— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.

Slides:



Advertisements
Similar presentations
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
20th RD50 Workshop (Bari)1 G. PellegriniInstituto de Microelectrónica de Barcelona G. Pellegrini, C. Fleta, M. Lozano, D. Quirion, Ivan Vila, F. Muñoz.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Choosing the right preamplifier/discriminator comparing advantages and drawbacks : NL-277-L (Nanometrics), ASD-8 (Cern) and MAD4 (INFN Italy) Our favorite:
1 HV Bias Power Patch Panel for Scintillator KLM Gerard Visser Xiaowen Shi overview Schematics layout Parts.
Pot 32x16 channels = 512 Readout a pair of rows on one end and the next pair on the other. Connect the fibers to “SiPM cassettes” in 2 row by 16 channel.
Current ILC work at Fermilab Electrical Engineering Dept.
J.M. Heuser — CBM Silicon Tracker 1 Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 15 October 2008 CBMCBM Review of the first in-beam.
1 J.M. Heuser − Status of the Silicon Tracking System Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 16 October 2008 CBMCBM Status.
Multilayer thin film technology for the STS electronic high density interconnection E. Atkin Moscow Engineering Physics Institute (State University) –
1 The 3-rd Work Meeting of the CBM -MPD STS Consortium “Technical challenges of the CBM and MPD Silicon Tracking Systems 2009” THE CABLES FOR THE CABLES.
1 Physics of Compressed Baryonic Matter 12 th CBM Collaboration Meeting R&D ON MICRO-CABLES FOR BABY SENSOR RADIATION TEST MODULE October , 2008.
January, 2007Vaclav Vrba, Prague FVTX Strip Sensor Design General features:  Strip pitch = 75 µm  # chip channels = 128;  chip width = 128 x 75 µm =
ALBA Synchrotron – 17 June 2010 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona First Measurements on 3D Strips Detectors.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
HV connection for a Common GEM foil design Aiwu Zhang
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
EST-DEM R. De Oliveira 20 Dec., ‘04 Production of Gaseous Detector Elements  History of Gas Detectors in Workshop  Fabrication of GEM Detectors  Fabrication.
Foundry Characteristics
1 J.M. Heuser – CBM Silicon Tracking System Roadmap for the development of STS module demonstrators Concept Common interfaces/dimensions Some technical.
February, 2007Vaclav Vrba, Prague FVTX Strip Sensor Design General features:  Strip pitch = 75 µm  # chip channels = 128;  chip width = 128 x 75 µm.
News on microstrip detector R&D —Quality assurance tests— Anton Lymanets, Johann Heuser 12 th CBM collaboration meeting Dubna, October
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Low Mass Rui de Oliveira (CERN) July
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
1 J.M. Heuser − STS Development Microstrip detector GSI-CIS Johann M. Heuser, GSI Li Long, CIS CBM Collaboration Meeting, GSI, Update on.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
CBM Silicon Tracking System. First results of the detector module pre-prototype test. V.M. Pugatch Kiev Institute for Nuclear Research 11 th CBM Collaboration.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
CBM Collaboration Meeting. GSI, Darmstadt CBM Silicon Tracking System. CBM-01 sensors characterization. V.M. Pugatch Kiev Institute for Nuclear.
N- XYTER Front-End Boards Christian J. Schmidt, GSI Darmstadt 13. CBM Collaboration Meeting, GSI, Darmstadt, March 10 – 13, 2009.
Development of radiation hard Sensors & Cables for the CBM Silicon Tracking System Sudeep Chatterji On behalf of CBM-STS Collaboration GSI Helmholtz Centre.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Report on dummy detector Equipped with Heater & sensors NA62 GigaTracker Working Group Meeting May 24 th 2011.
Integration of the MVD Demonstrator S. Amar-Youcef, A. Büdenbender, M. Deveaux, D. Doering, J. Heuser, I. Fröhlich, J. Michel, C. Müntz, C. Schrader, S.
7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
I.Rashevskaya- SVT Meeting - Frascati SuperB SVT Strip Pairing: impact on the capacitance value Irina Rashevskaya, Luciano Bosisio, Livio.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
The STS-module-assembly:
n-XYTER Hybrid Developments
Progress with System Integration of the CBM Silicon Tracking Detector
The workflow of module assembly for the CBM Silicon Tracking System
T. Bowcock University of Liverpool
July 2, 2007 ID CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.
ob-fpc: Flexible printed circuits for the alice tracker
SuperB SVT Silicon Sensor Requirements
HPL DG d=1.4mm/e= mm.
Design and fabrication of Endcap prototype sensors (petalet)
Development of thin GEM readout structures
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
Flex Status A.Nomerotski, 4 May 2010.
Vereinfachung der CBM TRD Elektronik
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at GSI

Detector CBM01B2 256  256 orthogonal strips; 50.7 µm pitch; AC readout; 285 µm thick Dimensions: 1.56  1.56 cm 2

test global detector characteristics e.g. IV, CV access both detector sides contact a few strips for detailed measurements, including n-XYTER readout do all this as quickly and as simple as possible Let’s make a test board

Read-out CBM01B2 sensor (“small baby”, 50.7 μm pitch) Read-out 32 strips in the middle of sensor on both sides Ultrasonic wedge bonding PCB → sensor Ordinary line density Two test zones 1 cm 2 each for adjustment of bonding head Standard ERNI connector to n-XYTER kit Test board PCB: Standard manufacturing limits in particular the pitch size of the bonding pads: 200 µm line pitch Wire bonding: Max. recommended bond wire 50 µm pitch: ~ 2.5 mm Fan-out bond pattern required. Max. opening angle: ~ 40 deg Advice from: H. Deppe (bonding, PCB) R. Lalik (connection to n-XYTER board)

PCB top side PCB bottom side 100 mm 70 mm 100 mm pad 10 x 10 mm 2 copper with chemical gold opening for detector legs bias pads SMD 1 M , 4 x total

15.6 mm "balcony" 15.6 mm 15.0 mm 1.6 mm 15.6 mm PCB bond wire "balcony" PCB glue 0.3 mm detector 0.6 mm 1.0 mm Opening in PCB for detector mounting Top view Side view

4 bias pads Connector: ERNI model Dual row, male, type B Pins: 68 (unused pins marked red) Height: 8.2 mm Size: ~(6.3×46.3) mm 2 Pin pitch: 1.27 mm (both x and y) Four 1MΩ resistors

PCB to Si sensor bonding Pads layout at PCB: Line width: 100 μm 2 (no pads) Pitch: 200 μm PCB CBM01B2 Max angle: 51° Max bond length: 3.3 mm

Mechanical mounting of the detector "balcony" ~ 1.6 mm ~ 1.5 cm ~ 300 µm "balcony" PCB glue bond wire

PCB Layout Layout made by P. Skott

Metal support structure to support PCB and sensor during bonding

Conclusions & work plan Design finished, Layout finished ILFA, Hannover: ongoing (incl. gold plating, machining of hole) Weeks 8, 9, Al bonding fixture: to be manufactured Setup of testing station in C27 (Power supply, etc.)