Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.

Slides:



Advertisements
Similar presentations
Update on Regional Haze November 15, 2012 Michele Notarianni EPA Region 4 1.
Advertisements

Emissions Reductions Beyond the Clean Smokestacks Act (CSA) Emissions Reductions Beyond the Clean Smokestacks Act (CSA) Environmental Management Commission.
Garry Kaufman Deputy Director Colorado Air Pollution Control Division June 6, 2014.
Update on CAAAC Workgroup, EPA Guidance, and Possible Future EPA GHG Regulations.
2005 NEI - Changes. 2 A Call for Change Address external critiques –National Academy of Sciences report –Clean Air Act Advisory Committee report –NARSTO’s.
Air Protection Branch 1. 2 Air Quality Activities Support the Mission of the Air Protection Branch Monitor and Report Air Quality Data Analysis and Planning.
Ozone in Colorado: Issues and Reduction Strategies Presentation to the Colorado Environmental Health Association October 2,
ADEQ Uses of ICF Modeling Analysis Tony Davis, Branch Manager – Air Planning Arkansas Department of Environmental Quality Criteria Pollutant Modeling Analysis.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
December 4, Utility MACT Air & Waste Management Association/EPA Information Exchange December 4, 2002 William H. Maxwell Combustion Group/ESD.
Control Measures for the 8-hour Ozone SIP Metropolitan Washington Air Quality Committee April 27, 2005.
Air Pollution Control Board October 1, 2008 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of Environmental Management We Protect.
MICHELLE WILSON ARIZONA DEPARTMENT OF WEIGHTS AND MEASURES SEPTEMBER 17, 2013 Stage II Vapor Recovery Update.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
Presentation to the Central Lane MPO Policy Committee March 08, 2012 Oregon Sustainable Transportation Initiative Statewide Transportation Strategy Statewide.
1 WRAP Fire Tracking Systems Draft Intent of WRAP FTS Policy – Assist states/tribes to address emissions inventory and tracking associated with fire in.
1 EPA’s Proposed Interstate Air Quality Rule Consideration of Issues Associated with Possible Expansion of IAQR to the West Patrick Cummins, WGA Background.
The Western Regional Air Partnership (WRAP) WRAP formed in 1997 as the successor organization to Grand Canyon Visibility Transport Commission (GCVTC) –
National Capital Region Climate Change Report OVERVIEW Joan Rohlfs, Chief, Air Quality Planning Metropolitan Washington Council of Governments October.
Final Amendments to the Regional Haze Rule: BART Rule Making June 16, 2005.
Fire Emissions Joint Forum –Section 308 Strategies for Fire Coordinating efforts of states changing or developing smoke management strategies for regional.
SIP Steering Committee Meeting March 29,  In October 2011, EPA issued draft SIP and modeling guidance related to the 1-hour SO2 standard issued.
EPA’s Proposed Clean Power Plan U.S. Environmental Protection Agency.
BART Control Analysis WESTAR August 31, 2005 EPA Office of Air Quality Planning and Standards Todd Hawes
Air Quality Benefits from Energy Conservation Measures Anna Garcia April 2004.
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
1 Potential Impacts of a National SO 2 Program WRAP Forum June 3, 2004.
Stationary Sources Joint Forum Update Eric Massey Arizona Department of Environmental Quality Lee Alter and Patrick Cummins Western Governors’ Association.
Diesel Risk Reduction Plan California Environmental Protection Agency Air Resources Board.
Preparation of Control Strategies October 18, 2007 NAAQS RIA Workshop Darryl Weatherhead, Kevin Culligan, Serpil Kayin, David Misenheimer, Larry Sorrels.
OTC Attainment Planning Update SIP Steering Committee April 13, 2011.
Next Steps in Regional Haze Planning in the Western U.S. Prepared by the WESTAR Planning Committee for the Fall Business Meeting, Tempe, AZ October 31,
