New Test Facilities at Argonne LAPPD Collaboration meeting June 10 2010 Matt Wetstein, Bernhard Adams, Matthieu Chollet.

Slides:



Advertisements
Similar presentations
Mostly by Gwyn Williams and the JLab Team, Presented by D. Douglas Working Group 4 Diagnostics & Synchronization Requirements Where we are and what needs.
Advertisements

Speed-I View from Material Side Qing Peng, Anil U. Mane, Jeffrey W. Elam Energy Systems Division Argonne National Laboratory Limitations on Fast Timing.
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
Target Status Report Lara Howlett University of Sheffield.
Study of the MPPC Performance - contents - Introduction Fundamental properties microscopic laser scan –check variation within a sensor Summary and plans.
Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
The Factors that Limit Time Resolution in Photodetectors, Workshop, University of Chicago, April 2011 What is known experimentally about timing determinants.
Fiber-Optic Communications James N. Downing. Chapter 5 Optical Sources and Transmitters.
Mid-IR photon counting array using HgCdTe APDs and the Medipix2 ROIC
The UC Simulation of Picosecond Detectors Pico-Sec Timing Hardware Workshop November 18, 2005 Timothy Credo.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Overview of Scientific Imaging using CCD Arrays Jaal Ghandhi Mechanical Engineering Univ. of Wisconsin-Madison.
10 Picosecond Timing Workshop 28 April PLANACON MCP-PMT for use in Ultra-High Speed Applications.
Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.
ALD 20µm Microchannel Plates
Report on SiPM Tests SiPM as a alternative photo detector to replace PMT. Qauntify basic characteristics Measure Energy, Timing resolution Develop simulation.
MPPC R&D status Kobe Univ. CALICE collaboration meeting Yuji SUDO Univ. of Tsukuba ~ contents ~ Introduction Linearity curve Recovery time.
Leroy Nicolas, HESS Calibration results, 28 th ICRC Tsukuba Japan, August Calibration results of the first two H·E·S·S· telescopes Nicolas Leroy.
ASPERA-3 July 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 7_25/ Page 1 Monthly Status Report Report due 7/25/00 Schedule statused.
Beam Diagnostics Collaboration Meeting March 18 th 2015 at Australian Synchrotron Mario Ferianis – Elettra.
Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June th 2010, Argonne. 1.
1 Max-Planck-Institut fuer Physik, Muenchen, Germany, 2 Humboldt-Universituet Berlin, Germany, 3 Univ. Complutense, Madrid, Spain, 4 ETH, Zurich, Switzerland,
O. Siegmund1 MCP #168/167 Tests Light transmission #168Photo #168 #168 and #167 have been used as a pair with a biasable gap of 0.6mm. Visually they have.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
WSO/UV-LSS Detector with large dimension MCP Baosheng Zhao* National Astronomical Observatories of CAS *
Update on Channel Plate Testing B. Adams, K. Attenkofer, M. Chollet, Z. Insepov, J. McPhate, O. Siegmund, D. Walters, M. Wetstein, Z. Yusof for the LAPPD.
Design and fabrication of electrical measurement system for microchannel plates (LAPD weekly group meeting) Feb Anil Mane, Qing Peng, Jeffrey Elam.
Preparation of Mock tile MCPs Anil Mane, Qing Peng, Jeffrey Elam Argonne National Laboratory.
EO sampling technique for femtosecond beam characterization
Photo-detector Tube Construction Laboratory Considerations Dean Walters Argonne National Laboratory.
MCP MicroPitting and Performance Issues Latest 40µm pore 8” MCPs had some patchy discoloration Cleaning using standard techniques at SSL made no difference.
BURLE update Peter Križan Friday meeting, Mar 24, 2006.
Abort Gap Monitoring Randy Thurman-Keup 6 / 8 / 2004 LARP Meeting.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Space Sciences Laboratory, University of California, Berkeley SSL-UCB, ALD MCP Test Progress ML201-B-2 12nm ALD After cleaning ML201-B-1 6nm ALD.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
SIAM M. Despeisse / 29 th January Toward a Gigatracker Front-end - Performance of the NINO LCO and HCO Matthieu Despeisse F. Osmic, S. Tiuraniemi,
Development of a System for High Resolution Spectroscopy with an Optical Frequency Comb Dept. of Applied Physics, Fukuoka Univ., JST PRESTO, M. MISONO,
Timing Studies of Hamamatsu MPPCs and MEPhI SiPM Samples Bob Wagner, Gary Drake, Patrick DeLurgio Argonne National Laboratory Qingguo Xie Department of.
33mm MCP Testing at UC Berkeley
Update on Physical Parameters that influence Timing Jean-Francois Genat LPNHE Paris LAPPD Electronics & Integration Review July 9th 2012, Chicago.
Lecture 3-Building a Detector (cont’d) George K. Parks Space Sciences Laboratory UC Berkeley, Berkeley, CA.
Atomic Layer Deposition for Microchannel Plate Fabrication at Argonne
TIMING COUNTER: status report Giorgio CECCHET, PSI July 11th, 2003.
Performance of new MPPC Nov. 21 Korea-Japan joint meeting Takashi Maeda Hideki Yamazaki Yuji Sudo (University of Tsukuba) --- Contents ---
MCP Testing Using Square Conductive Pads as Readout Anode Sagar Setru 1/19/2014.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
Calva update Nicolas Leroy for the CALVA group (LAL, ESPCI, LAPP, LMA) Main Laser Cavity 1Cavity 2 Aux. Laser L1 L2 M1M2M3.
Study of the Radiation Damage of Hamamatsu Silicon Photo Multipliers Wander Baldini Istituto Nazionale di Fisica Nucleare and Universita’ degli Studi di.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Overview B A B AR L1 DCT Upgrade FDR Masahiro Morii Harvard University Scope of the Project Current Status Schedule  Commissioning.
Trigger & Tracking detector for CMS
Discrete Dynode Structures Using ALD and Other Techniques for MCPs
The Electromagnetic Spectrum High Harmonic Generation
Status of the SPARC laser and “dazzler” experiments
Using a digital micromirror device for high-precision laser-based manufacturing on the microscale Please use the dd month yyyy format for the date for.
Strong infrared electroluminescence from black silicon
Frontiers in Photocathode R&D
Detector development for
Directional Optical Module Integration
Update on APS Testing.
Department of Physics and Astronomy,
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Kansas Light Source Laser System J. R. Macdonald Laboratory
Status of AAO 33mm plates at ANL
Simulation of Time-Resolved Carrier Dynamics
LCLS Injector Laser System Paul R. Bolton, SLAC April 24, 2002
Readout Electronics for Pixel Sensors
Presentation transcript:

