Chapter C Cross Section (ANSWERS ) www.transportation.alberta.ca.

Slides:



Advertisements
Similar presentations
Barrier Warrants. Potential Hazards –Bridge Abutments/Piers/Approach Railing –Large Drainage Structures –Non-Breakaway Sign and Luminaire Supports –Embankments.
Advertisements

Clear Zone RDG Chapter 3. What is a Clear Zone? Clear Zone: A Clearer Definition A traversable area that starts at the edge of the traffic lane, includes.
Worked Example: Highway Safety Modeling. Outline –Safety Modeling »Safety Modeling Process –Set-up for Worked Example –Develop / Build Safety Model »Project.
Measurement for Civil Engineering works
Wisconsin DOT Facilities Development Manual (FDM)
Chapter 3: Elements of Design Transition Design Controls (p
ENS 207 engineering graphics
PIPE CULVERT By CH. VENKATARAMAIAH.
“You Could Learn a Lot About Guardrail From a Dummy…
Ken Kochevar FHWA Division Office Safety and Design Team Leader Ph: (916) The Safety Edge What is it? How does it work? What are the benefits?
© OPDS 2009 WELCOME TO OCEAN PARK DRIVING SCHOOL My Name is Kim Filby and I will be your Driving School Instructor First things first, do we all know our.
Management of Surface Water in Severe Weather Conditions from the Highway GORDON HUNT COUNTY DRAINAGE ENGINEER for OXFORDSHIRE COUNTY COUNCIL.
Highway Design Training Course Part II
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
MTO EMPIRICAL PAVEMENT DESIGN The following presentation contains references to Tables 6.02 and 6.03, and “MTO Empirical Design Examples”, all of which.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Chap 4 Cross Section Elements (pp.4-1 – 4-66 ) The following topics (pages) are covered in this lecture: Pavement (p.4-1 – 4-7) Pavement (p.4-1 – 4-7)
AASHTO Subcommittee on Design Reducing Engineering Standards: Good or Bad? July 14, 2008 Marc Cote, P.E. (302) /14/08.
AASHTO Subcommittee on Design Meeting June 10, 2004 NCHRP Project 3-69 Design of Construction Work Zones on High-Speed Highways Kevin M. Mahoney Penn State.
Design of Open Channels and Culverts
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as local roads and streets.
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
3R Standards Resurfacing, Restoration, & Rehabilitation Ch. 7 1.
Figure Figure 18-1 part 1 Figure 18-1 part 2.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Typical Sections All graphics taken from Ch 3 of HDM CTC 440.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
2002 AASHTO ROADSIDE DESIGN GUIDE A CONCISE OVERVIEW.
Geometric & Pavement Design Example Problems
 Cross section elements consist of the following:  1.Traffic lanes (carriage ways);  2.Shoulders;  3.Medians;  4.Curbs;  5.Side slopes.
Traffic improvements around a school. Horseshoe Lane West Create drop-off / pick-up point at side of road so that road doesn’t get blocked with traffic.
1 Development of countermeasures Hossein Naraghi CE 590 Special Topics Safety March 2003 Time Spent: 6 hrs.
Geometry Honors Section 7.1 Surface Area and Volume of Boxes.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 26 Schedule.
Pavement Analysis and Design
Local Government Section
Department of Civil Engineering,
AM test sample. outside 20 mm inside 19 mm wallthickness 1 mm height features 4 mm.
E4014 Construction Surveying Road Construction Plans.
Civil Engineering Department Design of Nablus Tulkarm Highway Prepared by Ahmed Mohammed Mustafa Anas Zeyad Belbeasi Under the Supervision of Dr. Khaled.
Clear Zone Conflicts in AASHTO Publications Dick Albin Washington State Department of Transportation Presented at the AASHTO Subcommittee on Design Meeting.
© 2009 Bentley Systems, Incorporated Richard W. Bradshaw Director of Development – Rail Design Modeling with Bentley Rail.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Approach Road - Evaluation and Rating Technical Standards.
Roadside CE 453 Lecture 23. Sideslopes – Foreslope (Backslope) Design 1.Considerations: Stability and Vehicle Recovery a.if slope “>” 3:1 use barrier.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 101 Wyoming DOT Place guardrail when there is a fill slope of.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 126 Japan D a = expected damage in collision accidents after.
1 Chapter 3: Elements of Design Horizontal Alignment (p.3-18 – 3-58) Be able to derive the minimum radius of a curvature formula Be able to tell a typical.
Recent Guideline Changes 1 Recent AT Guideline Changes Existing Documents New Technical Documents Bridge Structure Design Criteria Bridge Design Bulletins.
Trigonometry Section 3 – Solve Application Problems using Right Triangle Trigonometry.
Basic Hydrology & Hydraulics: DES 601
GEOMETRIC DESIGN: HORIZONTAL ALIGNMENT
Safety Audit Planned Project - Preliminary Design zGeneral Project Data yProject layout xRoad function Determine the road function. What kind of traffic.
Geometric Design: General Concept CE331 Transportation Engineering.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
Driver Education Rural Driving 82% of all miles in the U.S. are Rural Roads. Collisions in rural areas are equal to 2 x as many highway deaths as in.
Track Drainage CE2303 Railway Engineering. Drainage-General Drainage is the natural or artificial removal of surface and sub-surface water from an area.
OSHA’s NEW Walking-Working Surfaces
Approach Road Inspection and Rating
Highway Geometric Design Combination of Vertical and Horizontal Alignment.
Chapter 2 Geometric Design
Ellipse Worksheet # 2 Application of Ellipse
Road Traffic Injury Data in Ireland:
Geometric Design: General Concept CE331 Transportation Engineering.
Worked Example: Highway Safety Modeling
3R Standards Resurfacing, Restoration, & Rehabilitation Note: Need to update based on revisions to Ch 7 of HDM (freeway and non-freeway now covered in.
Views of Objects.
Road Design Standards for LGED
Presentation transcript:

