Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

GNSO/Council Restructure Enhance & Support SGs/Constituencies Improve Communications & Coordination Revise the Policy Development Process Adopt a WG Model.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to CoU V1a, 20 Jan 2012 Doc: Source: ETSI Agenda.
4.1 [0] Criteria for Successful Consolidation ATIS Delegation Presenter: Gale Lightfoot (Cisco Systems) Meeting of Potential M2M Consolidation Partners.
7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
Joint Legal/Participation Ad-Hoc 21 March 2012 Report.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
1 ITU-R Liaison Group Report - Session #69 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0087r1.
M2M Global Initiative OneM2M April 24, 2012
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
Report of Methods and Procedures Subcommittee Group Name: Steering Committee Source: Laurent Laporte, Sprint, Meeting Date:
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Summary of main questions on the Partnership Agreement and the secretariat support End of day 1.
NMWG GGF13 Seoul March 2005 R. Hughes-Jones Manchester Network Measurements Working Group Discussion: Current Work & Milestones Richard Hughes-Jones NM-WG.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Minutes of the Meeting IoT WG GISFI #7 New Delhi, Dec 19-22,
1 ITU-R Liaison Group Report - Session #67 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
© 2013 IBM Corporation OSLC WG Transition **DRAFT** Plan 8 April 2013 Open Services for Lifecycle Collaboration Lifecycle integration inspired by the web.
4.4 Timeline for M2M Consolidation Susan Miller ATIS Head of Delegation Meeting of Potential M2M Consolidation Partners #2 Washington, D.C. August 17-18,
ITU-R Liaison Group Report - Session #62 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0072 Date.
Vertical Outreach Program Create story (presentation) – Identify the needs/challenges (beyond telecom- centric viewpoint) – What we are trying to do –
PROMCODE Technical Committee Convener Call 14 February
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
Doc.: IEEE /296r0 Submission May 2002 Erwin Noble, PhilipsSlide 1 ETSI-BRAN #28 Interworking Group Liaison Report to IEEE WNG Erwin Noble.
Geneva, October 9, 2012 GSC16bis-IPR-09 TTC Activities on IPR in Standards October 9, 2012 Yukio Hiramatsu Chairman, TTC IPR Committee Document No: GSC16bis-IPR-09.
- 1 - TTA View of Budget & Secretariat Functions March 28~29, 2012 (Tokyo, Japan) TTA.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
Summary of main questions on the Partnership Agreement and the secretariat support.
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
GNSO/Council Restructure Enhance & Support SGs/Constituencies Improve Communications & Coordination Revise the Policy Development Process Adopt a WG Model.
OData Technical Committee Convener Call June 5, 2012.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
Doc.: IEEE /360r0 Submission September 2002 Stan Bottoms, ConsultantSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Technical Plenary Terms for the collaboration with P2413 From: oneM2M TP Chair Source: Meeting Date: Agenda Item:
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
GNSO Council Restructure Enhance & Support SGs/Constituencies Improve Communications & Coordination Revise the Policy Development Process Adopt a WG Model.
Preparation of the Self-Study and Documentation
New gTLD Subsequent Procedures F2F
Transition Implementation Status Reporting
Introductory Remarks and Meeting Goals
Release Timeline Discussion R2 and beyond
IEEE TGa Project Timeline
Simplification of Lighting and Light-Signalling Regulations
TTC Activities on IPR in Standards
Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman
How To Use 1 Delete the lines and text you don’t need 2
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
SC SC SC WS SC S HIS Background document Seminar document
Submission Title: [Task Group 1 Report] Date Submitted: [8May00]
IEEE IMT-Advanced Review Process
SDS Review of Scenario Studies Timeline
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
How to use 1 Delete the lines and text you don’t need 2
ETSI-BRAN #29 Interworking Group Liaison Report to IEEE WNG
How To Use 1 Delete the lines and text you don’t need 2
Presentation transcript:

Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI Agenda item: 7 Editors note: [Text in red within square brackets: To be deleted] Text in blue: New inserted text based on version of 20 Jan 2012 (input to CoU V1a)

Introduction Summary of timeline discussion at Washington meeting: [M2MCons02_31 Draft Meeting Report.doc] “Mr. Foote presented a table that captures a summary of the SDO positions along with a list of consensus items [M2MCons02_26]. There is agreement that the launch of the consolidated group should take place no later than 1Q2012, with the understanding that milestones will be met along the way to meet the established threshold criteria.” [M2MCons02_26 - Summary of SDO proposals on M2M Consolidation 4.4.pptx] “Launch of consolidated group no later than 1Q2012, with milestones to be met along the way to meet the threshold criteria.” In order to keep the envisaged date for launch of the M2M consolidation (Q1/2012) a more detailed time schedule with well defined milestones is necessary. The next pages propose a timeline including milestones and definition of milestones. 2

JULAUGSEPOCTDECJANFEBMARAPRMAYJUNJULAUGSEPOCT M6: WG start prepared Virtual meetings Timeline 3 SDO Meeting#01, Seoul, 21 Jul SDO Meeting#02, Washington, Aug SDO Meeting#03, Berlin, Dec Reach out to verticals M1: “Soft Launch” M2: Final Consensus M4: Official Signing Technical Plenary Meeting#1 Virtual SDO meetings SDO Meeting#04, Tokyo, Mar M3: Final Draft Virtual meetings Steering Committee Meeting#1 Steering Committee Meeting#2 M5: TP start prepared

Milestones (1)  Milestone M1 – “Soft Launch” IPR regime agreed Communiqué released Material for communication with verticals updated to include Berlin meeting results Target date: 18 Jan 2012, completed  Milestone M2 – Final Consensus Feedback from vertical reach outs incorporated into major principles Final Consensus reached and documented on all major principles (scope, partnership and participation principles, structure, legal status, participation rules, rights and responsibilities, level of secretariat services, funding) Initial Organizations identified and start work on drafting the founding documents Target date: [17 Feb] 14 Mar

Milestones (2)  Milestone M3 – Final Draft Final review of feedback from vertical reach outs Final draft of founding documents available (Participation rules, procedures, IPR policy and anti-trust policy, membership fee structure and initial resources agreed upon Secretariat support activities identified (online web presence, on-site meeting support, document editing, document management, branding/publicity) Convenor of Steering Committee nominated Target date: [9 Mar] 30 Mar 2012 Milestone M4 – Official Signing Founding agreement signed Provision of secretariat function agreed upon Members of Steering Committee identified Preliminary list of members of the initiative identified Target date: [30 Mar] 04 May?

Milestones (3)  Milestone M5 – TP start prepared Convenor of Technical Plenary nominated Participants of Technical Plenary identified Working Procedures approved List of standards/specifications to be transferred into GI agreed Target date: [19 Jun] 24 Jul 2012  Milestone M6 – WG start prepared Initial Work Plan defined Initial Working Groups defined Convenors of Working Groups nominated Meeting schedule defined Target date: [31 Jul] 04 Sep