Renewable Generation Interconnection Ken Brunkenhoefer Distributed Generation Consultant

Slides:



Advertisements
Similar presentations
Distributed Generation (DG)
Advertisements

Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
Advancing Renewables in the Midwest March 28, Energy Policy Act Provisions By Warren Wood, PE Director, Utility Operations Division Missouri.
Net Metering and Interconnection Stakeholder Discussion Net Metering and Interconnection Stakeholder Meeting September 21, 2012 Discussion of.
IEPR Staff Workshop – ZNE Buildings
Net Metering and Interconnection A Policy Perspective Brad Klein Staff Attorney Envt’l Law & Policy Center March 28, 2007.
BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
PowerPoint ® Presentation Chapter 12 Utility Interconnection Distributed Generation Generators Inverters Interconnection Codes and Standards Interconnection.
Welcome and Introductions CoServ Presentation & Member Input.
Small Renewable Net Metering - An Investor Owned Utility Perspective John R. Grimwade Senior Director Strategic Planning & Development Presentation to.
PRACTICAL ASPECTS OF CUSTOMER OWNED GENERATION A DISCUSSION OF INTERCONNECTION POLICIES, METERING STRATEGIES AND BILLING CONSIDERATIONS IMUA ANNUAL CONFERENCE.
Small Farm Profitability: Is Wind Energy the Answer? 1
Consideration of Public Utilities Regulatory Policies Act (PURPA) Standards A Public Hearing- October 22, 2007.
Interpreting HB 3693 Interstate Renewable Energy Council presentation to the ERCOT Distribute Generation Task Force December 4, 2007.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
Interconnection of Small Wind & Solar Systems to Distribution Utilities: A Cooperative Perspective Patrick Parke Midwest Energy Hays, KS September 26,
Creating A Cleaner Energy Future For the Commonwealth Focusing on Solar PV: Technology, Siting Considerations, Incentives Natalie Andrews Renewable Energy.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures
1 LSE Certification Process ERCOT August 23, 2006.
California’s Renewable Energy Credits (REC) Market Update
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
1 Distributed Generation SWEDE 2006 CenterPoint Energy Walter R. Bartel, P.E. Supervising Engineer Distribution System Reliability.
Small Renewable Generators Tony Marciano Public Utility Commission of Texas May 2, 2007 (512)
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC 10/09/2003 KENNETH A. DONOHOO, P.E. Manager of System Planning Transmission Services
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
AmerenUE SHOW ME SOLAR June 15, 2010 MISSOURI NET METERING AND SOLAR REBATE PROGRAM Lisa Cosgrove – Renewables Specialist.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
ERCOT MARKET EDUCATION
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
05/18/001 N.Treadway Distributed Resources and Competitive Energy Markets in Illinois Workshop Session III, “Interconnection Issues” Thursday, May 18,
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Southern California Edison SM Southern California Edison Company Proposed AB920 Net Surplus Compensation Rate [NSCR] July 9, 2010.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
Promoting Distributed Generation Resources Through State Initiatives Ed Ethridge Public Utility Commission of Texas Distributed Resources in Restructured.
1 Distributed Renewable Generation Legislation as of 5/02/07  SB 483 by Fraser- Relating to the regulation of electric generation capacity ownership in.
How the Transmission System Works Really William F. Reinke.
RMS Update to TAC October 5, RMS Activity Summary 2008 Test Flight Schedule Update on TAC directive relating to identifying issues with net metering.
Texas Competitive Market & Governance October 4, 2015.
Distributed Generation Registration June 30, 2008.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
YVEA Solar Facts & Distributed Generation Requirements YVSC Talking Green November 17, 2015 Megan Moore-Kemp Key Accounts Rep.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Module 1 From Bundled Utilities to Current Market Design.
Summary Overview: Maryland Straw Man Interconnection Rule Prepared by Brad Johnson* January 11, 2007 ACN Energy Ventures *National.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Retail Metering Working Group Progress Report 08/15/07.
1 RMS Update to RMWG June 6, Market Process for Solar & Wind Devices Retail customers are purchasing and installing wind and solar equipment on.
1 TX SET Update to RMS March 14, Drop to AREP Changes PUCT Project oOne of TX SET 2007 goal is to evaluate approved Rulemakings and determine.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
ERCOT MARKET EDUCATION
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
The Management of Renewable Energy
DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
Net Metering John McComb: P.E.
City Council April 30, 2018 Item 13
EUSERC Training May 2017 Connecting Single phase 3 wire invertor to 3phase 4 wire utility service. Lessons learned - Customer Owned Interconnected Generation.
Net Metering John McComb: P.E.
Presentation transcript:

