Madrid Forum, 17 October 2007 Gas Regional Initiative Coherence and Convergence.

Slides:



Advertisements
Similar presentations
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Advertisements

1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
XVII Madrid Forum January 2010 ERGEG Gas Regional Initiatives P rogress and future work Peter Plug NMa, Director.
Vienna, 8 April th IG Meeting Meeting Guide.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
GRI NW Stakeholder Group Meeting – 25 November 2011 GRI NW Stakeholder Group Meeting 25 November 2011 Kristóf Kovács The 2014 target and the role of the.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Investment workstream 20 October 2008 Investment project (I1)‏ Update on Consultation Presentation at account and by project manager.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
6th RCC Meeting – Region South-South East 30th March 2007, Milano.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
22 February 2007 ERGEG approach to the internal energy market Nick Thompson – Ofgem IFIEC Europe Energy Forum, 22 February 2007.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
Gas Regional Initiatives (GRI) – Progress Report Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
Click to edit Master title style 1 5 th GRI Coordination meeting Brussels, 25 th October 2011.
XV Madrid Forum, 6-7 November 2008 Gas Regional Initiative Progress and challenges.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
DEVELOPMENT OF GAS HUBS South Gas Regional Initiative Madrid, 29th October 2007.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Gas Regional Initiative – North West Region Governmental Meeting 6 May 2010 – The Hague Secondary capacity markets Project update Betsy ANNEN – CRE Bernhard.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2008, Bucharest.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
6th Stakeholder Group meeting Stockholm – 26 November 2009 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer,
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Gas Regional Initiative South South-East
Gas Regional Initiative South South-East
Gas Regional Initiative South South-East
Presentation transcript:

Madrid Forum, 17 October 2007 Gas Regional Initiative Coherence and Convergence

2 XIIIth Madrid Forum, 17 October 2007 Outline of presentation  Background/Overview  Process  Coherence and convergence - introduction & key messages  Interconnection and capacity  Transparency  Interoperability (including gas balancing)  Development of gas hubs  Other issues to be considered  Ensuring coherence and convergence  Practical success/ Problems encountered  Next steps

3 XIIIth Madrid Forum, 17 October 2007 Overview 1 Gas Regional Initiative (GRI) 3 Regional Energy Markets (REM) ≈ 12% of total natural gas consumption ≈ 30% ≈ 58%  North-West (NW)  South (S)  South-South East (SSE) Figures represent an approximation, France member in two regions

4 XIIIth Madrid Forum, 17 October 2007 Background  GRI is about facilitating practical improvements in gas markets to improve market effectiveness and integration  Identifying issues – that cause barriers to market integration  Proposing solutions – that will lead to real and practical improvements (e.g. transparency)  Implementing plans – ensuring effective delivery of plans  Ensure that approaches and solutions adopted across the three regions do not create barriers for market integration and single market

5 XIIIth Madrid Forum, 17 October 2007 Process on track  3 gas regional markets (‘regions’) established and all working effectively to facilitate change  Priorities identified in all 3 regions, plans developed and solutions being brought forward  European Commission actively involved and support  Stakeholders involved – operators are supporting the process; but: more engagement needed to make process work and to deliver improvements  ERGEG commitment to transparency – e.g. ERGEG website – development of “one-stop shop”: Single source containing all relevant information on the GRIwww.ergeg.org

6 XIIIth Madrid Forum, 17 October 2007 Coherence and convergence – Introduction  The gas coherence and convergence report follows on from electricity version BUT  Issue of coherence and convergence not as pronounced as could be in electricity:  Few regions in gas – few borders in more than one region  Two relatively large regions accounting for majority of EU gas consumption  Level of integration of markets in gas –in general– less advanced than electricity (e.g. regional power exchanges)  Detailed legal basis for congestion management in electricity  Higher level of network interconnection in electricity Coherence and convergence within rather than across regions is an important first step in gas

7 XIIIth Madrid Forum, 17 October 2007 Coherence and convergence – key messages  All regions have identified and pursue similar priority topics - reflecting EU wide problems:  Interconnection and capacity  Transparency  Interoperability (including gas balancing)  Development of gas hubs  Differences are generally due to local market conditions  Treatment of priority topics broadly similar and in principle allow further integration at later stage  As more solutions developed it will be key to ensure that they are coherent enough to allow regions to come together as single market

