Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

Gavin Astin 06 May 2011 Study overview. Study Overview 06 May About DNV Independent foundation with around 9,000 employees. Det Norske Veritas.
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Durban Decisions on the Clean Development Mechanism DUAN Maosheng Chair of the CDM Executive Board First SDM Joint Coordination Workshop Bonn,
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
WP4 – Task 4.4 LCA Activities
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
ISO GHG Quantification and Verification Standards Dr. Chan Kook Weng, Malaysian Palm Oil Board, Convenor, ISO TC207 WG5.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Implementation of Capacity Development for CDM Project in Viet Nam Nguyen Khac Hieu Climate Change Coordinator Vietnam National Office for Climate Change.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
EMS Auditing Definitions
1 Introduction, reporting requirements, workshop objectives Workshop on greenhouse gas and ammonia emission inventories and projections from agriculture.
Institutionalizing the GHG Protocol Kevin Boehmer, Canadian Standards Association Mark Barthel, British Standards Institution WBCSD/WRI Side Event - The.
Carbon Trading: The Challenges and Risks John Drexhage Director, Climate Change and Energy International Institute for Sustainable Development Agriculture.
Energy efficiency measures in the public building sector: the DEEP project Freiburg, 14 June 2007 Philipp Tepper Sustainable Procurement ICLEI - Local.
From Pipe Dreams to Pipelines: Getting the first CDM project in Israel going Presented by: Adi Dishon Managing Director.
“Establishment of the Clean Development Mechanism (CDM) National Authority, Operational Framework and Support Systems for the Philippines”
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Expertise everyday, everywhere Verifying Sinks and Bio-energy Projects Irma Lubrecht Société Générale de Surveillance.
Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det.
AN INTERNATIONAL FOREST CARBON ACCOUNTING FRAMEWORK By Zoe Harkin and Gary Bull Task 25/38 Workshop, Canberra, Australia - 29th March, A system for.
Expert Group Meeting ‘Using Energy Management Standards to stimulate persistent application of Energy Efficiency in Industry’ Alexandre V. MELLO Environmental.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
CLEAN ENERGY MECHANISMS IN CONVENTIONAL POWER GENERATION H.AZOUZ, CDM Project Management Officer at STEG
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Procedures for Accounting and Baselines for CDM Projects EU Fifth Framework Programme Sub-programme: Energy, Environment and Sustainable Development Summary.
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
The Cement Sustainability Initiative A Sectoral Approach for the Cement Sector December 2007 Patrick Verhagen, Holcim DEDICATED TO MAKING A DIFFERENCE.
PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA)-PERFORMANCE MEASUREMENT FRAMEWORK Module 4: The Assessment Process, Stakeholders Involvement & Quality.
06 May 2011 Building a Culture of Integrity in DNV Cecilie Hultmann, senior consultant, Det Norske Veritas (DNV)
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
The Marine Stewardship Council: A Multi- Stakeholder Fisheries Assessment Programme for Sustainable Fisheries Oluyemisi Oloruntuyi (MSC)
Validation and Verification of CDM projects SGS Climate Change Programme Shivananda Shetty Business Manager – SGS India Syed Khursheed Zaidi Operation.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
1 Verification Overview What is Verification?  Independent, third-party review of reported emissions Why is it Important?  Ensures that an inventory.
RGGR: Regional GHG Registry Joanne Morin, NH DES RGGI Stakeholder Meeting September 13, 2004 Boston, MA.
1 This project is supported by the European Union 3 rd MEDREG-IMME Seminar Reform and Opening of Maghreb Electricity Markets September 2013 MRA (Malta)
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
The standard solutions to improving environmental performance Vicki Gomersall, Product Manager.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Environmental Health Management (EN481)
Transmission Planning Code – Draft Document
Operationalizing Export Certification and Regionalization Programmes
CDM Activity Cycle under the Marrakech Accords
Presentation transcript:

Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)

DNV’s International Network The DNV organisation comprises 300 offices in 100 countries, with a total of 5,500 employees DNV is an autonomous, self-owning foundation established in 1864

Introduction Key issues for scenario analysis Key issues for control group projects DNV experiences

Project design Validation Registration Project implementation/ monitoring/reporting The CDM project stages Verification Certification Project owners Independent party Registration Body Involved parties: Stakeholders Report made public, hearing Stakeholder

CDM project validation Validation Project DesignBaseline Study Monitoring Plan Stakeholder Views

CDM validation - work flow Tasks considered by the audit team for a validation exercise

Validation task set-up Phase 1: Risk-based approach to reviewing received material Verification of the assumptions and methodology Technical review of the documentation Assessment of how sensitivities and data uncertainties are addressed Assessment of the monitoring/verification protocol Review of GHG data management, control & reporting Review of the concept sustaining projects “additionality” Review of local stakeholders’ comments

Validation task set-up Phase 2: Tasks during site visit Confirm local & national monitoring capability Verify sustainable development indicators conform to local and national priorities Confirm project scenarios Assessment of the monitoring/verification protocol (to a more detailed level) Assessment of comments from public review process Preliminary conclusions of validation audit/ draft report and validation protocol for review

Validation task set-up Phase 3: Disclosure of any outstanding issues Finalisation of validation report in publishable format and issuance of final validation opinion. Forward request for registration.

Baseline validity - crediting period Two possibilities for crediting period. Project participants shall select one of the following: (49a): 7 years + max two renewals of 7 years each, using original or updated baseline (Operational entity determines and informs CDM Exec. Board) (49b): Maximum 10 years with no option of renewal

The “with project” and “without project” scenarios are useful for illustration of baselines Key issues: –Equality of services –Ascertain the same project boundaries –Supply and demand changes Scenario analysis

Key areas to assess: –Existing policies e.g. on renewable energy –Energy supply infrastructure development, e.g gas pipeline extensions –Technology present and not present in Host Country –Consequences of political aspirations, e.g. EU accession –The balance between supply and demand If supply < demand, the baseline may change! Scenario analysis

Chacabuquito Hydropower Project –Supply > demand: Marginal plant baseline approach selected and monitored (Coal-fired plants) –Demand > supply: Least cost option (gas-fired CHP) of capacity expansion falls in as default baseline. Scenario analysis example

Barrier analysis Barrier analysis are useful for validators in order to understand present and future scenarios –“Tangible” barriers, can be quantified: Financial/investment Technology Market penetration Legislation –“Intangible” barriers, only qualitative: Competitive disadvantage Capacity/management resources Institutional

Control group baselines Requires significant work from the Project Proponent’s side! Validator must ensure that: –Monitoring capacity in place, inclusive of data processing capacity –Control group data addresses the key issues (“must have!”, not “can have” data) –The data to be collected reflects the complete picture of necessary information –Action points are clearly described when thresholds are exceeded

Control group baselines & verification Control group baselines are likely to create more work during project verification. Not only emission records and project performance data, but also control group data need to be verified Likely to require specialized skills to a greater extent than a “normal” GHG verification, as control groups lie outside project boundaries

Baseline and Credit Year GHG emissions [t CO 2-eq ] BAU baseline emissions Emission baseline allowing for existing measures for abatement With project emissions Additional emission reductions Abatement project

Experiences Standardization may help on the way, but no project is identical to another! Need for specialized skills among validators despite standardization Projects using control groups are usually more labor demanding than others

GHG emission reduction projects DNV experiences With GHG emissions reduction projects Principles of ISO series for management systems Additional principles of: allocation, materiality and completeness Industry standards, including risk-based approach DNV’s basis for GHG auditing: Robust system ensuring transparency, efficiency and accountability and maintaining public trust