Freeways and Multilane Highways CTC-340. HMWK Ch 13 Read Section 13.7 Ch 13 # 2, 3 Ch 14# 1, 4, 5, 6, 8.

Slides:



Advertisements
Similar presentations
Chapter 12: Capacity and Level-of-Service Analysis for Freeways and Multilane Highways Chapter objectives: By the end of these chapters the student will.
Advertisements

Chapter 131 Chapter 13: Fundamental Concepts for Uninterrupted Flow Facilities Explain why capacity is the heart of transportation issues. Define capacity.
Capacity, Level of Service, Intersection Design (1)
Analysis of Heavy Vehicle Effects on Florida Freeways and Multilane Highways using an Advanced Vehicle Performance Modeling Approach by Seckin Ozkul Analysis.
Chapter 14: Basic Freeway Segments and Multilane Highways
Chapter 15: Weaving, Merging, and Diverging Movements on Freeways and Multilane Highways Chapter objectives: By the end of this chapter the student will.
VERTICAL ALIGNMENT Spring 2015.
Transportation Engineering
INTRODUCTION TO TRANSPORT Lecture 3 Introduction to Transport Lecture 4: Traffic Signal.
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
CEE 320 Winter 2006 Freeway & Highway Level of Service CEE 320 Steve Muench.
Critical Length of Grade
Chapter 2 (supplement): Capacity and Level-of-Service Analysis for Freeways and Multilane Highways Objectives of this presentation: By the end of this.
Capacity Analysis CE 453 Lecture #14.
Vehicle Flow.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
Understanding the Virginia Driver’s Manual
SIGHT DISTANCE Spring 2015.
CE 578 Highway Traffic Operations Lecture 4: HCM Directional Analysis.
2 Lane 2 way Rural hwys CTC-340. HMWK CH 16 # 1, 3, 6 use HCS+ software.
CE 578 Highway Traffic Operations Lecture 4: HCM Directional Analysis.
CTC-340 Signals - Basics. Terms & Definitions (review) Cycle - Cycle Length - Interval -. change interval - clearance interval- change + clearance = Yi.
2/27/06Michael Dixon1 CE 578 Highway Traffic Operations Lecture 16: Freeways Basic Sections.
Unsignalized Intersections CTC-340. Hmwk At end of powerpoint.
CEE 320 Fall 2008 Queuing CEE 320 Anne Goodchild.
Lec 15, Ch.8, pp : Signal Timing (Objective)
Chapter 241 Chapter 25: Analysis of Arterial Performance Know how arterial LOS is defined Be able to determine arterial classes Know how to determine arterial.
Chapter 3. Highway Design for Performance
3/1/06Michael Dixon1 CE 578 Highway Traffic Operations Lecture 17: Freeways Basic Sections Application.
CEE 320 Spring 2008 Level of Service and Design Traffic Volumes CEE 320 Kelly Pitera.
Highway Capacity Software (HCS) – Part II
9/23/2009Michael Dixon1 CE 578 Highway Traffic Operations Crawl Regions and Specific Grades HCM 2000.
Highway Capacity Software Based on the Highway Capacity Manual (HCM) Special Report 209 Transportation Research Board (TRB), National Research Council.
Lec 5: Capacity and LOS (Ch. 2, p.74-88)
Design Speed and Design Traffic Concepts
Level of Service Section 4.5. Level of Service: The Basics MMeasure performance by density. RRatio of operating capacity to speed. UUnits: passenger.
CE 578 Highway Traffic Operations Introduction to Freeway Facilities Analysis.
Transportation Engineering
ENGR 340 Wind Energy & Transportation (Part II) Nadia Gkritza CCEE
 Cross section elements consist of the following:  1.Traffic lanes (carriage ways);  2.Shoulders;  3.Medians;  4.Curbs;  5.Side slopes.
Ramps & Weaving.
Traffic Flow Anil Kantak Transportation and Traffic Flow Anil V. Kantak 1.
Lec 17, Ch.9, pp : Capacity of freeway sections (objectives) Understand capacity and level of service are the heart of transportation analyses Understand.
Lec 5: Capacity and Level-of-Service Analysis for Freeways, Multilane Highways & 2-Lane 2-Way Highways (p.2-60 to 2-70) Chapter objectives: By the end.
Freeway Capacity Analysis
Hcm 2010: work zones.
Introduction to Transport
Chapter 13: Weaving, Merging, and Diverging Movements on Freeways and Multilane Highways Chapter objectives: By the end of these chapters the student will.
Geometric Design (I). Learning Objectives To understand the considerations and quantifiable aspects of geometric design.
Vehicle Flow. Homework Ch 3 # 1,4, 7, 15 Vehicle Flow How do vehicles operate in the system –capacity –speed –headway –density.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Problem 4: Okeechobee Road Stopped Control Analysis.
Highway capacity and Level of Service Analysis Dr. Attaullah Shah Transportation Engineering - I.
Intersections.
Hcm 2010: BASIC CONCEPTS praveen edara, ph.d., p.e., PTOE
Freeway Level of Service
Chapter 9 Capacity and Level of Service for Highway Segments
Geometric Design: General Concept CE331 Transportation Engineering.
HCM 2010: FREEWAY FACILITIES PRAVEEN EDARA, PH.D., P.E., PTOE UNIVERSITY OF MISSOURI - COLUMBIA
The New 2010 Highway Capacity Manual An Overview.
Intersections.
Multilane Highway Capacity Analysis
Freeway Capacity and Level of Service
Chapter 3. Highway Design for Performance
Freeway & Highway Level of Service
Freeway & Highway Level of Service
HIGHWAY CAPACITY & LEVEL OF SERVICE (LOS)
Highway Engineering CE 431
SIGHT DISTANCE Spring 2019.
Presentation transcript:

Freeways and Multilane Highways CTC-340

HMWK Ch 13 Read Section 13.7 Ch 13 # 2, 3 Ch 14# 1, 4, 5, 6, 8

Capacity HCM2000 definition –The capacity of a facility is the maximum hourly rate at which persons or vehicles can reasonably be expected to traverse a point on a uniform section of a lane or roadway during a given period of time under prevailing roadway, traffic and control conditions

LOS –Table 13-1 MOEs Service Flow –Max flow for a given LOS v/c ratio – ratio of flow to capacity of facility –Should be <1 –If v/c > 1 => congestion

Freeways Pure uninterrupted flow –Cars enter and exit via ramps –No at grade intersections, driveways etc Based on number of lanes

Multilane Highways Only uninterrupted flow if signals at least 2 miles apart Classified by lanes and median type F 14.1

LOS MOE is density – pc/ln/mi Capacity = 45pc/ln/mi –Freeways –multilane hwys => pc/ln/mi –F 14.2, 14.3, T 14.1 LOS pg

Freeway Analysis F14.2 & 14.3 Operational Analysis How is the existing facility operating v p = V/(PHF*N* f HV * f p ) = pc/hr/ln v p is the demand flow rate under ideal conditions With v p can find FFS from curves F 14.2 f p = user population If V = 4600vph, PHF = 0.90, N =3, f HV =0.87, f p = 1 What is LOS v= 1958pc/h/ln => LOS =? F 14.2 &3

Service Flow Rate & Service Vol Analysis SF i = MSF i *N*f HV *f p –Can find service flow for each LOS i Use Tables 14.3 or 14.4 to get MSF

Design Analysis –Used to determine # of lanes needed for freeway –To determine the number of lanes –N = DDHV/(PHF*MSF*f HV *f p ) –Iterative process –Number of lanes depends on design speed –Design speed depends on # of lanes

Free Flow Speed - Freeways Free Flow Speed –Found when volume < 1000vph/l –FFS = BFFS-f LW - f LC – 3.22TRD^0.84 –f LW – lane width adjustment T14.5 –f LC – lateral clearance T14.6 6’ on right side 2’ on left Factor only takes right side into account –TRD – total ramp density T14.8 Total ramps within 3 miles of midpoint of study area/6miles

Multilane Highways –FFS = BFFS-f LW - f LC - f M – f A –f LW – lane width adjustment T14.5 –f LC – lateral clearance T14.7 –Greatest LC = 6 feet on both sides –Undivided Hwys – no median side clearance – taken into account with f M – assume 6’ clearance –TWLTL – assume 6’ clearance –Divided hwy – based on median, dist to opposing traffic, periodic objects(light poles) never more than 6’ –f M –median type T 14.8 Undivided, TWLTL, divided –f ID – access points T14.9 Driveways or roadways per mile on the right hand side - only include active intersections

Multilane Highways –BFFS – use 60mph if no data available for rural and suburban multilane sites Can estimate speed limit with BFFS 7mph higher than spd limits 40 – 45mph 5mph higher than spd limits 50 – 55mph

Example Old 6 lane freeway – 11’ lanes, barriers on right side 2’ from pavement edge, TRD = 3ramps/mile –FFS = f LW - f LC – 3.22TRD^0.84 –f LW – lane width adjustment T14.5 –f LC – lateral clearance T14.6 2’ on right side 6’ on left Factor only takes right side into account

Example Old 6 lane freeway – 11’ lanes, barriers on right side 2’ from pavement edge, TRD = 3 ramps/mile –FFS = f LW - f LC – 3.22TRD^0.84 –f LW – 1.9 mph T14.5 –f LC – 1.6 mph T14.6 –TRD = 3 FFS = 75.4 – 1.9 – 1.6 – 3.22*3^.84= 64.1

Example 4 lane suburban multilane highway – 12’ lanes, barriers on right side 2’ from pavement edge, TWLTL, 30 access points/mile posted spd lmt = 50 mph –FFS = BFFS-f LW - f LC - f M – f A –f LW – 0.0 mph T14.5 –f LC – 0.9 mph T14.7 total LC = 6+2 = 8’ –f M –0.0 mph T 14.8 –f ID – 7.5 mph T14.9 FFS = 55 – 0 – 0.9 – 0 – 7.5 = mph mph for BFFS

Heavy Vehicle Factor Heavy Vehicle = any vehicle with more than 4 tires –Trucks and buses Have similar characteristics Based on a typical mix of trucks 150#/hp –RVs Privately owned, self contained or pulled #/hp

Passenger Car Equivalents # of cars displaced by the heavy vehicle E T = PCE for trucks and buses E R = PCE for RVs Increases volume to account for HVs EX: 1000 vehicles 10% trucks, 2% RV –E T = 2.5 E R = 2.0

1000 * 0.1*2.5 = 250pce/hr 1000*0.02*2 = 40 pce/hr 1000*0.88 = 880 pce/hr Total pce = 1170 pce/hr –Traffic stream acts like it has 1170 vph on it –f HV = vph/(pce/hr) always <= 1.0 –f HV = 1000/1170 = 0.85

f HV = 1/(1+P T (E T – 1) +P R (E R – 1)) Extended Freeway & Multilane Sections –Long section = single section where no grade of 3% or greater is longer than 0.25 miles and if no grade of less than 3% is longer than 0.5 miles

Terrain Level terrain – short grades less than 2% –HVs can maintain same speed as cars Rolling terrain - HV speed substantially below pc speeds but do not get to crawl speed for extended periods Mountainous terrain – HV operate at crawl speed for extended periods or frequently –Rare –T14.11

Specific Grades Any grade 3% and longer than 0.25 mile is a specific grade T14.12, T14.13 Trucks on Downgrades T14.14 –RVs same as level sections

Composite Grades Series of grades –Want to get the equivalent uniform grade for pce –Average grade technique Find total rise divide by total run Good when all grades <4% and < 4000ft length –Composite grade technique Use truck performance curves to determine equivalent length of grade

Driver Population factor Based on the number of drivers not familiar with the road. –Range from 1 – 0.85 –Usually use 1 unless a field study has been done or it is a highly recreational area