Chapter C Cross Section (ANSWERS )

1. An 800 mm diameter culvert is needed in a 14 m fill. What gauge thickness should be used? Answer: Refer to Figure C-4.5a (page C-20). Gauge thickness should be 3.5.

2.On a highway with 800 AADT, an embankment is 10 m high and could be built at 3:1 slope or 4:1 slope. What is the best solution and why? Answer: See Section C rd paragraph. The 4:1 slope is the best solution provided that roadside barriers are not required. The life cycle cost for installation, maintenance and additional collision cost associated with barrier protection exceeds the cost of the additional fill material. This has been demonstrated through economic analysis.

3.For design of a railway underpass (highway going under), is a 4.9 m clearance acceptable? Answer: See Figure C Clearance Box for Railway Underpass No. 4.9m is less than the minimum for highways (exceptions are sometimes allowed on local roads).

4.a) Is a barrier warranted? Information provided: Design Speed = 110 km/h Embankment sideslope = 4H:1V AADT = 4,500 vpd Embankment height = 7m Show your work. Answer : No. See Figure C-5.3.1a. b) A 200mm diameter tree is located 9m from the edge of the driving lane. Is the tree considered a hazard? Why or why not? Answer: Yes. If the diameter > 100 mm it is considered a hazard. (Roadside Design Guide, November 2007).

5. Determine the desirable clear zone distance on a horizontal curve? Information provided: Design Speed = 70 km/h Sideslope 4H:1V AADT = 1,200 vpd Horizontal Radius = 700 m Answer: See Table C.5.2a and b. 5m - 6m on inside of curve and 5.5m - 6.6m on outside.

6. Based on AT’s policy- provide a wide subgrade to allow for two future overlays (typical 80 mm each). On new construction projects, what subgrade width is required? Information provided: - Granular base course (GBC) depth = 280 mm - First stage (lift) ACP depth = 70 mm -Final stage (lift) ACP depth = 90 mm -Two future overlays = 160 mm -Answer: Total depth = 600 mm. a) RAU ? 11m x 2 x 5 = 17m b) RAD ? 12.4m x 2 x 5 = 18.4m c)RCU ? 9m x 2 x 4 = 13.8 m See Figures CB6-3.50M5, CB6-3.50M6.

7. Based on AT’s policy- provide a wide subgrade to allow for two future overlays (typical 80 mm each). On grade widening projects, what subgrade width is required per side? Information provided: - Granular base course (GBC) depth = 300 mm - First stage (lift) ACP depth = 40 mm - Final stage (lift) ACP depth = 60 mm -Two Future overlays = 160 mm -Answer: Total depth = 560 mm a)Existing RCU grade widen to an RAU ? (11m - 8m)/2 + (5 x ) = 4.30 m per side.

Grade Widening Z = 5 (T+0.16m)