The DESIR facility at SPIRAL2  collaboration initiated during the first SPIRAL2 workshop, July 2005  to use SPIRAL2 and SPIRAL low energy (<60 keV) beams.

Slides:



Advertisements
Similar presentations
Coulomb excitation with radioactive ion beams
Advertisements

EURISOL Transition period MYRRHA and
Grupo de Física Nuclear Experimental IEMIEM CSIC ISOL MAGISOL Meeting January 2009Mª José Gª Borge SPIRAL 2 Outline:
The low-energy facility at SPIRAL2 transport-energy (50 keV) exotic-nuclide beams for: For the DESIR Collaboration: D. Lunney, SPIRAL2 SAC, 29 January.
JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
DESIR Progress Report DESIR hall details defined for civil construction: - compressed air, liquid nitrogen, cooling water, etc detailed layout of RFQ-HRS.
Low energy radioactive beams Carmen Angulo, CRC Louvain-la-Neuve, Belgium FINUPHY meetingLouvain-la-Neuve, Belgium3-4 May 2004 Recent highlights on nuclear.
Possibility for the production and study of heavy neutron-rich nuclei formed in multi-nucleon transfer reactions proposal for a new project at FLNR V.
Teresa Kurtukian-Nieto Centre d’Etudes Nucléaires de Bordeaux Gradignan Precision half-life determination of the superallowed 0 + → 0 + β + -emmiters 42.
The LaSpec project. At FAIR… Cheapest(?),Fully destripped…
DESIR  SPIRAL2 organization & scientific program layout of the facility status and perspectives LUMIERE  Laser DESIR: the LUMIERE.
The CARIBU facility Guy Savard Argonne National Laboratory & University of Chicago ATLAS Users Meeting May
Superheavy Element Studies Sub-task members: Paul GreenleesJyväskylä Rodi Herzberg, Peter Butler, RDPLiverpool Christophe TheisenCEA Saclay Fritz HessbergerGSI.
MATS/LaSpec Status report Alexander Herlert FAIR GmbH on behalf of the MATS and LaSpec Collaborations Thanks to W. Nörtershäuser, D. Rodríguez, P. Campell,
Radioactive Ion Beam (RIB) Production at ISOLDE by the Laser Ion Source and Trap (LIST) Sven Richter for the LIST-, RILIS- and ISOLDE IS456 Collaborations.
ISCC 24 May 2004L.M. Fraile L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report ISOLDE Collaboration Committee 24 th May 2004 ISOLDE scientific.
XXXVIII th Rencontres de Moriond MORIOND WORKSHOP ON Radioactive beams for nuclear physics and neutrino physics Acceleration of RIB using cyclotrons Guido.
Richard Pardo Argonne National Laboratory ATLAS Operations ATLAS User’s Meeting August 14, 2009.
LASER, Joint EURONS-EURISOL Town Meeting, Helsinki, Sept. 17, 2007 LASer techniques for Exotic nuclei Research (LASER) Iain Moore (JYFL) on behalf of the.
“Ultra Pure and High Intensity Multiply Charged Radioactive Ion Beams” Associated institutes: IPNS KEK, Japan S. Jeong, N. Imai, M. Oyaizu, H. Myiatake.
A facility for Nuclear, Atomic, Material and Radiobiology Sciences. Delivering stable (from C to U) and radioactive ions (from He to Xe) in the energy.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
Structures and shapes from ground state properties 1.Nuclear properties from laser spectroscopy 2.Status of laser measurements of moments and radii 3.New.
Collinear laser spectroscopy of 42g,mSc
CEA Bruyères-le-chatel, April 27, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme Safety.
Nuclear physics: the ISOLDE facility
EURISOL Instrumentation Reaching the drip lines Best way to reach drip lines: fragmentation or in-flight fission e.g. 48 Ni, 100 Sn, 78 Ni etc  fragment.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Radioactive ion beam facilities How does they work ? 2012 Student Practice in JINR Fields of Research 9.oct.2012 I. Sivacekflerovlab.jinr.ru.
Mass measurements using low energy ion beams -1- C. Thibault 31 mars 2004 Motivations to measure masses Present status Experimental methods for direct.
Beam transport tunnels  from -9.3 to m  3 levels, 310 m 2, 1020 m 3  97 m of beam lines Technical rooms  from to m  3 levels, 660.
K. Riisager, TA8 ISOLDEEURONS PCC-Meeting, Mainz (Germany), April 2006 Recent highlights from ISOLDE News from the facility –Users meeting, February.
