1 April 2009 CSTS WG: CSTS WG: report to the CSS Area Colorado Springs 25 April 2009 Yves Doat.

Slides:



Advertisements
Similar presentations
1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
Advertisements

November SLS RFM and RNG REPORT 18 November 2004.
7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 October 2009 Cross Support Transfer Services (CSTS) Future Services as of Spring 2014.
CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
ESTEC, Noordwijk, Netherlands 27 Oct 2009 SERVICE ARCHITECTURE FOR SPACE -- BOF 1.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
CSSM Meeting Summary Spring 2013 Meetings 15 – 18 April E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Bordeaux, France.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada May 2004 DLR Report Martin Pilgram,
31 st October – 4 th November 2011 Fall 2011 Meeting Agenda Boulder, Colorado, USA SOIS Application Support Services WG Conclusions & Actions.
CSSM Meeting Summary CCSDS CSSM Technical Meetings London, UK 10 – 14 November 2014.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
May11-cesg-1 status:OKCAUTIONPROBLEM comment: Very Good SOIS Area Report Wireless WG Goals for the spring meeting Complete the discussions and agree on.
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
16 th – 19 th April 2012 Spring 2012 Meeting Agenda Darmstadt, Germany SOIS Application Support Services WG.
Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
IPR WG REPORT November Information Packaging and Registries WG REPORT November 2004.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
DTS & CSTS REPORT 15 April 2005 Athens, Greece CSTS - 1 DTS & CSTS WG STATUS REPORT, End of Spring 2005 Meeting Yves Doat Chairman 15 April 2005.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS Engineering Steering Group: Report to the CCSDS Management Council CMC Meeting May 2004 CSA, Montreal, Canada Adrian J. Hooke Chairman, CESG.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
Cesg-1 28 April 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.
Navigation WG Report D. Berry NASA J. Fertig ESA.
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
SOIS Application Support Service WG and SOIS Plug-and-Play BoF Spring 2008 Report.
November SECURITY WORKING GROUP REPORT November 2004.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
Panel P1J: Navigation Data April 2002 CCSDS P1J Status Report Spring Meeting, ESA/ESOC, Darmstadt, Germany Dates: April 8 – 11, 2002 Felipe Flores-Amaya.
1 19 September 2005 Space Link Services Area report to CESG Atlanta, Georgia, USA, 19 September 2005.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
MD CSTS prototype status 2012 : MD user (NASA) based on NASA Fw development MD provider (CNES) based on ESA Fw development NASA/ESA Fw interoperability.
June MOIMS AREA PLENARY NAVIGATION WG REPORT June 2006 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan April, 2009 Colorado Springs, CO, USA Takahiro Yamada, JAXA/ISAS.
CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
Spacecraft Onboard Interface Services Application Support Services Working Group (SOIS-APP WG) CCSDS Spring 2013 Meeting.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
1 Y.Doat (ESA) April 2012 Object Identifiers Object Identifiers CSTS Framework Annex C April 2012.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
10-Dec-2012-cesg-1 IOAG-17d telecon 19th Nov 2013 CCSDS Engineering Steering Group (CESG) Report to the IOAG.
The CCSDS Security WG is chartered to:
CCSDS Systems Engineering Area: Security Working Group
ESAW Workshop 2009 Martin Götzelmann, VEGA Yves Doat, ESA/ESOC
SOIS-APP Working Group Report Jonathan Wilmot (WG Chair)
CWE File Structure.
Delta-DOR WG: Report of the Fall 2010 Meeting
SPACECRAFT ONBOARD INTERFACES SERVICES
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
Presentation transcript:

1 April 2009 CSTS WG: CSTS WG: report to the CSS Area Colorado Springs 25 April 2009 Yves Doat

2 April 2009 CSTS WG REPORT CONTENTS A.SUMMARY TECHNICAL STATUS B.INTRA & CROSS-AREA TECHNICAL ISSUES C.OTHER ISSUE AND CONCERNS D.SUMMARY OF MAJOR ACCOMPLISHMENTS

3 April 2009 SLE: SLE Services Pink Sheets reviewed Next steps: RID Disposition, Area resolution and publication. CSTSes: Framework: ASN.1 Reviewed Prototype: Coordination & Specification of a dummy service Concept: detail review Guidelines: detail review Introduction presentation will be run before the 3 books review in all Agencies. Monitoring Data Service: Content & structure reviewed. Monitoring will be limited to the specification of the service (No parameters) Monitored parameters will go in a “Data Dictionary” – Book colour Blue (TBC) Others: AOS-CLTU uplink: Status and new version presented by NASA. Final version pending the SLE RIDs disposition. In case IOAG would require an AOS-uplink service to be implemented, the WG recommends to base it the specifications and subsequent implementation on the Framework and Guidelines. Interagency routine file transfer guidelines: Initial brainstorming. CSTS WG REPORT A.SUMMARY TECHNICAL STATUS

4 April 2009 Books: Framework, Concept Guidelines, Monitoring Service, Tracking Service Interoperable Prototypes (On-going): Framework: subset of Framework functionality (Transfer of ASCII data) User: Goddard / Provider: ESA Monitoring: subset of service functionality (cyclic delivery) User: Goddard / Provider: ESA Guidelines: Prescriptive book but no prototyping possible status:OKCAUTIONPROBLEM CSTS Books & Prototype X 3 books not covered CSTS WG REPORT New Books: File Transfer Magenta book for CSTS SIID Best Practices. CSTS Reference Model & Monitoring Parameters (Data Dictionary)

5 April 2009 CSTS Planning CSTS WG REPORT Project To Secr. Iss,Prototype User Prototype Provider Framework R 07/ NASAESA Concept G 07/ N/A Guidelines R 07/ N/A Monitoring R 10/ NASACNES Tracking R 01/ TBD RUFT (1) TBD (1) Work Item to be created on CWE

6 April 2009 B.INTER- & CROSS-AREA ISSUES Service Instance Identifier for CSTS Services: (Many discussions with SM) Spacecraft Name; Antenna; Transfer Service Profile Identifier. Coding Group (SLE Review) Time tagging: phrasing in SLE books Exclusion of different coding schemes on one physical link CSTS WG REPORT

7 April 2009 C.OTHER ISSUES AND CONCERNS Several books to be produced (CSTS SIID best practices, CSTS RM, Data Dictionary, Files Transfer): Editors could not be identified at this stage. CSTS WG REPORT

8 April 2009 D.SUMMARY OF MAJOR ACCOMPLISHSMENT SIID Defined for CSTS with support from SM; Prototypes definition and coordination; The 3 books (Framework, Concept and Guidelines) will be published in parallel. CSTS WG REPORT