7-March-07 ILC-fest Fermilab Global Design Effort 1 International Linear Collider Barry Barish 7-March-07.

Slides:



Advertisements
Similar presentations
The Importance of ILC Communications Barry Barish Communications Workshop VLCW06 17-July-06.
Advertisements

Report from the GDE director Barry Barish Snowmass 14-Aug-05.
Future Directions in Experimental Nuclear and Particle Physics Barry Barish Bacher Symposium Caltech 5-Nov-05 Bacher at the Caltech Synchrotron Robert.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Personal Perspectives on the ITRP Recommendation and on the Next Steps Toward the International Linear Collider Barry Barish PAC Annual Meeting Knoxville,
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Strategies for Future Acclerators Barry Barish Elba 23-May-06.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
The International Linear Collider Barry Barish Caltech 5-Jan-06.
GDE expectations from the SRF community Barry Barish Cornell SRF Mtg 15-July-05.
The International Linear Collider Barry Barish Caltech 5-Jan-06.
GDE Meeting B Barish 16-Aug-05 The GDE – who, what and how? The BCD – what is it? Internal Organization toward BCD What do we want out of Snowmass? How.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
1-Dec-06 HEPAP Univ. Subpanel Global Design Effort 1 ILC Report Barry Barish Caltech / GDE 1-Dec-06 RDR Design Freeze.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
2-Oct-06University of Bologna1 The Future of Particle Physics The Case for Building another Huge Particle Accelerator Barry Barish CALTECH 2-Oct-06.
The Path Toward a Linear Collider Barry Barish HEP 2005 Lisbon, Portugal 23-July-05.
The ILC Global Design Effort Barry Barish EPP2010 Cornell University 2-Aug-05.
14-Dec-06 RDR Internal Cost Review Global Design Effort 1 GDE Internal Review ILC Reference Design Costing Barry Barish Caltech / GDE 14-Dec-06.
The International Linear Collider Barry Barish iThemba Cape Town 21-Oct-05.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
The International Linear Collider Barry Barish IUPAP General Assembly Cape Town 26-Oct-05.
Technology Breakthroughs and International Linear Collider Barry Barish AAAS Annual Meeting Washington DC 19-Feb-05.
20-Jan-09 Madrid, Spain Global Design Effort 1 Barry Barish Madrid, Spain 20-Jan-09 Designing the ILC ATF-2 Final Doublet System.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Towards an International Linear Collider Barry Barish GDE 6-June-07.
Towards an International Linear Collider Barry Barish Caltech / GDE 25-July-07.
FZÚ, J. Cvach, LCWS051 LCWS 05 1.LHC a ILC 2.Top 3.Higgs 4.Polarizace.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
The International Linear Collider and the Future of Accelerator-based Particle Physics Barry Barish Caltech Lomonosov Conference 20-Aug-2015 ILC.
1-Feb-08 P5 Global Design Effort 1 GDE - ILC Barry Barish P5 Meeting - Fermilab 1-Feb-08.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Accelerators in our Future ILC and Beyond Barry Barish Caltech Neutrino Telescope - Venice 13-March-09.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Alors, c’est fini! Et maintenant?. Machine Upgrade in Stages Push LHC performance without new hardware –luminosity →2.3x10 34 cm -2 s -1, E b =7→7.54.
25-Sept-07 P5 Fermilab Global Design Effort 1 Report from GDE Barry Barish Caltech / GDE 25-Sept-07.
04-Feb-07 GDE/ACFA Intro Beijing Global Design Effort 1 GDE Status Barry Barish 4-Feb-07.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
OLAV-III 1 Barry Barish OLAV-III Oak Ridge National Laboratory 12-July-11 The International Linear Collider A TeV Scale Lepton Collider 12-Julyl-11.
The International Linear Collider Barry Barish ANL Colloquium 3-Jan-06.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
ILC Global Design Effort Barry Barish GDE 9-March-06.
28-Jan-08 SiD Workshop Global Design Effort 1 ILC Status Impacts of US/UK Budget Actions Replan for GDE Technical Design Phase Barry Barish SiD Workshop.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
Barry C Barish – Caltech Tohoku Forum for Creativity Particle Physics and Cosmology after the discovery of the Higgs Boson October 2013 The Future.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Past Present Future The High Energy Frontier R.-D. Heuer, CERN Joint EPS-ECFA meeting, July 18, 2009.
Future Colliders Gordon Watts University of Washington/Seattle APS NW Meeting May 12-14, 2016.
1 Gamma Gamma Collider Physics Report Tim Barklow SLAC Apr 18, 2009.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
ILC - Upgrades Nick Walker – 100th meeting
SC Quadrupole Magnets in ILC Cryomodules
ILC Global Design Effort
Barry Barish GDE Caltech
The International Linear Collider
Yasuhiro Okada, Executive Director, KEK
Explanation of the Basic Principles and Goals
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

