INDIA AIDC IMPLEMENTATION STATUS AND ISSUES Presented by Airports Authority of India SIP AIDC Seminar 28-31 October 2014.

Slides:



Advertisements
Similar presentations
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
Advertisements

Background Hong Kong, China has put AIDC into operational use between HK and Sanya since Feb Standalone system use real-time data from ATM System.
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
SEPARATE PROCEDURES AND ROUTES FOR GENERAL AVIATION
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
Workshop on preparations for ANConf/12 − ASBU methodology
Pan regional ICD for AIDC structure and status (SP/09)
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Thailand AIDC Implementation Status SIP AIDC Seminar October 2014.
I.R.IRAN AIDC/OLDI Status
APAC SIP on ASBU B0-FICE AIDC Implementation Seminar Basic SYSCO Principles and Standard OLDI Communication EUR Environment ICAO EUR/NAT Office Celso Figueiredo.
AIDC safety benefits & limitations AIDC Implementation Seminar 28 th – 31 st October 2014 Adam Watkin Airservices Australia.
LOA template AIDC Implementation Seminar 28 th – 31 st October 2014 Adam Watkin Airservices Australia.
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
AIDC Top priority in APAC Special Implementation Project AIDC Bangkok, Oct Prepared by F.Lecat 1.
We would be happy to make you and your workplace cheerful and comfortable. Thank You A 360 O solution provider for World Class Modular Office Furniture.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
Characteristics of Communication Systems
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
AMHS WORKSHOP POLICY & DOCUMENTATION. AMHS WORKSHOP POLICY & DOCUMENTATION  Operational Requirements for facilities or services are established through.
Distributed Multi-Nodal ATFM Operational Trial
Station Board EVLA F2F Meeting: December Dave FortEVLA F2F Meeting: 11/12 December Outline Station Board Review Station Board Status Delay.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Transboundary Trust Space February 16, 2012 Ensuring trust in information exchange – proposal and approaches from Russia and CIS-states (RCC states) National.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Report of CAeM-XIV EC-LXII Geneva, Switzerland.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) TT-PWPP National WIGOS Implementation WMO; OBS.
ICARD USER FORUM Recommendations and Conclusions (Paris, 20. – 21. September 2010)
ATS Message Handling System (AMHS)/ System Wide Information Management (SWIM) Workshop and the Seventh Meeting of Aeronautical Telecommunication Network.
Experiences from Technology Needs Assessment and Related Activities by the CTI Elmer Holt, Vice Chair, Climate Technology Initiative Tobago Seminar – 14.
International Civil Aviation Organization Airspace Allocation and Use Mitchell A. Fox Chief Flight Operations Section, ANB 10 April 2012 IAOPA World Assembly.
28-31 October RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS Secretariat - APAC OFFICE 28 October 2014 SIP AIDC Seminar in Bangkok SP/01.
Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.
Dave Passarello DOE Accelerator Safety Workshop August , 2009 Software QA Requirements Breakout Session – Key Points.
Viet Nam AIDC. AIDC Implementation Status HCM - AIDC – available for current ATM System Ver 1 HaNoi – AIDC - available for current ATM System Ver 3 Conduct.
V. VSOMASUNDARAM, Board Member (Air Navigation Services), Airports Authority of India.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for buildings Energy performance of buildings Guidelines.
Service Enhancement AMHS Implementation Workshop Chennai, India 15 th – 17 th December 2008.
Powerpoint Templates Data Communication Muhammad Waseem Iqbal Lecture # 07 Spring-2016.
AIDC Implementation Seminar 28th – 31st October 2014
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
AIDC Implementation Seminar 28th – 31st October 2014
INITIATIVES TAKEN BY AAI UNDER
Introduction to LDC Strategy
amendments to ISO 9001 mean to you?
Thailand AIDC Implementation Status
AIDC Top priority in APAC
Workshop on preparations for ANConf/12 − ASBU methodology
AIDC status October 2014 © Thales Australia Limited. This document and the information it contains is commercial-in-confidence and shall remain the.
RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
IP and AMHS TRIALS- PLANIFICATION STRATEGY
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
AIDC Implementation in Hong Kong, China
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
WIGOS implementation in RA II
Marine Strategy Framework Directive (MSFD)
A model to link them all IFLA-LRM as a driver for harmonization of cataloguing standards related to serials and other continuing resources Gordon Dunsire.
AIDC safety benefits & limitations
Marine Strategy Framework Directive (MSFD)
Free Indian Business Directory, Business Listing Site - Pinmarq List your local business for free on top business listing site in India. Find latest reviews.
AIXM 5.2 – WIP AIXM CCB – Webex 10 OCT 2017.
Presentation transcript:

INDIA AIDC IMPLEMENTATION STATUS AND ISSUES Presented by Airports Authority of India SIP AIDC Seminar October 2014