Response to WRAP Air Managers Committee Memo “Request for Cost Estimates” April 6, 2009 WESTAR Council.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Mobile Source Committee Update OTC Committee Meeting September 13 th, 2012 Washington, DC 1.
Indiana Energy Conference EPA Clean Power Plan—111(d) November 13, 2014 Thomas W. Easterly, P.E., BCEE, Commissioner IN Department of Environmental Management.
Massachusetts Multi-pollutant Power Plant Regulations Sharon Weber Massachusetts Department of Environmental Protection EPA Utility MACT Working Group.
1 WRAP Oil & Gas Phase II Work Plan: 2002 and 2018 Area Source Inventory Improvements and Area Source Controls Evaluation WRAP Stationary Sources Forum.
2014 Program Priorities January 23, Outline Major 2014 Goals 2013 Accomplishments Major 2014 Activities Partnerships 2.
June 26, Background of Federal GHG Regulation Supreme Court determines greenhouse gases (GHGs) are “air pollutants” under the Clean Air Act U.S.
ICI Boilers EPA Meeting November 21, Why control ICI boilers? Important source of SO 2 and NO x emissions Cost-effective emission reductions achievable.
1. Stationary and Area Sources Committee Recommendations OTC Annual Meeting 2010 Baltimore, MD 2.
Brad Miller Anna Kelley. National Ambient Air Quality Standard Update New Sulfur Dioxide Non-Attainment Area – Effective October 4, 2013 Ozone Secondary.
Stationary and Area Source Committee Recommendations for Control Strategies Presented by Ali Mirzakhalili Delaware Department of Natural Resources and.
California Public Utilities Commission CPUC Climate Change Activities Paul Clanon Executive Director August 28, 2007 Presentation to the Senate Energy,
Item #11 Alternative Approaches for Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital.
Putting the Pieces Together OTC Fall Meeting November 2-3, 2005 Planning to Meet the SIP Submittal Deadlines.
FINAL CLEAN POWER PLAN Before the Virginia Energy Efficiency Council Virginia Department of Environmental Quality November 12, 2015.
Template Summary of FY12-13 Work Plan Technical Activities Sue Kemball-Cook and Greg Yarwood NETAC Policy Committee Meeting April 22, 2014.
July 21, Today’s Proposed Action Approve ozone SIP revisions for South Coast and San Joaquin Valley Reasonable Further Progress Transportation.
The West is different August 14, 2013 OAQPS. Aerosols causing Worst Visibility Days – East vs. West 2.
Clean Air Act Section 111 WESTAR Meeting Presented by Lisa Conner U.S. Environmental Protection Agency Office of Air and Radiation November 6, 2013.
SO 2 NAAQS Modeling MassCAIR Stakeholder Meeting December 13, 2011.
EMISSIONS INVENTORY UPDATE Briefing for OTC Committees and Stakeholder Meeting September 13, 2012 Washington, DC Julie McDill & Susan Wierman 1.
Strategic Plan Development Status Technical Analysis Forum meeting October 11, 2007.
OTC Control Strategy Committee Meeting Tad Aburn, Chair, Multi-P Workgroup October 5, 2005 The OTC Multipollutant Model Rule.
CITIZENS ADVISORY COMMITTEE SPRING MEETING MARCH 1—2, 2012 CHARLOTTESVILLE, VA EPA’s Evaluation of Bay Jurisdictions’ Draft Phase II WIPs & Final
Steve Page Office Director, OAQPS NACAA Spring Meeting 2010
CBP Biennial Strategy Review System
NSPS Rulemakings for Greenhouse Gas Emissions
Consideration of Final Rulemaking
CAIR Replacement Rule and Regional Haze
CBP Biennial Strategy Review System ~Meetings Detail~ DRAFT August 29, /6/2018 DRAFT.
CBP Biennial Strategy Review System
EPA Office of Air Quality Planning and Standards
Finance & Planning Committee of the San Francisco Health Commission
Western Regional Haze Planning and
Best Available Control Technology for Greenhouse Gas Emissions Sources
Stationary Sources Joint Forum: Next Steps
Status of Preliminary Reasonable Progress Analysis
Presentation transcript:

Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1

The Charge to the Committee At the June 2012 Annual Meeting, the Commission charged the SAS Committee with continuing the development of the following control measures: – Coal Fired Boilers Serving EGUs – Industrial, Commercial, Institutional (ICI) Boilers – Demand Response – Municipal Waste Incinerators – Vapor Controls at Gasoline Service Stations – Energy Efficiency Strategies – Natural Gas Compressor Facilities 2

Today’s Presentation Committee focus – What we have been doing Updates on measures still under development – Coal Fired Boilers, ICI Boilers, Demand Response, Municipal Waste Incinerators, Vapor Controls Measures completed or near completion – Energy Efficiency Strategies, Oil and Gas Sector Moving forward – Next Steps for the SAS Committee 3

Committee Focus Research and data collection Economic analysis Stakeholder outreach Collaboration with other states on issues Completing action on remaining measures Revisiting and updating adopted measures Analyzing EPA proposals Discussing adoption and implementation issues Identifying new candidate measures 4

Measures Still Under Development Industrial, Commercial and Institutional (ICI) Boilers – Need to build on recommendation made to EPA. Coal Fired Boilers Serving EGUs – Evaluating CSAPR and the impacts of the court ruling; – Need to focus on NOx. Demand Response – Submitted comments to EPA concerning the proposed amendment to the RICE NESHAP; – Need to gather more information. 5

Measures Still Under Development Municipal Waste Incinerators – Goal was to coordinate with EPA action; – EPA MACT delayed; – No progress made to date. Vapor Controls from Gas Stations – Collected and shared current control equipment cost and benefits information; – Reviewed, discussed and commented on EPA’s draft rule for widespread use and Stage II waiver, now final; – Reviewed, discussed and commented on EPA’s Guidance document on removing Stage II from SIP’s, now final; – Considering other potential emissions not addressed through the Stage II transition. – Evaluating studies done by CT, MA & MD. 6

Measures Nearing Completion Energy Efficiency Strategies – Focus on commercial building retrofits; – Energy utilization data collection feasibility on state level; – Financing of innovative technologies; – Standards based on actual field data for energy consumption in buildings; 7

Energy Efficiency Status Report Energy efficiency status report incorporates stakeholder comments received – To be released this fall; – Building energy efficiency program has the potential to reduce 39,000 tons of NOx per year. 8

Energy Efficiency Strategies Energy efficiency provides three fold increase in effectiveness compared to emission control strategies – EPA finalizing tools to estimate SIP credit from energy efficiency strategies; – Coordinated effort by states produces greatest SIP creditable reduction in NOx emissions 9

Measures Nearing Completion Oil and Gas Sector – Released draft Technical Support document for public comment in March 2012; – Conducted extensive stakeholder outreach and calls; – Incorporating stakeholder comments; – Plan to finalize the TSD in November. 10

Measure Development Process Moving Forward  Complete efforts on Oil & Gas Sector and Energy Efficiency by November;  Continue with Vapor Recovery workgroup efforts:  Additional sector specific calls with stakeholders;  Consider options for possible action  Update measure as needed;  Re-evaluate approach for MWI, ICI Boilers and EGUs;  Prioritize activities to address Demand Response. 11

Develop a workplan to conduct an economic impact assessment of a selected control measure (e.g. ICI Boilers)in order to document the level effort, knowledge, training and tools that are necessary for such assessment. We need to present the workplan to the Air Directors in October and to the Commission in November. 12 Next Steps for the Committee

Evaluate “Demand Response” to determine the extent of distributed generation in the member states and upwind states. For OTR’s fleet of HEDD units, evaluate the startup/shutdown emissions to evaluate the hourly HEDD loading due to startup and shutdown and its potential impact on air quality. If the impact is significant, explore alternatives or means to reduce that impact. 13

Next Steps for the Committee Review and evaluate EGU operating emissions data to evaluate the real world achievable NOx emission rates across load ranges, the effect of time/total operation on the effectiveness of controls, and variations due to fuels. Then utilize the data to adjust long term expectations for emissions reductions dependent upon controls/age/fuel. Develop a state by state EGU NOx emission rate achievable considering RACT. 14

Next Steps for the Committee Review the latest emissions inventory data within OTR and within states that significantly impact OTR, identify the largest source categories (such as by SCC code or other), evaluate for reduction potentials, and make recommendations for further actions (if any). As a subtask, identify source categories with high emissions per emitting unit (would potentially address source categories with an overall low total emissions due to a small number of sources, but with high per-unit emissions). As a subtask, also perform the evaluations on an ozone season basis. A benefit of a review of this type is that the initial evaluation of the data will likely identify other areas that require additional review to attain a reasonable understanding of the data. In other words, we may need to learn more to know what to look for. 15

Next Steps for the Committee A programmatic review of the existing model rules for potential updates due to improved control technologies, better data/information resources, etc. Included in the review process should be an assessment of the potential to expand the applicability (such as for smaller size units) and an assessment of incremental cost effectiveness of potential further reductions. Update any support documentation. 16

Ongoing Committee Work  Coordinate with Modeling Committee by providing emissions input, and emission reduction estimates;  Develop economic analysis tools;  Continue to track rule adoption efforts and provide technical support and a forum for collaboration;  Continue evaluation of and comments on EPA proposals;  Prepare for OTC meetings. 17

Questions? 18