DESIR at SPIRAL2 Désintégration, Excitation et Stockage des Ions Radioactifs Decay, excitation and storage of radioactive beams DESIR: facility layout.
RFQ cooler and buncher project for ISOLDE Present status and off-line test results Hanna Frånberg, ISOLDE.
The REXTRAP Penning Trap Pierre Delahaye, CERN/ISOLDE Friedhelm Ames, Pierre Delahaye, Fredrik Wenander and the REXISOLDE collaboration TAS workshop, LPC.
35 Ca decay beta-delayed 1- and 2-proton spokespersons: J. Giovinazzo (CENBG), O. Tengblab (CSIC) institutions: Centre d’Etudes Nucléaires (Bordeaux) –
 angular correlations LPC-Team : G. Ban, G. Darius, P. Delahaye, D. Durand, X. Flechard, M. Herbane, M. Labalme, E. Liénard, F. Mauger, A. Mery, O. Naviliat,
Physics at DESIR RFQ cooler SHIRaC HRS transfert beam lines DESIR building safety finances J.C. Thomas, GANIL July 2010.
Low-energy physics in France SIRa at GANIL ̵ charge radius of 6 He LIRAT at SPIRAL1/GANIL ̵  angular correlations: LPCTrap ̵ mirror  decays ̵ branching.
In Progress T-Rex TAMUTrap SASSYER Active Target Det RTC + chemistry Radioisotope production.
Nanuf03, Bucharest, Stefan Kopecky Traps for fission product ions at IGISOL Experimental Facilities Mass Measurements Status and Future Perspectives.
The DESIR physics workshop (Leuven 26 th – 28 th May) Paul Campbell Present status… Community interests… The future experiments…
FLAIR meeting, GSI March Positron Ring for Antihydrogen Production A.Sidorin for LEPTA collaboration JINR, Dubna.
The DESIR low energy beam facility at SPIRAL2 DESRI Decay, Excitation and Storage of Radioactive Ions B. Blank, CENBG LEA.
Arctic FIDIPRO-EFES Workshop, Saariselkä, Finland April 20-24, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility.
B elgian R esearch I nitiative on e X otic nuclei ISOLDE INTC-P-316 Spokespersons: G. Neyens, M.M. Rajabali, K.U. Leuven Local contact: K.T. Flanagan,
February 12-15,2003 PROCON 2003, Legnaro-Padova, Italy Jean Charles THOMAS University of Leuven / IKS, Belgium University of Bordeaux I / CENBG, France.
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
ISNP2009, BARC, Mumbai, 8-12 december, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme.
LIST status and outlook Sven Richter for the LIST-, RILIS- and Target-Collaborations 21 st of August 2013.
Nuclear moments and charge radii of Mg isotopes from N=8 up to (and beyond) N=20 Univ. Mainz: M. Kowalska, R. Neugart K.U.Leuven: D. Borremans, S. Gheysen,
Riccardo Raabe (IKS, KU Leuven) for the Collaboration INTC 01/02/2012 INTC-O-014 Storage ring facility at HIE-ISOLDE: Technical Design Report.
The TRI  P programme at KVI Tests of the Standard Model at low energy Hans Wilschut KVI – Groningen Low energy tests e.g. Time reversal violation precision.
Laboratori Nazionali del Sud Start EXCYT status and perspectives L. CELONA on behalf the EXCYT collaboration Istituto Nazionale di Fisica Nucleare-Laboratori.
TRIGA-SPEC: Developement platform for MATS and LaSpec at FAIR Double-beta transition Q-value measurements with TRIGA-TRAP NUSTAR Meeting Christian.
Beam Preparation, Task 9 Department of Physics, University of Jyväskylä.
CEA Saclay, April 24, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme Safety around DESIR.
CEA Saclay, April 24, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme Safety around DESIR.
The Belgian Research Initiative on eXotic nuclei – BriX network BriX Days Oostende, March 25-26, 2013 Funded by the Interuniversity Attraction Poles Programme.
The DESIR facility at SPIRAL2
PIPERADE: A Penning trap isobar separator for SPIRAL2/DESIR
The Medium and High resolution mass separators for SPES facility
The DESIR facility at SPIRAL2
for the EURISOL Steering Committee
Beta Neutrino Correlation Measurement with Trapped Radioactive Ions
Laser assisted decay spectroscopy at the cris beam line at
Nuclear Physics in France
Precision Measurements of Very-Short Lived Nuclei
EMIS, 2002, Victoria, Canada Mats Lindroos for PSMB Mats Lindroos.
Presentation transcript:

