© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project 071103 January 2011.

Slides:



Advertisements
Similar presentations
SG Systems - Service Definition Team Chair: Gerald Gray, CIMple Integrations Co-Chair: Shawn Hu, Xtensible Solutions
Advertisements

SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
May 3, 2010OpenSG – SG Systems – Service Definitions1 Chair: Gerald Gray, CIMple Integrations Co-Chair: Shawn Hu, Xtensible Solutions.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
Utilization of CIM at Progress Energy with the Smart Grid DSDR Project Top-down approach to Integration Software Development Jon Drew November 12, 2009.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
EPRI Smart Grid Demonstration and CIM Standards Development
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
October 19, 2009OpenSG - AMI-ENTERPRISE1 The Framework, Standards, and Plans AMI-Enterprise Service Definition Team.
1 ISO/RTO Council Wholesale Demand Response Projects & OpenADR David Forfia.
MTEI Methods & Tools for Enterprise Integration
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
Working Group Summaries Genval, Belgium May 14, 2009.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
Project CIM Test Development Process John Simmins Weekly Status and Planning Meeting 2/1/2011.
Common Information Model and EPRI Smart Grid Research
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
Electric System OperationsTennessee Valley Authority 1 Coordinated Data Exchange FERC Technical Conference July 14, 2004 Information Technology for Reliability.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/29/2011.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/21/2011.
OpenSG and Conformity Bruce Muschlitz EnerNex Corporation Knoxville October 2009.
The Interactions Between Hosting and Hosted Applications WG23 Notes Gathered by Dongbai Guo.
CSE9020 Schedule, / 1 The Suggested Schedule Week Content/Deliverable 1. 4/3Unit Overview, Project Description, Meetings, Group Formation 2. 11/3Project.
Draft Edge Conformity TG DraftSlide 1 Submission Title: OpenSG San Francisco Abstract Test Cases Date Submitted: February 3, 2010 Source: Edge Conformity.
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/19/2011.
Project CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011.
May 2010 Slide 1 Submission Title: OpenSG Tysons Corner OpenADE Boot Camp Source: OpenADE Task Force Abstract: SG Systems OpenADE Task Force Boot Camp.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
© 2011 EnerNex. All Rights Reserved. Lemnos Interoperable Security Project Background and Benefits 8/11/2011.
1 ECCF Training 2.0 Implemental Perspective (IP) ECCF Training Working Group January 2011.
CIM Test Methodology Overview John Simmins 5/24/2011.
SG Systems - Service Definition Team Chair: Gerald Gray, Guiding Principle Consulting Co-Chair: Shawn Hu, Xtensible Solutions.
Service Definitions A Framework For Standard Interface Development.
WG Summaries Austin, TX October 24, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Scope: Overall management of the CIMug Development and tuning.
CIM Test Methodology Overview John Simmins 5/3/2011.
# 1 Application Integration Architecture A Framework For Standard Interface Development Gerald R. Gray, Consumers EnergyJune 23, 2008.
Project CIM Test Development Process
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona May “ System Interfaces for Distribution Management “ TC57 WG14 Standards IEC
6 January 2016Conformity Boot Camp1 Boot Camp Edge / Enterprise Conformity.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/15/2011.
Working Group Summaries Charlotte, NC November 12, 2009.
Gerald Gray Guiding Principle Consulting. Overview  OpenADR background  Use of the CIM (IEC 61968/61970)  Leveraging other CIM-based reference models.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
AMI -ENT Service Definition Team Step-by-Step Modeling and Artifacts Generation Process.
OpenSG SG Conformity – Security Conformity July 22, 2010 Bobby Brown.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
Project CIM Test Development Process John Simmins Project Overview 1/27/2011.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
CIM User Group Overview Terry Saxton Vendor Co-Chair Open Smart Grid AMI-Ent Task Force Meeting July 14, 2009.
professional in oracle fusion adf online training
CIM Test Development Process
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
CIM Test Methodology Overview
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) Meeting Agenda Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Welcome to the CIM University
Technical Update MultiSpeak Users’ Group Meeting
Boot Camp - Conformity March 7, 2011 SF Bay Area.
Service Definition Status & Plans
InterOp Technical Notes
Interoperability Test Message Patterns for IEC
Scott Neumann November 1, 2009
Error Handling for IEC Scott Neumann September 29, 2009.
Interoperability Test Message Patterns for IEC
Interoperability Test Message Patterns for IEC
Presentation transcript:

© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011

© 2010 EnerNex Corporation. All Rights Reserved. 2 CIM test process overview CIM Test Methodology compatible with –IEC WG 14 –CIM Users Group –OpenSG And possibly MultiSpeak Test process defined, documented and repeatable Vetted with multiple utilities, vendors and user groups Tests designed for multiple implementation environments (test only messages, implementation agnostic) –Legacy point-to-point –SOA with or without ESB –Various ESBs (WebSphere, WebLogic, TibCo, GlassFish) Tests openly available

© 2010 EnerNex Corporation. All Rights Reserved. 3 Project Schedule

© 2010 EnerNex Corporation. All Rights Reserved. 4 Types of CIM-based Tests CIM Tests Abstract Test Cases Conformance Tests Interoperability Tests Concrete Detailed Test Procedures Conformance Tests Interoperability Tests

© 2010 EnerNex Corporation. All Rights Reserved. 5 Abstract Test Cases High level test description which defines: Test Objective Formal Requirements Tested CIM part, profile and XSD OpenSG SRSs OpenADE, OpenADR, OpenHAN,AMI-ENT Applicable to ESB, non-ESB web service and legacy socket implementations