8 XIIIth Madrid Forum, 17 October 2007 Interconnection & capacity  All regions identified need to enhance efficient use of existing capacity and facilitate development of new infrastructure:  Day ahead auctions and trading (N-W)  Improving congestion management & capacity allocation (N-W)  Development of standard bulletin board for trading (S-SE)  Development one-stop shop for capacity bookings (S-SE)  Coordinated plan for new investment (S)  Developing coordinated capacity allocation mechanisms (S)  TSOs to develop an overview of current and future investment plans (S and S-SE)  In (S) main focus on facilitating new infrastructure in (S-SE) and (N-W) mainly about more efficient use existing capacity  Differences reflect local market conditions – do not appear to create barriers to further market integration and single market

9 XIIIth Madrid Forum, 17 October 2007 Transparency  All three regions identified improved transparency as key factor to facilitate market integration  Convergence of information for TSO/LSO/SSO (S)  Regular update on delivery of investment projects (S)  Bulletin board (S-SE)  Improving information from TSOs and SSOs (N-W)  Developing guidelines for less than 3 rule (N-W)  (N-W) and (S) have consulted market on their requirements and are looking at ways to meet them – should similar approach be taken in S-SE once bulletin board implemented?  Should the less than 3 guidelines be rolled out across all 3 regions once finalised?  Existing transparency requirements in Gas Regulation must be properly implemented across the EU  ERGEG guidelines (e.g. LNG, balancing, storage) include transparency provisions – implementation will help integration

10 XIIIth Madrid Forum, 17 October 2007 Interoperability (including gas balancing)  All 3 regions are looking at issues relating to interoperability  Regional entry-exit tariff system and balancing (S-SE)  Development of IPAs and OBAs (S-SE)  Report on interaction between neighbouring gas balancing mechanisms (N-W)  Improving balancing transparency (N-NW)  Development of coordinated and harmonised operational procedures (S)  Each region needs to focus on interoperability within region as a priority  Other initiatives on interoperability exist (Commission mandate to CEN, EASEE-gas work, individual regulator work on gas quality)  There is a question of how a regional entry-exit tariff system will operate next to the other regions (particularly N-W) and whether any difficulties for convergence are created

11 XIIIth Madrid Forum, 17 October 2007 Development of gas hubs – gas trading  Significant current differences across 3 regions in the development of hubs – but a key priority for all  Initial work on liquidity at all hubs – now focusing on GTF initially to improve liquidity (N-W)  Developing MIBGAS into the regional initiative as a starting point for development of a gas hub (S)  Development of existing hubs as regional balancing points (S-SE)  Work differs in its focus across the 3 regions – but generally reflects differences in market development, e.g. need action for a new hub in (S)  Solutions for each hub may differ depending on respective issues they face  Question of whether there is a need to look at development of regional hubs as in (S-SE) although need to think about impact on balancing markets

12 XIIIth Madrid Forum, 17 October 2007 Other issues to be considered  Regulatory gaps for cross-border cooperation between regulators is potential key barrier to market integration  Commission’s 3 rd package aims to fill the gaps  However: More buy-in from member states/governments needed  The (N-W) region has developed a MoU for regulators to facilitate better cooperation, e.g. on consultation, sharing information, market development and design – a way of filling the gap for now. MoU will be signed on 25 October – plans for effective implementation being taken forward  The (S) region has signed an agreement between the Spanish and Portuguese Government that facilitates and speeds up the procedure  MoU as role model for other regions until the 3rd package takes effect

13 XIIIth Madrid Forum, 17 October 2007 Ensuring coherence and convergence  This issue is not as pronounced as it could be in electricity  However: Important to monitor developments as more solutions to region specific issues are brought forward  ERGEG will provide an update on the issue in its annual report and will report again to Madrid Forum  Implementation of ERGEG guidelines on balancing, storage, LNG and open season will help improve consistency and market integration  Regulatory gaps and legal issues could hinder integration  Differences in competencies of regulators (MoU in N-W region developed to help fill gap)  Lack of flexibility in national legislation (e.g. auction in N-W region)  Impact of changing market design – national vs EU impact