Renewable Generation Interconnection Ken Brunkenhoefer Distributed Generation Consultant

Oncor Electric Delivery’s goal is to insure the safe and reliable interconnection of distributed resources that connect in parallel to the distribution system. Renewable interconnection process requirements are subject to changing rules and regulations. Potential impacts from multiple facility interconnections or other impact concerns could cause process changes to occur without notice (check periodically for process changes). Disclaimer !

The PUCT in Project adopted requirements for pre- certification of DG equipment by a NRTL including labeling requirements indicating compliance with § and § Pre-certification, as described in this requirement, was never initiated by any market participant. As a result, Oncor Electric Delivery recognizes UL 1741 utility-interactive certified inverters as meeting the intent of the PUCT pre- certification rules and accepts them as being pre-certified. However, Oncor Electric Delivery does not require UL 1741 certification for inverter based systems. Interconnections Utilizing Inverter Based Technology

The Energy Policy Act of 2005 defines Net Metering Service. “Net Metering Service means service to an electric consumer under which electric energy generated by that electric consumer from an eligible on-site generating facility and delivered to the local distribution facilities may be used to offset electric energy provided by the electric utility to the electric consumer during an applicable billing period.” This definition could imply that net metering is accomplished by the use of a single meter which spins forward and backwards allowing offsets. The use of multi-channel metering normally implies that consumption is valued at retail and exporting energy is valued at wholesale pricing. With this assumption “offsets” are not one for one. Customer Information Customer’s of Oncor are provided information giving a general explanation of: 1) how a customer can be paid for exported energy; 2) the process to request Net Metering. Customers are told that if they want to be paid for excess energy ERCOT market model rules apply and their REP needs to specify the type of metering (multi-channel, etc.). This information should be specified in the customers interconnection application.

PUCT rules require that all distributed resources that electrically operate in parallel with the distribution system of the utility must compete and submit an Application for Interconnection with the local distribution utility. (§ and §25.212) PUCT Interconnection Rules --Utility Notification--

Receive and review completed application, one-line diagram and layout sketch Verify pre-certification to UL-1741 Utility Interactive Obtain REP concurrence for Net Metering requests Verify facility metering for Net Metering requests Prepare and secure Interconnection Agreement Basic Steps for Inverter Based Interconnections requesting Net Metering:

Basic Steps for Non-Inverter UL-1741 Based Interconnections Interconnection requests which are not precertified under UL Utility Interactive must follow the standard interconnection rules described in the Public Utility Commission’s Substantive Rule § and §

Renewable Interconnection Requests 1)Completed Application 2) One-line diagram 3) Layout sketch

Control Strategy - 59N Relay Inverter Utility Visible disconnect in close proximity to meter Not a breaker PV panels or Wind Turbine General Loads Utility Meter Inverter Based One-Line Diagram Example Main Service Panel Utility Visible Lockable Disc.

Utility Source Utility Meter Customer Main Breaker Panel Visible lockable (labeled) Disconnect Fence PV Panels Sample Layout Sketch Within ~10 feet Comments: 1) Layout sketch is to show the relationship between the meter and visible disconnect. The goal is to have the visible disconnect located within 10 feet from the meter or within visible sight and in a readily accessible location. 2) The visible lockable disconnect switch is not a breaker. These switches have a visible air gap for a utility lineman to verify the alternate source of power is “open” and should be labeled something like Alternate Power Source Disconnect. Address: Account #:

Negative Meter Readings Oncor customers with REP approved Net Metering have the capability for negative end-of-month meter readings. If end-of-month meter readings are negative (meaning more was exported to the grid than was consumed from the grid) then the monthly consumption reading will be set to zero. Annualized or multi-month net metering is not available meaning that you cannot "bank" excess production in one month and apply it to the consumption of another month.

Private bilateral energy transactions Scheduling Entities Balanced schedules of loads and resources; and information and transactions required to support reliability. Retail Customers ERCOT Bilateral Market Load Serving Entities ERCOT Resources Electricity sellers Electricity buyers Deregulation Model DG sales into the market TDSPs are prohibited from buying or selling energy in the market

ERCOT Market Model

Questions?