Ohio Duke Energy Ohio 2012 Electric Security Plan Duke Energy Ohio June 29, 2012 Jim Ziolkowski, Rates Manager.

Slides:



Advertisements
Similar presentations
Electric and Gas Rate Update – June 14, 2013 Jim Ziolkowski, Rates Manager.
Advertisements

Electric Security Plan Update – June 27, 2014 Jim Ziolkowski, Director, Rates and Regulatory Planning.
Amendment 3/5 Workshop.
Duke Energy Ohio Standby Rates Jim Ziolkowski, P.E., Rates Manager September 13,
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
The Auction & the SSO What It Means for Columbia and Its Customers Ken Stammen April 13, 2010.
© 2010 McNees Wallace & Nurick LLC Columbus Southern’s Electric Rate Increase Proposals Marietta, Ohio June 2,
CLECO TRANSMISSION RATE CASE. AGENDA Welcome and Introduction Purpose of Meeting Transmission System Update Formula Rate Overview Formula Rate Protocols.
1 Managing Revenues in Regulated Industries Rate Design May 2008 Richard Soderman Director-Legislative Policy and Strategy.
Pricing the Components of Electric Service in Illinois Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
COMPETITIVE ELECTRICITY MARKETS March 15, PA Customer Choice Legislation  Distribution service remains regulated by PAPUC.  Transmission service.
TVA Generates Power and sends it down Transmission Lines to Newport Utilities Distribution Substations TVA Newport Utilities Substations Distributes the.
The Community Renewable Energy Amendment Act of 2013.
Incentive Regulation Topics Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
Progressive Energy Solutions, LLC July 28, 2010 NYMEX N. Illinois Hub Electric Prices 12-Month Forward Prices Through July 15, 2010 * NEU Electric and.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
Green Energy Program Redesign Wilson Mallard – Georgia Power Company NARUC Staff Subcommittee on Accounting and Finance Fall Meeting October 13, 2008 Wilson.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Presentation to the: Pennsylvania Public Utility Commission Demand-Side Response Working Group December 8, 2006 Gas Utility Decoupling in New Jersey A.
Great River Energy 2013 Annual True-Up Meeting August 7, 2014.
Great River Energy 2014 Annual True-Up Meeting Todd Butkowski.
Regulatory Update Dennis Derricks May 5, 2010 Regulatory Update Dennis Derricks May 5, 2010.
1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
2014 Attachment O True-Up Customer Meeting August 25, 2015.
BGS-CIEP Rate - Energy Components (Continued)
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Fourth CTC Reset Compliance Filing Fall 2009 Customer Meetings.
Technical Conference on Net Metering Load Research Study November 5, 2014.
VisTaTech Center Schoolcraft College September 14, 2006 Partners in Business Meeting 2007 Attachment O.
Retail Competition: Managing a Difficult Transition David L. O’Connor Commissioner Massachusetts Division of Energy Resources (DOER) Presentation to National.
Why is WPL filing a rate case?  Last Base Case Rates were set January, 2007  Cost of our utility investments must be reflected in prices our customers.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
Ohio’s Percentage Income Payment Plan (PIPP) Dave Rinebolt, Executive Director and Counsel Ohio Partners for Affordable Energy PO Box 1793, Findlay, OH.
1 WPL Regulatory Update Scott R. Smith Director, Regulatory Affairs.
Electric Market Update Presented by: Don Schierenbeck.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Michigan Public Service Commission Renewable Energy Overview 2011 GLREA Energy Fair Jesse Harlow Engineer, Renewable Energy Section Michigan Public Service.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
NARUC SUMMER COMMITTEE MEETINGS Committee on Water Agenda California Regulatory Initiatives Case History – California American Water B. Kent Turner – President.
Rates Update – September 18, 2015 Jim Ziolkowski, Director, Rates and Regulatory Planning.
OPSI Annual Meeting October 13, Session 6 Reliability Pricing Model: Are Further Changes Necessary? Reluctantly…yes But States should also be.
2015 Fall PR-MR & Marketing Meeting October 16, 2015 Fairo Mitchell Energy Policy Director, Public Utility Division Oklahoma Corporation Commission.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Solving the Energy Puzzle Understanding the Rules of Energy Delivery Electricity Natural Gas Tariffs Solar Combined Heat and Power Generation Distribution.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
2013 Attachment O True-Up Customer Meeting August 13, 2014.
Village of La Grange Municipal Aggregation Hearing January 28, 2013 and February 11, 2013 What is Electricity Aggregation?
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
1 Market Operations Presentation Board of Director’s Meeting February 16, 2005.
2013 Annual True-Up Meeting
Smart Grid Tariff Changes
2016 Annual Attachment O Stakeholder Meeting Ameren Missouri
SMECO Demand Response filing
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Narragansett Electric Rate Classes
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Westar Formula Rate and your bill
2014 Annual Attachment O Stakeholder Meeting Ameren Missouri
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Case No UT PNM Workshop Comments
PA Supplier Workshop January 16, 2019.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
PA Supplier Workshop Net Metering September 10, 2019.
Presentation transcript:

