Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.

Slides:



Advertisements
Similar presentations
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Advertisements

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
First Article Inspection Report
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Configuration management. Reasons for software configuration management  it facilitates the ability to communicate  status of documents, coding, changes.
Schedule. Team Notebook Grading Contents: meeting logs (date, time, duration, who is present, topics discussed, action items) graded assignments expenses.
1 1 Presented : Pre-Bid Conference March 25, 2015 IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS.
BIDDERS’ CONFERENCE IT-3980 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Up to 10 Tons Capacity 20 March.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1 Welcome to EQ2430/EQ2435/EQ2440 Project in Wireless Communication Lecture 1 March 20, 2015 Per Zetterberg School of Electrical Engineering.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD SFP Page 1 Design,
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
CHAPTER 4 Engineering Communication
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Monitoring & Oversight Adult Education and Literacy (AEL) Programs Brenda B. Williams Project Manager Texas Workforce Commission Regulatory Integrity Division.
Project Management Requirements
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
All rights reserved © AEM - ALMA EUROPEAN CONSORTIUM All rights reserved Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
GEEN 2850 / REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: _01 FOR DESIGN CONCEPT OF THE CU Balloon Experimental Satellite (CUBESAT)
Final Year Project 1 (FYP 1)
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Project management and communication structure Nataša Urbančíková Faculty of Economics Technical University of Košice.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
How the NCSX Project Does Business
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
MODULE 6 Use of Web-based Programmatic Information 1 CAPTE: On-site Reviewer Training This module will cover the special issues related to handling electronic.
CORP3341 Clarification Meeting Technical Evaluation of Metering Substation panels and modules Enquiry Date: 27 November 2015 Presenter: Henri Groenewald.
Action Items List at PM#7
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
OFFRE XXXX Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas WIND ANALYSIS PM#07.
Introduction to New Product Development (Portfolio)
Transmitted by the IWVTA Informal Group
Product Engineering Scenario Overview
5QC Update IPSG Meeting Lisbon, 15 November 2007
Presentation transcript:

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 1 Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas Action Items List at PM#5

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 2 ACTIONSDATE OriginN°StatusDescriptionResponsibleDue/done Kick Off meeting1ClosedTo provide the CV of the persons named in all the charts.AEM AAS-FProject Plan Kick Off meeting2ClosedConfirm the version of AUTOCAD that shall be used for drawings delivery. AEM mentioned that version 10 is an old one. ESOTM ESO AEM 01 Kick Off meeting3ClosedPrecise PDM systems and dedicated tools.AEM AAS-FPM No.1 Kick Off meeting4ClosedList of long lead items.AEMPM No. 1 Kick Off meeting5Closed, covered by N#29 List of information needed for the sand blasting and weather characterisation for panel qualification. AEM AAS-IPM No.2 & 3 Kick Off meeting6Closed, covered by N#29 Description of test to be done on the panel (damaged panel of the prototype). Test concerning the “aging”. AEM AAS-IPM No. 2 & 3 Kick Off meeting 7ClosedPreliminary specifications to ESO for the site working area.AEM MT-A

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 3 Kick Off meeting 8ClosedPresentation of the status of the air flow direction change (top bottom) possibility. AEM EIECancelled (ESO Phone Week 04) Kick Off meeting 9 Open Investigate electric brakes instead of hydraulic. AEM EIE Design phase AEM TM to follow Kick Off meeting 10ClosedAEM to propose a campaign of test the Consortium wants to do for the metrology testing (and/or other issues) on the site of Socorro and their durations. AEM EIE + AAS-IPM No. 1 Kick Off meeting 11ClosedList of items or subassembly to be qualifiedAEMTM008 + PM3 clarifications Kick Off meeting 12ClosedAnswer to AEM proposal for the date of the next progress meetingESOWeek 4 Kick Off meeting 13 Open Clarify inconsistencies of acronyms according to the statement of work. AEM AAS-F Will be covered by the Configuration Control Plan Kick Off meeting 14ClosedProvide a list of items for which the manufacturing has to start before PPDR AEMPM04

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 4 Kick Off meeting 15ClosedComments to the preliminary schedule provided today (specifically design phase) ESO Kick Off meeting 16ClosedESO to clarify the status of FEM sent at T0ESOESO AEM TM 01 PM 01 17ClosedAEM to prepare the list of the documents which have to be ready at the end of the First phase of the Project (ending mid March) AEMList presented during PM3 PM 01 18ClosedESO to transmit the expected bearing capacity of the soil at the Work Area ESOESO–AEM TM-08 PM 01 19ClosedAEM to clarify their real needs on the bearing capacity at the work Area AEM ANTD B-DSN ( ) PM 01 20ClosedAEM to transmit the update of the Work Area SpecificationAEM ANTD B-DSN ( ) PM 01 21ClosedESO to transmit to AEM the relevant information in order to follow on the issue on the discrepancy noted by the JATG campaign. ESOESO AEM TM 022 ( )

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 5 PM 01 22ClosedAEM will issue a TM on technical clarification desired on RAM specification AEMAEM-ESO-TM-01 PM 01 23ClosedESO to communicate to AEM the decision about the presence on ATF site for the week 6 ESOTelephone call & presence of ESO PM 02 24ClosedESO to trace the DWG of the ICD Front End and transmit in electronic format ESO SST PM 02 25Open ESO to comment on the proposed labelling system used for documents ESO At Configuration Control Meeting PM 02 26ClosedESO to comment on the numbering of the partsESOTM018 PM 02 27ClosedAEM to verify the status of the qualification of “Click bonds” with respect to 30 years lifetime AEMPart of the Qualification plan PM 02 28ClosedAEM to transmit to ESO the minimum working distance between the two rows of antenna stations at the proposed Work Area AEM to transmit to ESO the type and characteristics of the assembly crane planned to be used at the work area AEMTM004

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 6 PM 02 29OpenAEM to prepare a TM summarizing their proposal of the delta qualification for the panels AEM PM 03 30ClosedAEM to transmit a TM with specific question about cablingAEMAEM TM 09 => ESO TM21 PM 03 31ClosedESO to check the measurement of scattering can be done on panel issue, in ESO facilities. ESOESO TM 20 PM04 ( from OSF meetings ) 32OpenBearing capacityESO PM04 ( from OSF meetings ) 33OpenFork lift operationMT-A PM04 ( from OSF meetings ) 34OpenCross section MT-A PM04 ( from OSF meetings ) 35OpenFoundation designESO PM04 ( from OSF meetings ) 36OpenDelivery point locationMT-A

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 7 PM04 ( from OSF meetings ) 37OpenVaults definitionMT-A PM04 ( from OSF meetings ) 38OpenWater usageMT-A PM04 ( from OSF meetings ) 39OpenCommunication ratesESOASAP PM04 ( from OSF meetings ) 40OpenTelephone extensionsMT-A PM04 ( from OSF meetings ) 41OpenPersonnel numbers, grades and profilesMT-A PM04 ( from OSF meetings ) 42ClosedDate of work area updateMT-A at OSF meeting PM04 ( from OSF meetings ) 43OpenInsurance detailsMT-A