New Test Facilities at Argonne LAPPD Collaboration meeting June Matt Wetstein, Bernhard Adams, Matthieu Chollet

Sector 7 beamline at the APS Current status of MCP testing Next step New facility 2

APS Sector 7 A E D C B Ti:Sapphire Femto-second Laser 800 nm (near infrared) 2.5W average output power 1 or 5 KHz repetition rate 55 fs pulses 3

measures the optical and electronic characteristics of MCP/Photocathode/stripline assemblies simultaneously with precision timing and gain in realistic operating conditions. Working with ALD functionalized MCP’s Working with stripline anode structure similar to final product Understand what MCP chemistry work Photon counting, pulse height distributions, amplification curves Image profile, position resolution, signal shape, uniformity I/V curves, dark current, technical issues Advanced Characterization in the time domain Transit time spread, arrival time, first strike problem Full sized testing 4

Test setup: 5

BBO crystals 800, 400nm rejection mirrors Test Chamber UV LED Flip mirror Laser setup: Reference Diode 6

Achievements: A working characterization system built from scratch. Developed methodology for UV-LED and laser based MCP Measurements Demonstration of enhanced amplification with high SEE ALD coating on commercial MCP. First measurements of a working Argonne MCP pair. Stronger collaboration with fabrication, simulation, and testing groups. Faster turn-around and feedback. 7

Next step: B-Flange Status: We have: Flange Adaptor flange to fit current chamber parts for 2-3 complete MCP sample holders Automation: Voltage scan/data acquisition script WIENER power supply...ordered (not sure of lead time...) Large Chamber What we critically need: Photocathode (being built) Fixtures to attach sample holder to B flange (being ordered) spacers to apply bias voltages across inter-MCP gap and PC gap (need to finish design and have built) A way to take the adapted B flange on and off the small chamber (rubber gasket) signal board with parallel connectors (being built) Hoping to ramp this us in the next few weeks… 8

Parasitic use of the beamline laser 9 3 months experiments Laser available only during 1 month shutdown time ECD

Class 3B Laser: 800nm <1w average output power 50 fs 1 KHz New laser room: 10

11 Double pulse excitation: /4 MCP IR UV Relaxation time measurement Equivalent circuit of a pore

12 Conclusion Methodology for MCP characterization Automated measurements is on the way. Database to keep track of samples and test results Update of test setup with B-flange Ready the big chamber for real size test