0 The Basics –There are 4 POLR customer classes: Residential, Small Non-Res. (<50 kW), Medium Non Res.(50 kW <1000 kW) and Large Non Res. (≥1000 kW) –There.

Slides:



Advertisements
Similar presentations
1 Distributed Generation Task Force November 5, 2007.
Advertisements

1 Managing Revenues in Regulated Industries Rate Design May 2008 Richard Soderman Director-Legislative Policy and Strategy.
LRISv2 Subgroup 10/27/ POLR Rates- Residential § Provider of Last Resort (POLR) (m) (2) (A) Rates applicable to POLR service, residential.
Overview – Non-coincident Peak Demand
Smart Metering in ERCOT: Implementation Update CCET Board of Directors Meeting August 3, 2011 Presented by Christine Wright, Competitive Markets Division.
TEXAS Market Profile January TEXAS Market Market Size: $24 Billion Potential Market 7.1 Million Potential Customers.
October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.
Retail Smart Grid Trends Paul Wattles Senior Analyst, Market Design & Development UT Energy Week: “How Smart Grids Enable Consumers” Feb. 18, 2015.
1 AMS Data Workshop ERCOT Overview of AMS Data Processes June 27, 2014 ERCOT June 27, 2014.
Technical Conference on Net Metering Load Research Study November 5, 2014.
RMSUpdate January 6, 2005 Retail Market Subcommittee Update to TAC.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
1 ERCOT LRS Detail Sample Design PWG Presentation April 24, 2007.
ERCOT MARKET EDUCATION
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Market Operations Presentation ERCOT Board of Directors October 21, 2008 Updated as of 10/21/08 Betty Day.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
1 PWG Update Report By Ed Echols Of Oncor ERCOT PWG Chair Jim Lee of Direct Energy ERCOT PWG Vice Chair for COPS Meeting Sept 10, 2014.
RMS Update to TAC April 7, RMS Voting Items  RMGRR032- Transaction Timing Matrix Corrections Includes updates to Appendix D to correct examples.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
SPP Presentation Stakeholder Meeting April 16, 2008 Austin, Texas UPDATE: Retail Open Access for ETI within SPP.
1 ERCOT LRS Sample Design Review PWG Presentation March 27, 2007.
1 Distributed Renewable Generation Legislation as of 5/02/07  SB 483 by Fraser- Relating to the regulation of electric generation capacity ownership in.
MARS 867_03F ROR vs. Settlement vs. 810 Scenarios ERCOT September 2008.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
Distributed Renewable Generation Profile Implementation Plan.
1 TX SET Update to RMS November 12, RMGRR Activity RMGRR065 – Disconnect and Reconnect for Non-Payment Updates and Corrections – –Normal Timeline.
Texas Competitive Market & Governance October 4, 2015.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
MARS Taskforce COPS Update August 10, Definitions AMC – AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP AMDG – 15 Minute.
1 TDTWG March 4, 2009 Performance Measures Overview.
1DRAFT for DISCUSSION Transition From Non-IDR to IDR Load Profile and LSE 15-minute Data for AMS Market Advanced Readings and Settlements Taskforce 10/9/09.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
1 Commercial Operations Sub-Committee Update to RMS November 10, 2005.
LRISv2 Subgroup Proxy $G Discussion 10/27/
1 Market Operations Presentation Board of Director’s Meeting December 13, 2005.
Feb 7, 2013 Technical Advisory Committee RMS Update Rob Bevill.
Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.
1 ERCOT COPS Round 2 Sample Design Review April 10, 2007.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
1 A Review of Impacts to UFE and Load Ratio Share Based on AV Profile ID Changes Presented by ERCOT Staff to the Profiling Working Group 10/26/2005.
Mass Transition—Timelines & Volume Limitation RMGRR116—Acquisition Transfer Non-standard Metering Future Meetings 1.
PWG Long Term Strategy How do we maximize scarce resources?
Demand Response Options Review Carl Raish November 27, 2007.
1 Market Operations Presentation Board of Director’s Meeting August 16, 2005.
Distributed Renewable Generation Profiling Methodology ERCOT Load Profiling March 4, 2008.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
City of East Point Determination of PCA and ECCR Chau Nguyen, ECG
1 Market Operations Presentation Board of Director’s Meeting February 16, 2005.
1 RMS Update to RMWG June 6, Market Process for Solar & Wind Devices Retail customers are purchasing and installing wind and solar equipment on.
Is the Weight Worth It? PWG April 27, Introduction The Average Load Factor (AvgLF) used to determine Profile Segment assignment is a weighted.
ERCOT MARKET EDUCATION
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Settlement Timeline Workshop
Profiling Working Group
2016 Annual Validation Update PWG
The New Texas Wholesale/Retail Market
Energy Storage Settlements Consistent with PUCT Project & NPRR461
CEO Report Thomas F. Schrader ERCOT Board of Directors May 17, 2005
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