7-March-07 ILC-fest Fermilab Global Design Effort 1 International Linear Collider Barry Barish 7-March-07

7-March-07 ILC-fest Fermilab Global Design Effort 2 Introduction to the ILC Terascale science and how the ILC will complement the LHC? Why linear? What technology to employ? Designing the ILC -- a new paradigm in international collaboration. A thumbnail description of the ILC Reference Design and Cost? The path forward

7-March-07 ILC-fest Fermilab Global Design Effort 3 Exploring the Terascale the tools The LHC –It will lead the way and has large reach –Quark-quark, quark-gluon and gluon-gluon collisions at TeV –Broadband initial state The ILC –A second view with high precision –Electron-positron collisions with fixed energies, adjustable between 0.1 and 1.0 TeV –Well defined initial state Together, these are our tools for the terascale

7-March-07 ILC-fest Fermilab Global Design Effort 4 Electron-Positron Colliders Bruno Touschek built the first successful electron-positron collider at Frascati, Italy (1960) Eventually, went up to 3 GeV ADA

7-March-07 ILC-fest Fermilab Global Design Effort 5 But, not quite enough energy …. Discovery Of Charm Particles and 3.1 GeV Burt Richter Nobel Prize SPEAR at SLAC

7-March-07 ILC-fest Fermilab Global Design Effort 6 The rich history for e + e - continued as higher energies were achieved … DESY PETRA Collider

7-March-07 ILC-fest Fermilab Global Design Effort 7 And also at LEP, where the stage has been set for the terascale What causes mass?? The mechanism – Higgs or alternative appears around the corner

7-March-07 ILC-fest Fermilab Global Design Effort 8 Three Generations of e + e - Colliders The Energy Frontier Fourth Generation? SPEAR PETRA LEP ENERGY YEAR TeV ILC GeV

7-March-07 ILC-fest Fermilab Global Design Effort 9 Why e + e - Collisions? elementary particles well-defined –energy, –angular momentum uses full COM energy produces particles democratically can mostly fully reconstruct events

7-March-07 ILC-fest Fermilab Global Design Effort 10 LHC: Low mass Higgs: H    M H < 150 GeV/c 2  Rare decay channel: BR~10 -3  Requires excellent electromagnetic calorimeter performance  acceptance, energy and angle resolution,  g/jet and g/p 0 separation  Motivation for LAr/PbWO 4 calorimeters for CMS  Resolution at 100 GeV:  1 GeV  Background large: S/B  1:20, but can estimate from non signal areas CMS

7-March-07 ILC-fest Fermilab Global Design Effort 11 ILC: Precision Higgs physics  Model-independent Studies mass absolute branching ratios total width spin top Yukawa coupling self coupling  Precision Measurements Garcia-Abia et al

7-March-07 ILC-fest Fermilab Global Design Effort 12 The linear collider will measure the spin of any Higgs it can produce by measuring the energy dependence from threshold Is it really the Higgs ? Measure the quantum numbers. The Higgs must have spin zero !

7-March-07 ILC-fest Fermilab Global Design Effort 13 Higgs Couplings at the ILC Mass (GeV) Higgs Coupling strength is proportional to Mass

7-March-07 ILC-fest Fermilab Global Design Effort 14 e + e - : Studying the Higgs determine the underlying model SM 2HDM/MSSM Yamashita et al Zivkovic et al

7-March-07 ILC-fest Fermilab Global Design Effort 15 More ILC Terascale Physics The Top Quark (precision top physics) Supersymmetry (Do quarks and leptons unify?)

7-March-07 ILC-fest Fermilab Global Design Effort 16 More ILC Terascale Physics Extra Dimensions (how many dimensions in nature) Dark Matter (comparable sensitivity to direct searches – determine mass and coupling of LSP) Linear collider

7-March-07 ILC-fest Fermilab Global Design Effort 17 –  E ~ (E 4 /m 4 R) – Cost ~ a R + b  E ~ a R + b (E 4 /m 4 R) – Optimization : R ~ E 2  Cost ~ c E 2 Circular Machine Why Linear? cost Energy Circular Collider Linear Collider –Cost (linear) ~ a L –where L ~ E R m,E Synchrotron Radiation R ~ 200 GeV