14 XIIIth Madrid Forum, 17 October 2007 Practical Success – NW region (1) 1. More transparency Enlargement of available information on storage levels in NW Europe. Data from numerous questionnaire was discussed among stakeholders and lead to better understanding of the problems faced at e.g. stream of primary markets (capacity congestion management). New publications at Taisnières (Fluxys: capacity) and Obergailbach (GDFDT: flows) 2.More (access to) capacity on the way Co-ordinated open seasons between Fluxys and GRTgaz at Taisnières Launch of secondary Day Ahead Pilot planned by APX and/or TRAC-X at Oude Statenzijl/Bunde and Ellund in q108. More news expected at SG on Sub-achievements Day Ahead Pilot:  Implementation leadtime for capacity transfer at Oude Statenzijl and Ellund shortened from 10 day to 3 hours by TSO’s involved in the pilot.  Questionnaire and subsequent analysis on wishes for day ahead pilot for NW-region published. -Pilot can serve as evaluation example for EU-27 for question like Do we need centralised x-border pltaforms for getting liquidity in 2ndary capacity trading and this way addressing contractual congestion of capacity.  Pending challenges identified (also success): clarification of the legal framework and identification of perceived legal bottlenecks, contract development for trading by platforms and EFET, non-discriminatory interfaces between TSO’s and platform operators. Implementation of a service of “conditional transit” at Taisnières to improve the use of Fluxys’grid

15 XIIIth Madrid Forum, 17 October 2007 Practical Success – NW region (2) 3.More x-border regulatory co-ordination: MoU between Regulators of the NW region to be signed on Regulators have now more then just contact list to call each other. So we await good things for Sound dialogue between regional players established. More progress to be reported on SG Transparency in capacity of flows Balancing: analysis of ‘gaps’ when flowing x-border gas Hubs: work on GTF and extension to more hubs Investments (lead with TSO’s): decision on a website with overview of open seasons in NW region

16 XIIIth Madrid Forum, 17 October 2007 Practical Success – South region  A coordinated open season procedure is being analysed by the French and Spanish TSOs under the supervision of NRAs  Common new infrastructure plan to develop further capacity in the French-Spanish interconnections  TSOs committed to publish periodically update the status of development of the French-Spanish interconnections  Agreement between the governments of Portugal and Spain on the development of MIBGAS  TSOs, LSOs and SSOs committed to improve transparency according to the consultation analysis made by regulators

17 XIIIth Madrid Forum, 17 October 2007 Practical Success – SSE region  TSOs and SSOs agreed to make capacity expansion plans / future investment transparent and to establish a regional Investment Plan  CEGH and EFET agreed on a plan by stages to develop the Hub in Baumgarten as a regional balancing point  TSOs committed to implement a standardized bulletin board for secondary market trading  TSOs committed to offer a one-stop shop service for capacity bookings if requested by shippers

18 XIIIth Madrid Forum, 17 October 2007 Problems encountered – process  NW: More creative solutions from shippers is needed to take work further. Your commitment today helps.  S: General agreement by TSOs to a common interconnection investment agenda – but still progress is slow (different decision procedure to approve investments, different capacity allocation mechanisms in the different countries…)  SSE: Commitment is needed for implementation of IPAs and OBAs, defaulting TSOs are requested to finalize their agreements soon (eg. Baumgarten,...)

19 XIIIth Madrid Forum, 17 October 2007 Problems encountered – legal  Daily auction of primary and secondary capacity: Primary capacity: Dutch as well as German legislation prescribes fcfs principle Secondary capacity: German regulation prescribes that prices for capacity on the secondary market may not be significantly higher than the tariffs on the primary market  Data exchange: Exchange of confidential information between NRA’s is in most cases impeded by law. In the work of the regional initiative this proves to be a real bottleneck as it is difficult to analyse for example interconnection points. These impediments have been reported to the appropriate ministries.  TSO cooperation: Missing framework for effective TSO x-border cooperation with regard to capacity allocation, congestion management, harmonising and bundling of capacity products and investment

20 XIIIth Madrid Forum, 17 October 2007 Next steps and looking forward  Public consultation on GRI coherence and convergence report until 16 December  ERGEG Regional Initiative Annual Conference and Annual Report – Early March 2008  Key challenge for 2008 is to strengthen active stakeholder (shipper) participation.  As 3 rd package discussion unfolds, we are happy to continue paving the way through regional co-operation.

21 XIIIth Madrid Forum, 17 October 2007 Further information WWW: Contact:Walter Boltz Tel.: Fax: