Site development issues, focusing on site acquisition Douglas Bock See also: Stephen’s “Visual Tour of the OVRO site” FASR Planning Meeting, AUI, August.

Slides:



Advertisements
Similar presentations
Monterey Peninsula Water Management District 1 Provide Policy Direction on Scope of ASR EIR Item 16 March 21, 2005 Regular Meeting Staff Contact: Henrietta.
Advertisements

Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
Presented to: 2010 Airports Conference By: Sue McDonald With slides by Tom Klin, CH2M HILL Date: March 3, 2010 Federal Aviation Administration Cumulative.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
The Role of State, Local and Tribal Governments in the Federal NEPA Process Presented by Susan E. Bromm Director, Office of Federal Activities United States.
Environmental Impact Statement Process Development Services Department Carol Helland, Land Use Director/SEPA Official (DSD) David Pyle, Senior Land Use.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Environmental Justice: Policies, Guidance, and Answers to Frequently Asked Questions FTA Region VII Civil Rights Training.
Environmental Impact Assessment Review Process for Oil and Gas Projects In Saskatchewan Larry Lechner, P. Eng. Director Environmental Assessment Branch.
Connecticut Department of Transportation Bureau of Policy & Planning.
1 State Water Resources Control Board Environmental Review for State Bond Funded Grant Projects Presented by Lisa Lee, Environmental Review Unit.
I n t e g r a t I n g C S S Practitioner Module 3 Module 3: CSS and Livability In Area Wide Planning.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Environmental Impact Assessment (EIA): Overview
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
Mitigation in the Section 106 Process Dave Berwick Army Program Manager Advisory Council on Historic Preservation.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Monterey Peninsula Water Management District 1 Confirm Scope of Work and Description for MPWMD ASR Project Item 13 April 18, 2005 Regular Meeting Staff.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
LOS OSOS WASTEWATER PROJECT UPDATE March 4, 2008.
Uniform Rules Update Revised Draft EIR Environmental Comment Hearing Revised Cumulative Impact Analysis 04EIR-08 SCH# County of Santa Barbara.
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
Local Agency Programs An Overview Gonzalo Puente, PE Shaun Bates, PE Development Engineer Project Manager.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
CEQA and the Delta Plan Presentation to Delta Stewardship Council February 24, 2011.
The Role of NEPA Leasing and Mineral Rights Sales Subject to Environmental Use and Planning Provisions –The National Environmetal Policy Act of 1969 requires.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
National Environmental Policy Act An established US national policy Draft Year: 1969 Amendment Years: Section amended May 27, 1986 “Environmental.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Butte County Climate Action Plan Contract for Services December 11, 2012 Butte County Department of Development Services Tim Snellings, Director.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Scoping Meeting April 20th 6:00 pm
Overview What is the CEQA environmental review process?
Fifth Standard Solar Project Complex
National Environmental Policy Act of 1969 (NEPA)
SEQRA as a Tool to Review Energy Projects
National Environmental Policy Act (NEPA)
National Environmental Policy Act of 1969 (NEPA)
Unit 6 NEPA.
Consultation (C) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major.
National Environmental Policy Act of 1969 (NEPA)
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Brackish Water Desalination Project
Environmental Requirements and planning grants
Strategic Appropriate Assessment of Spatial Plans
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

Site development issues, focusing on site acquisition Douglas Bock See also: Stephen’s “Visual Tour of the OVRO site” FASR Planning Meeting, AUI, August 16-17, 2007

OVRO site (not focusing on site comparables) Current staffing ~30: site and instrument maintenance, engineering, including high-level (PhD) Existing building partially vacated by OVRO can possible be used for FASR Construction & access relatively easy, some road improvements needed. Site acquisition is the main issue for now

Lease Current OVRO lease expires in 2013 Prototyping and early test array would be on existing lease, with permission for construction from DWP (informed by CEQA analysis) Expect to renew lease (expanded area for FASR) for 25 years in 2010 or 2011 Renewal of this lease (by DWP board/LA council) is the action that is informed by main CEQA document

Environmental Analysis Purpose is to inform decision-making by federal and state agencies Local governments often represent state in California Environmental documents can be joint state/federal or separate, but typically rely on one set of surveys (need to get survey requirements in place early). It is likely that the project (using consultants) would prepare & fund the state document under the direction of DWP. Federal analog unclear (to me!)

Terminology National Environmental Policy Act (federal) California Environmental Quality Act (state) More detailed analysis; potential for significant impacts Environmental Impact Statement (EIS) Environmental Impact Report (EIR) Environmental Assessment (EA) -> FONSI or EIS Mitigated Negative Declaration No significant impactCategorical ExclusionNegative Declaration

Case study I - Allen Telescope Array (ATA) Lead state agency: UC Berkeley Lead federal agency: Forest Service EA and separate Mitigated Negative Declaration (main text similar in the two documents) Expansion of existing site Main issues: –Sensitive plants and animals (avoided in configuration design) –Visual (mitigated by sand-blasting of antenna surfaces) Timeline –Original application for Special Use Permit late 1999; moved slowly until… –Public scoping Aug 2002 –EA Dec 2002; Mit. Neg.Dec. Feb 2003 –Project approval *** tbc (Sep 2003) Cost ~ $100k + ~0.5 work-year staff

Case Study II: CARMA Lead State agency: UC Berkeley Lead Federal agency: Forest Service Joint EIS/EIR New site Main issues –Weeds/botanical –Impact to traditional tribal lands Timeline: –Earliest siting discussions 1996 –Candidate sites identified *** tbc (2002?) –Public scoping ***tba –Draft EIS/EIR March 2003 –Final EIS/EIR Oct 2003 –Approval May 2004 Cost $1.2m ( ) + several work-years staff

FASR Project scope (from environmental perspective) much more like ATA Lead State agency: probably LA DWP (UC would be guided by DWP analysis should it determine its decision has any impact) Lead Federal agency: NSF? Expansion of existing site Main issues: –Visual (mitigate in configuration design and by painting, etc) –Likely biological/archaeological areas of concern can probably be avoided (no obvious site-wide issues) –Others? Public scoping…

Strategy Local DWP staff supportive so far General community expected to be supportive if access is maintained Avoid localized impacts in configuration design Mitigate visual impacts in antenna design Brief DWP HQ and County at time of request for first local installation (pref. 1 yr in advance) Engage community so that they understand local and global benefits of the project, and likely mitigations to their concerns. Start to learn of any new concerns at this time Get going early on surveys (biological/archaeological, especially if DWP has information on existing concerns). Start full project NEPA/CEQA analysis well in advance (at least 2 yrs).