7-March-07 ILC-fest Fermilab Global Design Effort 18 How the physics defines the ILC

7-March-07 ILC-fest Fermilab Global Design Effort 19 Parameters for the ILC E cm adjustable from 200 – 500 GeV Luminosity  ∫ Ldt = 500 fb -1 in 4 years Ability to scan between 200 and 500 GeV Energy stability and precision below 0.1% Electron polarization of at least 80% The machine must be upgradeable to 1 TeV

7-March-07 ILC-fest Fermilab Global Design Effort 20 ILC – Underlying Technology Room temperature copper structures OR Superconducting RF cavities

7-March-07 ILC-fest Fermilab Global Design Effort 21 SCRF Technology Recommendation The recommendation of ITRP was presented to ILCSC & ICFA on August 19, 2004 in a joint meeting in Beijing. ICFA unanimously endorsed the ITRP’s recommendation on August 20, 2004

7-March-07 ILC-fest Fermilab Global Design Effort 22 Superconducting RF Technology Forward looking technology for the next generation of particle accelerators: particle physics; nuclear physics; materials; medicine The ILC R&D is leading the way Superconducting RF technology –high gradients; low noise; precision optics

7-March-07 ILC-fest Fermilab Global Design Effort 23 The Community Self-Organized Nov 13-15, 2004

7-March-07 ILC-fest Fermilab Global Design Effort 24 GDE Began at Snowmass 670 Scientists attended two week workshop at Snowmass GDE Members Americas 22 Europe 24 Asia 16

7-March-07 ILC-fest Fermilab Global Design Effort 25 Global Design Effort –The Mission of the GDE Produce a design for the ILC that includes a detailed design concept, performance assessments, reliable international costing, an industrialization plan, siting analysis, as well as detector concepts and scope. Coordinate worldwide prioritized proposal driven R & D efforts (to demonstrate and improve the performance, reduce the costs, attain the required reliability, etc.)

7-March-07 ILC-fest Fermilab Global Design Effort 26 GDE -- Designing a Linear Collider Superconducting RF Main Linac

7-March-07 ILC-fest Fermilab Global Design Effort 27 Luminosity & Beam Size f rep * n b tends to be low in a linear collider Achieve luminosity with spot size and bunch charge

7-March-07 ILC-fest Fermilab Global Design Effort 28 Low emittance machine optics Contain emittance growth Squeeze the beam as small as possible Achieving High Luminosity ~ 5 nm Interaction Point (IP) e-e- e+e+

7-March-07 ILC-fest Fermilab Global Design Effort 29 Parametric Approach A working space - optimize machine for cost/performance

7-March-07 ILC-fest Fermilab Global Design Effort 30 The Baseline Machine (500GeV) not to scale ~31 km RTML ~1.6km 20mr 2mr BDS 5km ML ~10km (G = 31.5MV/m) x2 e+ 150 GeV (~1.2km) R = 955m E = 5 GeV January 2006

7-March-07 ILC-fest Fermilab Global Design Effort 31 ILC --- Deep Underground

7-March-07 ILC-fest Fermilab Global Design Effort 32 –Three RF/cable penetrations every rf unit –Safety crossovers every 500 m –34 kV power distribution Main Linac Double Tunnel

7-March-07 ILC-fest Fermilab Global Design Effort 33 Superconducting RF Cryomodule

7-March-07 ILC-fest Fermilab Global Design Effort 34 RDR Cost Estimating “Value” Costing System: International costing for International Project –Provides basic agreed to “value” costs –Provides estimate of “explicit” labor (man-hr)] Based on a call for world-wide tender: lowest reasonable price for required quality Classes of items in cost estimate: –Site-Specific: separate estimate for each sample site –Conventional: global capability (single world est.) –High Tech: cavities, cryomodules (regional estimates)

7-March-07 ILC-fest Fermilab Global Design Effort 35 Area RDR MBCCRCCB approx.  $ BDS 2  14mr IRs supported14yes~170 M$ Single IR with push-pull detectorsupported23yes~200 M$ Removal of 2nd muon wallsupported16yes~40 M$ MLRemoval of service tunnelrejected ~150 M$ RF unit modifications (24 ® 26 cav/klys)supported 20yes ~50 M$ Reduced static cryo overheadsupported ~150 M$ Removal linac RF overheadsupported ~20 M$ Adoption of Marx modulator (alternate)rejected ~180 M$ RTMLSingle-stage bunch compressorrejected ~80 M$ Miscellaneous cost reduction modificationssupported19yes~150 M$ SourcesConventional e+ sourcerejected <100M$ Single e+ targetsupportedin prep ~30 M$ e- source common pre-acceleratorsupported22yes~50 M$ DRSingle e+ ringsupported15yes~160 M$ Reduced RF in DR (6 ® 9mm  z ) supportedin prep ~40 M$ DR consolidated lattice (CFS)supportedin prep ~50 M$ GeneralCentral injector complexsupported18(19) yes ~180 M$ Cost-Driven Design Changes