The DESIR facility at SPIRAL2  collaboration initiated during the first SPIRAL2 workshop, July 2005  to use SPIRAL2 and SPIRAL low energy (<60 keV) beams for decay spectroscopy laser spectroscopy ion and atom trap experiments Spokes-person: Bertram Blank GANIL liaison: Jean-Charles Thomas Gerda Neyens, SAC SPIRAL2, 26 november 2007 Désintégration, Excitation et Stockage d’Ions Radioactifs Decay, excitation and storage of radioactive ions

* MLL trap system (LMU Munich) *  -charged particle set-up (Bordeaux, GANIL, Strasbourg, Orsay, Madrid) * Collinear laser set-up (Manchester, Leuven, Birmingham, Orsay)  talk P. Campbell, Thursday, 17.00u *  -NMR set-up (Leuven) * MOT trap (KVI Groningen, LPC Caen) * TAS set-up (Valencia) * TETRA neutron set-up (Dubna)  talk Y. Penionzhkevich Thursday 17.00u * Neutron energy set-up (LPC Caen) * LPC-trap (LPC Caen) The DESIR experimental set-ups (present status)  All these collaborations are obviously open to other interested users!

GANIL Today Existing GANIL facility LIRAT Low energy beams from SPIRAL EXPERIMENTAL AREAS CIME (SPIRAL cyclotron) GANIIL cyclotrons Ligne d' Ions RAdioactifs à Très basse énergie....

6 He + production at SPIRAL LIRAT low energy beam line cooling in H 2 gas / bunching trapping/measuring candidate:(pure GT transition) deduce  angular correlation from measurement of  -recoil (recoil with very low energies < 1 keV) LPC Paul LIRAT Production and preparation of 6 He for weak-interaction studies Oscar Naviliat-Cuncic et al., LPC Caen

SPIRAL 2 LAYOUT LINAG (high intensity d and stable beams) Production building For RIB Existing GANIL facility LIRAT +LIRAT2 DESIR Low energy beams from SPIRAL and SPIRAL2 (and S3 ?) S3 High-intensity stable beams on thin target + in-flight high-resolution separator + gas cell for stopping + ??

DESIR PRODUCTION BUILDING LINAG EXISTING EXPERIMENTAL AREAS CIME EXISTING ACCELARATORS CSS2 CSS1 S3 Schematic SPIRAL 2 LAYOUT Recent idea: send S3 radio-isotopes (re-ionized from gas cell) to DESIR set-ups for mass, radii, moments, decay studies ….

Beam requirements for ISOL-type experiments:  high degree of purity needed for exotic beams ! = good mass selectivity and element selectivity. Suggested solutions for SPIRAL2 produced beams: + RFQ high-efficiency cooler/buncher for efficient reduction of beam emittance (G. Ban, LPC, DESIR session and F. Duval, LPC, Tuesday 17.00u) + high resolution mass separator (T.Kurtukian-Nieto, CENBG, DESIR session Tuesday 9.00u) + laser ionization source (element selection during ionization) (A. Olivier, IPNO and N. Lesecne, GANIL, Thursday 17.00u)