Ohio Duke Energy Ohio 2012 Electric Security Plan Duke Energy Ohio June 29, 2012 Jim Ziolkowski, Rates Manager

Ohio 2 Agenda  Duke Energy Ohio Electric Security Plan Standard Service Offer (ESP-SSO) and Distribution Rates Overview of ESP Auction Generation Riders Other Items  Transmission (Not Part of ESP) Move to PJM New Riders  Price To Compare

Ohio 3 ELECTRIC SECURITY PLAN OVERVIEW  Duke Energy Ohio filed a 9-year 5-month Electric Security Plan (ESP) in June The previous ESP terminated after December 31,  Settlement was reached in October 2011 with intervening parties.  Hearing held during November  ESP was approved by the PUCO in November  ESP effective January 1, 2012, through May 31, 2015.

Ohio 4 ELECTRIC SECURITY PLAN OVERVIEW  Major rate provisions of the new ESP include: Retail generation Standard Service Offer load to be procured through an auction. The cost of this auction-procured load will be recovered through Riders RC and RE. True-ups addressed through Rider SCR. DE OH will move its legacy generation plants to a non-regulated affiliate by 12/31/14. DE OH will collect $110 million per year for three years through a new non-bypassable charge (Rider ESSC). All previous generation-related charges terminated after December 31, 2011 (base generation, FPP, AAC, SRT, CD, shopping credit).

Ohio AUCTION SCHEDULE 5

Ohio Details of Auction  First auction held on December 14, Three products:  January 2012 – May 2013  January 2012 – May 2014  January 2012 – May 2015  Descending-price clock auction  Charles River Associates was the auction manager. Boston Pacific monitored for the PUCO.  Auction was for capacity and energy.  Blended auction price was $52.68 per MWh for the January 2012 through May 2013 delivery period. 6

Ohio Auction Schedule 7

Ohio 2012 ELECTRIC SECURITY PLAN RATE STRUCTURE AND IMPACTS 8

Ohio 9 GENERATION RATES  The Price To Compare (bypassable) components of the ESP- SSO are: Rider RC (Retail Capacity) Rider RE (Retail Energy) Rider SCR (Supplier Cost Reconciliation) Rider AERR (Alternative Energy Recovery) Rider RECON (Reconciliation Rider) Rider RTO (Regional Transmission Organization)  Other Generation-related riders that are non-bypassable: Rider ESSC (Electric Security Stabilization Charge) Rider LFA (Load Factor Adjustment) Rider UE-GEN* (Uncollectible Expense – Generation) * Bypassable if CRES opts out of PAR

Ohio PTC – AAC Environmental Homeland Security Taxes PTC – AAC Environmental Homeland Security Taxes PTC-FPP Fuel, Purchased Power, Allowances RECs PTC-FPP Fuel, Purchased Power, Allowances RECs Rider TCR MISO Transmission Rider TCR MISO Transmission SRA-SRT System Reliability SRA-SRT System Reliability SRA-CD (Rider SC) Capacity Dedication SRA-CD (Rider SC) Capacity Dedication Distribution rates and riders PTC - BG Base generation PTC - BG Base generation Legend Fully Avoidable Unavoidable Rider RTO Various RTO costs Rider RTO Various RTO costs BTR Base transmission incl. NITS BTR Base transmission incl. NITS Distribution rates and riders SCR Supplier Cost Reconciliation SCR Supplier Cost Reconciliation AERR Alternative Energy Recovery AERR Alternative Energy Recovery RECON Reconciles ESP riders RECON Reconciles ESP riders UE-GEN Generation Uncollectibles UE-GEN Generation Uncollectibles Avoidable with waiver RC and RE Retail Capacity and Energy Derived from auction RC and RE Retail Capacity and Energy Derived from auction RECs 10 Old ESP to 2012 ESP Rate Changes – Non-Residential ESSC Electric Security Stabilization ESSC Electric Security Stabilization LFA Load Factor Adjustment LFA Load Factor Adjustment

