality 3. Fish, Wildlife & Vegetation 4. Cultural Resources 5. Socioeconomics 6. Geological Resources 7. Soils 8. Land Use, Recreation, & Aesthetics 9. Air & Noise Quality 10. Alternatives 11. Reliability & Safety 12. PCB Contamination (for pipelines only) 13. LNG Engineering & Design Details

Public Involvement During Application Review The FERC Process  Issue Notice of the Application  Issue Notice of Availability of the DEIS  Hold Public Meetings on DEIS  Issue a Commission Order Public Input  File an Intervention; register for e-subscription  File comments on the adequacy of DEIS  Attend public meetings to give comments on DEIS  Interveners can file a request for rehearing of the Commission Order

FERC Office of Energy Projects Timelines: Traditional vs. Pre-Filing Process Develop Study Corridor Develop Study Corridor Approve PF Request (at least 6 mos. before filing) Conduct Scoping Conduct Scoping & Direct Preparation of Resource Reports Issue Draft EIS Issue Draft EIS File At FERC Issue Order Issue Order File At FERC Prepare Resource Reports Prepare Resource Reports Issue Final EIS Issue Final EIS Traditional – Applicant Activities Traditional – FERC Activities Pre-Filing – Applicant Activities Pre-Filing – FERC Activities (months) Review Resource Reports & Analyze Project (length of study period determined by the Applicant) Analyze Project

Successes  The Pre-filing process is the norm  Increased agency acceptance of and participation in the Pre-filing process  Smaller projects are being filed and approved quicker (using both the Pre-filing and Traditional processes  Other agencies are adopting similar review strategies

The Real World of Pre-Filing  The Pre-filing Process is not always being used as intended ─Agency consultations are not occurring during Pre- filing or pre-certificate stages ─Site-specific issues are not being identified and resolved  The number of recommendations in environmental documents is increasing instead of decreasing  Result—delays in the start of construction

Stopping the Pendulum  Make better use of the PF process  Deal openly with landowners  Engage elected officials  In other words—resolve the issues before they become problems

Working Together for Solutions  Industry Efforts ─Commitment to Landowners ─Issues with shared corridors  Re-establish a regular dialogue between FERC staff and the industry  Industry needs to educate consumers on impact of new natural gas supplies on our way of life  FERC staff want to be part of the solution

Contact Information Lauren H. O’Donnell, Director Div. of Gas – Environment & Engineering