7-March-07 ILC-fest Fermilab Global Design Effort 36 The Evolving Baseline Baseline Configuration Removal of second e+ ring ~31 km not to scale

7-March-07 ILC-fest Fermilab Global Design Effort 37 Damping Ring Baseline Configuration ~31 km Removal of second e+ ring simulations of effect of clearing electrodes on Electron Cloud instability suggests that a single e+ ring will be sufficient not to scale The Evolving Baseline

7-March-07 ILC-fest Fermilab Global Design Effort 38 Baseline Configuration ~31 km Centralised injectors Place both e+ and e- ring in single centralized tunnel not to scale The Evolving Baseline

7-March-07 ILC-fest Fermilab Global Design Effort 39 Baseline Configuration ~31 km Centralised injectors Place both e+ and e- ring in single centralized tunnel Adjust timing (remove timing insert in e+ linac) not to scale The Evolving Baseline

7-March-07 ILC-fest Fermilab Global Design Effort 40 Baseline Configuration ~30 km Centralised injectors Place both e+ and e- ring in single centralized tunnel Adjust timing (remove timing insert in e+ linac) Remove BDS e+ bypass not to scale The Evolving Baseline

7-March-07 ILC-fest Fermilab Global Design Effort 41 Baseline Configuration ~30 km Centralised injectors Place both e+ and e- ring in single centralized tunnel Adjust timing (remove timing insert in e+ linac) Remove BDS e+ bypass Long 5GeV low-emittance transport lines now required not to scale The Evolving Baseline

7-March-07 ILC-fest Fermilab Global Design Effort 42 Single IR with Push-Pull Detector Baseline Configuration ~30 km not to scale Final RDR baseline The Evolving Baseline

7-March-07 ILC-fest Fermilab Global Design Effort 43 Evolving Design  Cost Reductions Some possible cost reductions (e.g. single tunnel, half RF, value engineering) deferred to the engineering phase July 2006

7-March-07 ILC-fest Fermilab Global Design Effort 44 RDR Design & “Value” Costs Summary RDR “Value” Costs Total Value Cost (FY07) 4.87B ILC Units - Shared B ILC Units - Site Specific K person-years (“explicit” labor = 22.2 M 1,700 hrs/yr) For this estimate 1 ILC Unit = 1 US 2007$ (= 0.83 Euro = 117 Yen) The reference design was “frozen” as of 1-Dec-06 for the purpose of producing the RDR, including costs. It is important to recognize this is a snapshot and the design will continue to evolve, due to results of the R&D, accelerator studies and value engineering

7-March-07 ILC-fest Fermilab Global Design Effort 45 ILC Reference Design and Plan Producing Cavities Cavity Shape Obtaining Gradient

7-March-07 ILC-fest Fermilab Global Design Effort 46 ILC Reference Design and Plan Making Positrons 6km Damping Ring 10MW Klystrons Beam Delivery and Interaction Point

7-March-07 ILC-fest Fermilab Global Design Effort 47 ILC Reference Design and Plan ILC Reference Design Technical Discussion Marc Ross Wine & Cheese Seminar Friday March 9.

7-March-07 ILC-fest Fermilab Global Design Effort 48 Final Reflections We have come a long way, and the connecting theme has been a strong physics case, coupled with the development of a coherent concept for the accelerator and the R&D technology demonstrations

7-March-07 ILC-fest Fermilab Global Design Effort 49 March 2005 I accepted GDE job Feb 2007 Reference Design Presented to ICFA/ILCSC

7-March-07 ILC-fest Fermilab Global Design Effort 50 Final Reflections We have come a long way, and the connecting theme has been a strong physics case, coupled with the development of a coherent concept for the accelerator and the R&D technology demonstrations This provides a strong base for the future, but there are many hurdles ahead: costs, LHC results, international management, determining a host and site, funding,. Many things will converge in about 2010 and we want to be ready with the strongest construction proposal possible on that time scale.

7-March-07 ILC-fest Fermilab Global Design Effort 51 The GDE Plan and Schedule Global Design EffortProject Baseline configuration Reference Design ILC R&D Program Engineering Design Expression of Interest to Host International Mgmt LHC Physics CLIC