AIDC in India  India initiated AIDC operational trials after commissioning of automation systems at major ATS units in India.  Successful testing has been carried out between major ATC centres in India and plans are now underway to operationalize AIDC in a phased manner.  Extensive trials have been carried out between dissimilar automations systems available at various ATS units  India has also drawn up plans to establish AIDC with adjacent ATS Units of neighboring states in the sub- region. In some cases, successful trials underway.  Currently using APAC AIDC ICD version 3.0 2

ATM Automation systems in India  Raytheon (AT3) Delhi, Mumbai  Raytheon (AT3+) Chennai  Indra (Aircon2100) at Kolkata and upcoming in Delhi as replacement  Indra (Aircon2100) at 38 mid/small sized airports  Selex ATM System at Bengaluru and Hyderabad 3

AIDC Status (International)  Delhi (AT3) AIDC with  Lahore  KarachiUnder testing. Working one sided in favour of Delhi  Varanasi  KathmanduReadiness at Kathmandu end awaited  Mumbai (AT3) AIDC with  MuscatMuscat using OLDI.  Karachi Initial testing carried out.  Seychelles  SanaaPlanned  Mauritius  Mogadishu  Chennai (AT3+) AIDC with  Kuala LumpurSuccessful trials carried out.  Male(Maldives)Ready for testing.  ColomboInitial Testing in March13. To start again after adaptation changes  Jakarta, YangonNot ready for AIDC testing 4

 Kolkata  Kathmandu  DhakaNo Automation system at other end.  Yangon  Ahmedabad  KarachiSuccessful trials carried out. 5 AIDC Status (International)

Chennai – Kuala Lumpur  During initial testing, it was observed that ABI messages sent from Chennai were rejected by Kuala Lumpur system citing CRC errors.  After detailed analysis at Chennai, it was determined that the rejection was due to incorrect calculation of checksum by the Kuala Lumpur system.  Kuala Lumpur Automation system was replacing the alignment characters with space characters prior to CRC calculation leading to discrepancy in the CRC checksum.  After sorting out the CRC errors by Kuala Lumpur, the AIDC message exchange was successful.  Both the States are working together to operationalize AIDC at the earliest after addressing a few minor issues.  LOA expected in December

Ahmedabad - Karachi  Trial operations commenced on  During the initial phase of testing, it was observed that messages were rejected due to route errors and mismatch in the coordination timing.  Coordination protocol dialogue time out was observed. After synchronizing Karachi AMSS/AFTN system time with India’s AMSS/ AFTN system time, the AIDC messages could be successfully exchanged between the two systems.  Further trial of AIDC for limited hours is in progress between Karachi and Ahmedabad.  Lessons learnt for implementation of AIDC with other ATSUs. 7

AIDC Status (National)  Delhi (AT3) AIDC with  Ahmedabad (Aircon2100)  Nagpur (Aircon2100)Implemented  Varanasi (Aircon2100)  Mumbai (AT3) AIDC with  Chennai (AT3+)Under trial operation Suspended due to adaptation changes  Chennai (AT3+) AIDC with  Mumbai (AT3+)Under trial operation  Bengaluru (Selex)  Hyderabad (Selex)Planned and configured  Trivandrum (Aircon2100)  Kolkata (Aircon Icon) AIDC with  Varanasi (Aircon2100)Planned 8

AIDC Status (National)  Bangaluru (BIAL) (Selex)  Hyderabad (HIAL) (Selex)Connectivity configured & Satisfactory testing done.  Mangalore (Aircon2100)  Chennai (AT3+) 9

AIDC Implementation Issues  Diverse ATM systems at ATSUs  Some issues in Aircon2100 (under resolution)  Non display of NO, CO in radar data block.  Generation of MAC msg on termination of FPL.  Route terminator "T" to be configured which affects AMAN profile/trajectories of the pairing stations  When the actual boundary ETO in an ABI varies from the system calculated ETO (based on the EOBT) of the overflying aircraft, the system rejects the ABI message with an LRM.  SSR codes of pairing unit sometimes do not match due to limited available codes. 10

Challenges in AIDC Implementation  Interoperability between diverse ATM Systems.  Implementation and system design issues attributed to revision of AIDC ICD versions.  Need for close bilateral cooperation between the concerned States for expeditious and successful implementation of AIDC  Bi-lateral agreements must be in place through MOUs or LOAs between the member states and may be reviewed to meet the intended objectives.  Compatibility with existing Automation system using OLDI, replacement of OLDI with PAN Regional ICD or co-existence of OLDI and AIDC applications are key issues that may have to be addressed by some of the states for harmonized AIDC implementation.  PAN regional ICD shall require synchronization of technology refresh cycles and maintaining backward compatibility of the automation systems for smooth exchange of AIDC messages. 11

Suggestions  HMI for AIDC functionalities may be considered to be included in AIDC Guidance Material.  To avoid prohibitive cost of frequent ATM Automation systems upgrade, backward compatibility of ICD versions should be assured. 12

Thanks for Kind Attention 13