Ohio PTC – AAC Environmental Homeland Security Taxes PTC – AAC Environmental Homeland Security Taxes PTC-FPP Fuel, Purchased Power, Allowances RECs PTC-FPP Fuel, Purchased Power, Allowances RECs Rider TCR MISO Transmission Rider TCR MISO Transmission SRA-SRT * System Reliability SRA-SRT * System Reliability SRA-CD Capacity Dedication SRA-CD Capacity Dedication Distribution rates and riders PTC - BG Base generation PTC - BG Base generation Legend Fully Avoidable Unavoidable Rider RTO Various RTO costs Rider RTO Various RTO costs BTR Base transmission incl. NITS BTR Base transmission incl. NITS Distribution rates and riders SCR Supplier Cost Reconciliation SCR Supplier Cost Reconciliation AERR Alternative Energy Recovery AERR Alternative Energy Recovery RECON Reconciles ESP riders RECON Reconciles ESP riders UE-GEN Generation Uncollectibles UE-GEN Generation Uncollectibles Avoidable with waiver RC and RE Retail Capacity and Energy Derived from auction RC and RE Retail Capacity and Energy Derived from auction RECs 11 Old ESP to 2012 ESP Rate Changes – Residential ESSC Electric Security Stabilization ESSC Electric Security Stabilization LFA Load Factor Adjustment LFA Load Factor Adjustment * Conditionally avoidable only for aggregation customers

Ohio 12 RIDER RC (RETAIL CAPACITY)  Based on PJM RPM market capacity price for the delivery period.  Converted into retail rates.  Rider RC will be adjusted before each of the three delivery periods in the ESP.  Rider RC is fully avoidable by shoppers.

Ohio 13 RIDER RE (RETAIL ENERGY)  At the wholesale level, calculated by subtracting the capacity price for the delivery period from the blended auction price.  Converted into retail rates by adjusting for losses, taxes, and seasonality / blocks (for some rates).  Rider RE will be adjusted before each of the three delivery periods in the ESP.  Rider RE is fully avoidable by shoppers.

Ohio 14 RIDER ESSC (ELECTRIC SECURITY STABILIZATION CHARGE)  Collects $110 million per year for three years.  Expires after 12/31/14.  Will be trued up each year.  Rider ESSC is non-bypassable.

Ohio 15 RIDER SCR (SUPPLIER COST RECONCILIATION)  Reconciles the Rider RE and Rider RC revenues received from retail customers with the payments owed to auction providers.  Recovers costs associated with auctions (e.g., consultants, setting up CBP website, etc.)  Will be adjusted quarterly.  Normally bypassable for shopping customers, but Rider SCR contains a non-bypassable provision.

Ohio 16 RIDER SCR (SUPPLIER COST RECONCILIATION) – “Circuit Breaker”  Subject to Commission approval, Rider SCR becomes applicable to all retail jurisdictional customers in the Company’s electric service territory including those customers taking generation service from a CRES provider under the following circumstance: The revenue balance within the SCR account becomes equal to or greater than ten percent of the Company’s total actual SSO revenues collected for the most recent twelve month period under Riders RE, RC, RECON, RTO, and AER-R. The total actual SSO revenue will be determined from data covering the most recent quarter for which it is available. Duke Energy Ohio shall apply to the Commission for confirmation that the Company should modify the Rider such that it becomes non-bypassable regardless as to whether or not the balance in the Rider results from over- or under-recovery.  For customers of CRES providers, Rider SCR will become bypassable again when, at the time of the quarterly filing, the Rider balance of over- or under- recovery falls below the ten percent threshold.

Ohio 17 RIDER AERR (ALTERNATIVE ENERGY RECOVERY RIDER)  Recovers the cost of RECs associated with Standard Service Offer (i.e., non-switched) load.  Will be adjusted quarterly.  Rider AERR is fully avoidable by shoppers.

Ohio 18 RIDER RECON (RECONCILIATION RIDER)  Rider RECON recovers costs necessary to true up revenue collected under Rider PTC-FPP and Rider SRA- SRT with actual costs associated with each of these two riders through December 31,  Rider RECON will terminate when the net over- and/or under-recovery balances for Rider PTC-FPP and Rider SRA-SRT are eliminated but no later than two quarters after the filing of a final entry in the docket initiated by the Commission for purposes of conducting a final audit of Rider PTC-FPP and Rider SRA-SRT.  Rider RECON is fully avoidable by shoppers.

Ohio 19 RIDER UE-GEN (UNCOLLECTIBLE EXPENSE - GENERATION)  Recovers uncollectible accounts expense related to generation service including Percentage of Income Payment (PIPP) customer installments not collected through the Universal Service Fund Rider.  Non-bypassable except it is bypassable for accounts that are not designated for Duke Energy Ohio’s Purchase of Accounts Receivables program.  Will be adjusted annually.

Ohio 20 RIDER LFA (LOAD FACTOR ADJUSTMENT RIDER)  Revenue neutral to Duke Energy Ohio.  Will be adjusted quarterly.  Rider LFA is non-bypassable.  Rider LFA applies to customers taking service under Rates DS, DP, and TS.  Demand charge and kWh credit.

Ohio 21 OTHER ITEMS  Minimum stay rules eliminated for all customer classes.  DE OH received approval to sell its generation plants to a non-regulated affiliate.  Duke Energy Ohio will purchase accounts receivables from CRES providers at zero discount  Rider LM has been re-opened to both shoppers and non-shoppers  Funding provided to various community agencies serving low income customers.  Filed an application in December for a new Distribution Decoupling Rider. Will not apply to DS, DP, and TS.

Ohio 22 TYPICAL BILL IMPACTS – RATE DS

Ohio 23 TYPICAL BILL IMPACTS – RATE DP

Ohio 24 TYPICAL BILL IMPACTS – RATE TS

Ohio Alternative Energy, Energy Efficiency, Peak Demand Reduction  ESP will not impact commitment to meeting alternative energy, energy efficiency, or peak demand reduction requirements.  Duke Energy Ohio currently acquires RECs to meet alternative energy requirements.  Duke Energy Ohio will continue to purchase RECs and also enter contracts to comply with alternative energy requirements.  Duke Energy Ohio will continue energy efficiency and peak demand reduction programs. 25

Ohio 26 ESP TERMINATION  The Electric Security Plan will be effective through May 31,  The Company is required to make its next ESP filing by June 1, 2014.

Ohio TRANSMISSION RIDERS 27

Ohio RTO Membership  Duke Energy Ohio received FERC approval to realign RTO membership with PJM.  Realignment effective January 1,  Auction timeline designed to coordinate with PJM planning year. 28

Ohio 29 Rider BTR and Rider RTO  Rider TCR (Transmission Cost Recovery) terminated after December 31, Rider TCR was bypassable for shoppers.  New transmission riders effective January 1, 2012: Rider BTR (Base Transmission Rider). Non-bypassable, i.e., no longer part of the price to compare. Rider RTO (Regional Transmission Organization Rider). Fully bypassable. Currently zero.

Ohio PTC – AAC Environmental Homeland Security Taxes PTC – AAC Environmental Homeland Security Taxes PTC-FPP Fuel, Purchased Power, Allowances RECs PTC-FPP Fuel, Purchased Power, Allowances RECs Rider TCR MISO Transmission Rider TCR MISO Transmission SRA-SRT System Reliability SRA-SRT System Reliability SRA-CD (Rider SC) Capacity Dedication SRA-CD (Rider SC) Capacity Dedication Distribution rates and riders PTC - BG Base generation PTC - BG Base generation Legend Fully Avoidable Unavoidable Rider RTO Various RTO costs Rider RTO Various RTO costs BTR Base transmission incl. NITS BTR Base transmission incl. NITS Distribution rates and riders SCR Supplier Cost Reconciliation SCR Supplier Cost Reconciliation AERR Alternative Energy Recovery AERR Alternative Energy Recovery RECON Reconciles ESP riders RECON Reconciles ESP riders UE-GEN Generation Uncollectibles UE-GEN Generation Uncollectibles Avoidable with waiver RC and RE Retail Capacity and Energy Derived from auction RC and RE Retail Capacity and Energy Derived from auction RECs 30 Old ESP to 2012 ESP Rate Changes – Non-Residential ESSC Electric Security Stabilization ESSC Electric Security Stabilization LFA Load Factor Adjustment LFA Load Factor Adjustment

Ohio PRICE TO COMPARE

Ohio 32 How Do I Calculate My Price to Compare? Compare: DE OH’s Rider RC Charge + Rider RE Charge + Rider SCR Charge + Rider AERR Charge + Rider RECON Charge + Rider RTO Charge vs. The CRES Provider’s price for electricity Note: Price To Compare varies based on load factor

Ohio 33 Load Factor Load Factor: kWh used during the month divided by hours in the month x monthly demand Impact: > The higher the load factor, the lower the rate per kWh > The lower the load factor, the higher the rate per kWh

Ohio 34 Price To Compare Calculation

Ohio 35 Price To Compare Calculation

Ohio 36 Recommendations Use twelve months of demand and energy to develop an “average annual price to compare” for the best price comparison Compare competing offers using the same usage data

Ohio 37 Annual Price To Compare (Example)

Ohio 38 Duke Energy Ohio Tariffs  DE OH’s tariffs can be found online at:

Ohio 39 DE OH Standard Service Offer Questions?