1 Status Report RPC Diagnostic with DT Segment Extrapolation Camilo Carrillo CERN Departamento de Física UNIVERSIDAD DE LOS ANDES Bogotá, Colombia.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
Giuseppe Roselli (CMS-RPC) Università degli Studi di Bari – INFN RPC Efficiency with Track Reconstruction Giuseppe Roselli.
Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
NSW background studies Max Bellomo, Nektarios Benekos, Niels van Eldik, Andrew Haas, Peter Kluit, Jochen Meyer, Felix Rauscher 1.
Run Coordination Report 4th RPC General Meeting (CMS week) Luigi BENUSSI, Hassan SHAHZAD, Nicolas ZAGANIDIS.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
RPC Temperature Studies A. Cimmino. Temperature Studies 310 temperature sensors are collocated throughout the barrel. Temperatures are monitored by the.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.
Data Quality Monitoring for the CMS Resistive Plate Chamber Detector Anna Cimmino etc etc etc Università degli Studi di Napoli “ Federico II ” & INFN of.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
CERN, LIU-SPS ZS Review, 20/02/ Brief review on electron cloud simulations for the SPS electrostatic septum (ZS) G. Rumolo and G. Iadarola in LIU-SPS.
Muon Barrel Geometry Studies Luca Scodellaro Muon Barrel Workshop July 6 th, 2010.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai, Kazuhiko Hara (Univ. of.
1 DT Local Reconstruction on CRAFT data Plots for approval CMS- Run meeting, 26/6/09 U.Gasparini, INFN & Univ.Padova on behalf of DT community [ n.b.:
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
GE1/1-III GEM Cluster Size and Resolution Studies with the FNAL Beam Test Data Aiwu Zhang, Vallary Bhopatkar, Marcus Hohlmann Florida Institute of Technology.
Notes in preparation by the Torino group Sara BolognesiDT Cosmic Meeting 01/11/2007  MTCC note:  calibration section  DQM section  Internal note about.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
RPC Simulation software Raffaello Trentadue. RPC Digi producer RPC Digitizer RPC Synchronizer RPC Simulation model Average model Parametrized model Parametrized.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
Plots of RPC performance G. Cattani, University of Rome “Tor Vergata” & INFN Roma 2 on behalf of ATLAS Muon Collaboration.
Preparation for Running Outline Present Schedule Detector Preparation Requests for dedicated runs –Cosmics, Splashes, Alignment Muon Shifts Experts A.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
Silvia Costantini RPC General Meeting CMS week 15 June 2010.
Results with the RPC system of OPERA and perspectives
(University of Sofia “St. Kliment Ohridski”)
Production ad Quality control of RPCs for the CMS muon barrel system
Analysis and paper on chamber and telescope performance
Muon Alignment: Organization
Calibration Status of the art – the first tTrig calculated from data
DT Local Reconstruction on CRAFT data
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
Han Jifeng BESIII MUON GROUP IHEP, CAS
BESIII RPC Detector Jiawen Zhang
RPC Detector Control System
Performance of a Multigap RPC prototype for the LHCb Muon System
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
DQM for the RPC subdetector
RPC HV-LV project Introduction System requirements and description
on behalf of Barrel RPC Collaboration
Resistive Plate Chambers performance with Cosmic Rays
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Gatti Modeling of Charge Distribution Data from ME1/1 HV Run 3.1 kV
RPC approved plots.
Status of DT Local Trigger Commissioning
Presentation transcript:

1 Status Report RPC Diagnostic with DT Segment Extrapolation Camilo Carrillo CERN Departamento de Física UNIVERSIDAD DE LOS ANDES Bogotá, Colombia

2 Outline CRAFT HISTORY. HV Scan. Reports done about RPCs. Reclusterizer. DQM Offline.

3 CRAFT HISTORY First of all, First of all, this analysis has been done with the results published in Bari's server from segment efficiency. Available for everybody. Summary with run description in Twiki Page Last Runs slow analysis, CAF queue too busy

4 CRAFT List of runs

5 HV Scan For example W+0_RB1in_S09_Backward flag=good WP=9.29 kV eff=78.56 % Results about HV scan during CRAFT for all the barrel with DT Segment extrapolation. In red % Masked strips, black hv scan Different Profiles

6 Fit Function* Emax 0,5% Why less masked strips with higher voltage? Finding the Working Point and the Max Efficiency. *from MTCC paper flag=good WP=9.29 kV eff=78.56 % Is this the actual HV?

7 9.1kV 9.3kV9.2kV HV Scan 9.0kV

8 Reports about. Inverted FEBs in the Barrel. Parity like rotation in the endcaps. Wrong Strip Lengths in the Barrel. Shift in the residuals.

9 Inverted FEBs in the Barrel first 15, last 15.

10 List of inverted FEBs “first 15, last 15” W-2_RB3-_S02_Backward = 1 W-2_RB3+_S11_Forward = 1 W+0_RB3 Sector 4 & 5 = 8 TOTAL 10

11 Inversion at FEB level Efficient Ineficient

12 List of inversion at “FEB level” W+1_RB1out_S06_BackwardW+1_RB1out_S06_ForwardW+1_RB2out_S06_BackwardW+1_RB2out_S06_Forward Total 4

13 Rotated rolls in the EndCaps.

14 List of rotated rolls in the EndCaps All RE+2 (Far Side turned off)‏ RE+1 Ring 1 Hard to explain the low efficiency in the chambers without geometrical effects, working on that.

15 Wrong Strip Lengths in the Barrel After implemented 2D histograms in the barrel we found the explanation to many low efficiencies.

16 With Out Cross Talk is more clear

17 List of chambers with Wrong strip Length. W-2_RB1out_S12_Forward W-2_RB1in_S09_Forward W-2_RB2out_S04_Middle W-2_RB2out_S08_Backward W-2_RB3-_S04_Forward W-2_RB3+_S10_Backward W+0_RB2in_S02_Middle W+0_RB2in_S02_Forward W+0_RB1out_S01_Backward W+0_RB1out_S01_Forward W+0_RB2out_S06_Forward W+0_RB3+_S04_Forward All Wheel -1 Sector 3 (Confirmed) = 17 rolls. Is not possible to check if a strip in the geometry is shorter that the actual one, is checking all the list.

18 Strange effect under study. New Any help with this???

19 Residuals with DT Segment EXtrapolation Even for RB4

20 Is observed some shifts > 1cm* Wheel -2 RB2out S02_M RB2out S02_B RB1out S08_B Wheel -1 RB3- S06_B RB3+ S06_B RB3+ S06_F Wheel 0 RB1in S02_F RB2in S02_B RB2in S02_M RB2in S02_F RB2in S05_F RB2out S05_F RB3- S02_B Wheel +1 RB1out S06_B RB1out S06_F RB2out S06_F Wheel +2 RB2in S01_B RB2in S01_F RB2in S02_F RB2out S02_B RB3- S02_B * Selection of residuals by Taimoor

21 RPCs could be included in alignment studies.

22 Now analyzing again a distribution Strange Effect Chambers turned off Inversions at the level of FEB Many Masked Strips Some Masked Strips Wrong Strip Lenght Good Run with 9.3,9.4kVGood Run with 9.3,9.4kV Shifts

23 To finish reclusterizer. Masked strip Masked Strip in the MiddleOld Rec HitsNew Rec Hit

24 News about DQM Offline All the CRAFT data will be reprocessed in a new version of CMSSW_2_2_X in Tier 0, this tool will be in. New histograms showing the Efficiency per wheel (asked by Pigi). The changes in the Geometry will be available for CMSSW_3_0_X.