SHIRaC = SPIRAL2 High Intensity Radiofrequency Cooler Prototype RFQ linear Paul trap, set up initially at CSNSM Orsay Now transferred to LPC Caen for further development Goals: * high-voltage (20 kV), high frequency (20 MHz) linear radio-frequency quadrupole trap for strong confinement of  A beams. (gain factor 100 in confinement compared to present devices) * incorporate two sections with different radius (to reduce losses at the injection) Results so far: * Prototype partially tested at high-current separator SIDONIE (Orsay)  a 1.1  A beam has been trapped (O. Gianfrancesco et al., Proc. EMIS2007) See talk F. Duval, LPC, Tuesday in ‘selected contributions’

High Resolusion Mass Separator  symmetric design, inspired by the CARIBU HRS at Argonne National Laboratory: with two magnetic dipoles Dcombined as QQHQD M DQHQQ six quadrupoles Q two sextupoles H one multipole M  To minimize aberrations, provide large mass dispersion Beam profile in x-direction Suggested layout Status: in design phase Integrated in production building See talk T.Kurtukian-Nieto, CENBG, DESIR session Tuesday 9.00u

RFQ cooler DESIR 1+ Booster IBE 1+ IBE n+ CIME n+ Production building Linacbeam Ion source 1 Ion source 2 F. Varenne, GANIL HRS User request: By-pass RFQ/HRS

1+ beam DESIR x Paul trap Off-line Ion sources D. Lunney, CSNSM Collinear Laser Line MOT  -NMR ~ 1500 m 2 neutrons general purpose spectroscopy trap

DESIR: Financial situation Main parts:estimated costs fund available RFQ and HRS « building »: included in SPIRAL2 project DESIR building: 6000 k€ 2000 k€ (CPER) RFQ: 320 k€ 320 k€ (CPER) HRS: 500 k€ - beam lines: 3600 k€ - off-line source 60 k€ -

MLL trap system:LMU München860 kEuros  -charged particle setup:France, ANR VS kEuros Collinear laser spectroscopy: Manchester300 kEuros Orsay200 kEuros Leuven150 kEuros  -NMR setup:Leuven100 kEuros Spectroscopy setup:Madrid200 kEuros MOT trap:KVI Groningen500 kEuros TAS setup:Valencia180 kEuros Neutron detection (multiplicity, TETRA setup): Dubna200 kEuros Neutron detection (energy): (LPC Caen and others) 400 kEuros Equipment to come to DESIR

The DESIR facility in FP7 preparatory phase Study of exotic nuclei at ISOL energies using decay, excitation and storage of nuclei 1 st year2 nd year T1T2T3T4T1T2T3T4 DESIR Collaboration Committee meetings DESIR Collaboration meeting Tests of the MLL trap Design of the DESIR beam lines Design of the HRS Memorandum of understanding Task : organise meetings of the DESIR Coordination Committee, prepare the proposal for the DESIR facility, study the high-resolution separator and the beam lines of DESIR contribute to the development of the trapping system of DESIR. Requested Budget manpower: 142k€ (Beneficiary CNRS, KVI) 2 post-docs for beam line and HRS material: 16k€ (Beneficiary: GANIL, CNRS) travel funding for collaboration meetings ~ 40k€ Deliverables: Reports on - MLL trap test - beam line design - HRS design MoU signed

DESIR Meeting Conv. : B. Blank (Atelier Alcandre, Congress Center) Tuesday Welcome – B. Blank (CENBG) The DESIR building - J.C Thomas (GANIL) DESIR RFQ cooler SHIRAC – G. Ban / F. Duval (LPC) DESIR high-resolution separator – T. Kurtukian – Nieto (CENBG) Setups forseen for DESIR – B. Blank (CENBG) Financial aspects – B. Blank (CENBG) MLL trap at DESIR – P. Thirolf (LMU Muenchen) The LIRAT2 project – J.C Thomas (GANIL) Laser spectroscopy set up for LIRAT2 / DESIR – G. Neyens (K.U Leuven) Laser resonant ionisation to purify radioactive beams – K. Flanagan (CERN) Organisation of the DESIR collaboration – B. Blank (CENBG) DESIR Proposal – B. Blank (CENBG) DESIR web page – B. Blank (CENBG) EVERYBODY WELCOME !