0 The Basics –There are 4 POLR customer classes: Residential, Small Non-Res. (<50 kW), Medium Non Res.(50 kW <1000 kW) and Large Non Res. (≥1000 kW) –There are 24 POLR areas, 6 TDUs (CNP, TXU, AEP TCC, AEP TNC, Sharyland- McAllen and TNMP) x 4 POLR customer classes. –A REP is eligible to serve as a POLR if the REP has been in business in Texas more than 18 months, is in good standing with the Commission, serves the POLR customer class in the TDSP, and surpasses the minimum threshold for load and ESI ID count established by the commission. (This calculation roughly results in REPs with ~1% market share in a given POLR area being eligible to provide POLR service.) –There are two types of POLR providers: Volunteer REPs and Large Service Providers (aka Non-Volunteer POLR) –The number of LSPs per area is capped at the 15 largest eligible REPs by annual MWh sales by area/class. –Each Mass Transition Event is treated as a separate event. POLR Rule Overview

1 During a mass transition ERCOT segments and assigns ESI IDs to the VREP before assigning ESI IDs to the LSP POLRs. A VREP will not be assigned more ESI IDs than it has indicated it is willing to serve. (Currently no REPs are VREPs) –If the number of ESI IDs is less than the total that the VREPs indicated that they are willing to serve, each VREP shall be assigned a proportionate number of ESI IDs. –After VREPs have reached their ESI ID threshold all remaining ESI IDs are distributed to the LSP in a weighted manner based on the market share calculation made at the time of LSP designation. –If a REP is both a VREP and LSP POLR in the same area/class bucket the REP is obligated to serve all the ESI IDs assigned to it. –ERCOT assigns ESI IDs in a class/area bucket randomly. –The POLR provider is financially responsible for all costs of providing electricity to customers for as long as REP of Record. POLR Rule Overview

2 Pricing VREPs serve customers exclusively at month to month “market based rates.” LSP REPs may serve mass transition customers at either a market based rate or the POLR rate based upon Real-Time prices. LSP Residential POLR rate (in $ per KWh) = (Non-bypassable charges + POLR customer charges + POLR energy charge)/ kWh used –Pass through of utility non-bypassable charges, which includes: TDU charges, ERCOT administrative fees, nodal fees, replacement reserve charges attributable to POLR load, and applicable taxes –Residential Customer Charge is $0.06 per kWh –Energy charge is 120% of the actual hourly real-time price of energy with a price floor based on a simple average previous year’s real time settlement prices. –kWh used is based either on interval data or an allocation of the customer’s total actual usage to the hour based on a ratio of the customer’s ERCOT backcasted load profile. POLR Rule Overview

3 LSP Small Non Residential and Medium Non Residential rate (in $ per KWh) = (Non-bypassable charges + POLR customer charges + POLR demand charge + POLR energy charge)/ kWh used –Pass through of utility non-bypassable charges –SNR/MNR Customer Charge is $0.025 per kWh –SNR/MNR Demand Charge is $2.00 per kW per month with a demand meter and $50 per month for customers without a demand meter. –Energy charge is 125% of the actual hourly real-time price with an associated price floor, same as described above. –kWh used is based either on interval data or an allocation of the customer’s total actual usage to the hour based on a ratio of the customer’s ERCOT backcasted load profile LSP Large non-residential rate (in $ per KWh) = (Non-bypassable charges + POLR customer charges + POLR demand charge + POLR energy charge)/ kWh used –Pass through of utility non-bypassable charges, –POLR customer charge ($2,879 per month) –Demand charge ($6.00 per kW per month) –Energy charge that is 125% of the 15 minute interval real-time price with an associated price floor of $7.25. –Customer and demand charges for all customer classes are prorated if a customer switches to a REP of choice POLR Rule Overview