TUTORIAL 5 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 18/11/2012 Introduction to MS Project 2007.

Slides:



Advertisements
Similar presentations
TUTORIAL 6 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 25/11/2012 Introduction to MS Project 2007.
Advertisements

MS-Word XP Lesson 7.
Step-by-Step: Add a Graphical Hyperlink USE the Special Events Final presentation that is still open from the previous exercise. 1.Go to slide 4, and click.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Excel Project 4 Financial Functions, Data Tables, Amortization Schedules, and Hyperlinks.
Creating Templates and Working with Multiple Worksheets and Workbooks
Chapter 3 Creating a Business Letter with a Letterhead and Table
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
TUTORIAL 3 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 14/10/2012 Introduction to MS Project 2007.
Creating a Document with a Table, Chart, and Watermark
CREATING A MULTIPLE PAGE REPORT Presented by: Dr. Ennis-Cole.
Copyright 2003 Peter McDevitt 1 Microsoft Excel 2002 Lecture 3 – A Professional Looking Worksheet.
Project Information: Customizing and Printing Lesson 7.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Word Project 6 Creating a Professional Newsletter.
Microsoft Office 2010 Access Chapter 1 Creating and Using a Database.
Microsoft Excel 2010 Chapter 7
XP New Perspectives on Microsoft Office Excel 2003, Second Edition- Tutorial 3 1 Microsoft Office Excel 2003 Tutorial 3 – Developing a Professional- Looking.
Microsoft PowerPoint ® 2003 Carl B. Struck Presentation Graphics n Educational, business, sales and other presentations (slide shows) n Combination of.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t PowerPoint Project 3 Using Visuals to Enhance a Slide Show.
Creating, Formatting, and Editing a Word Document with a Picture
1 Computing for Todays Lecture 10 Yumei Huo Fall 2006.
Microsoft Office 2003 Illustrated Brief Document Enhancing a.
XP New Perspectives on Microsoft Office Excel 2003 Tutorial 4 1 Microsoft Office Excel 2003 Tutorial 4 – Working With Charts and Graphics.
Project Plan Formatting – Fundamentals Lesson 6. Skills Matrix SkillsMatrix Skill Format a Gantt ChartModify the Gantt Chart using the Bar Styles dialog.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Excel And Microsoft Project Technology Plug-In T12.
Microsoft Office © Copyright William Rowan Objective By the end of this you will have being given a brief introduction to: Microsoft Word Microsoft.
Customizing Forms and Writing QuickBooks Letters Lesson 15.
Office 2003 Post-Advanced Concepts and Techniques M i c r o s o f t Word Project 8 Working with Macros and Visual Basic for Applications (VBA)
Reporting Aesthetics An ACEware Webinar 1:00-2:00 pm February 14 th, 2008.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Access Project 4 Reports, Forms, and Combo Boxes.
SWE 466- Resources Tutorial # 2. So far… TasksMilestones Summary Tasks Duration of the tasks.
Tracking progress on tasks and assignments TUTORIAL # 3.
Laboratory Exercise # 13 – Font and Number Format Styles Office Productivity Tools 1 Laboratory Exercise # 13 Font and Number Format Styles Objectives:
Customizing forms and writing QuickBooks Letters Lesson 15.
Introduction to PowerPoint 2003 Learning And Research Technical Unit (LARTU)
PowerPoint. Basic Vocabulary Slide - Presentation - Slide layout – ► ► ► ► a single page in PowerPoint all the slides for a speech all the slides for.
TUTORIAL 4 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 04/11/2012 Introduction to MS Project 2007.
Chapter 6 Advanced Report Techniques
PowerPoint Tutorial. Basic Vocabulary ► Slide - Presentation - Slide layout – ► ► ► a single page in PowerPoint all the slides for a speech all the slides.
Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin TECHNOLOGY PLUG-IN T8 DECISION MAKING USING ACCESS.
Microsoft Office Excel 2003 Tutorial 3 – Developing a Professional-Looking Worksheet.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Access Project 5 Enhancing Forms with OLE Fields, Hyperlinks, and Subforms.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Excel Project 6 Creating Templates and Working with Multiple Worksheets and Workbooks.
Database Applications – Microsoft Access Lesson 6A Designing Custom Forms Updated F13 24 slides in presentation 1.
Introduction to MS WORD.
This tutorial teaches Microsoft Word basics. Although knowledge of how to navigate in a Windows environment is helpful, this tutorial was created for.
Lesson: 3 Word Processors After lesson 3, you will be able to: Perform basic tasks in a word processor. Edit and format text. Work with tables and pictures.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Access Project 5 Enhancing Forms with OLE Fields, Hyperlinks, and Subforms.
TUTORIAL 7 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 08/04/2012 Introduction to MS Project 2007.
Microsoft Publisher 2010 Chapter 7 Advanced Formatting and Merging Publications with Data.
TUTORIAL 9 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 22/04/2012 Introduction to MS Project 2007.
TUTORIAL 8 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 15/04/2012 Introduction to MS Project 2007.
Microsoft Access 2010 Chapter 8 Advanced Form Techniques.
Introduction to Microsoft publisher
Office Management Tool - II Institute of Management Sciences Muhammad Shahzad Ali Lec 8: Introduction to MS - PROJECT L E C T U R E 8 INTRODUCTION TO MS.
Lecture 4 Prepared By : Md Jakaria 1 Microsoft Word Basics.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved TECHNOLOGY PLUG-IN T8 Decision Making Using Access.
Customizing Reports Adding a Date to a Report Reference Window Adding a Date to a Report Display the report in the design view Click the Text Box Tool.
Project Schedule Formatting Fundamentals Lesson 8 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Project Microsoft.
1 After completing this lesson, you will be able to: Create a form using AutoForm. Create a form using the Form Wizard. Add controls to a form. Modify.
Customizing Menus and Toolbars CHAPTER 12 Customizing Menus and Toolbars.
Chapter 7 Creating Templates, Importing Data, and Working with SmartArt, Images, and Screen Shots Microsoft Excel 2013.
Chapter 11 Enhancing an Online Form and Using Macros Microsoft Word 2013.
Integrating Office 2003 Applications and the World Wide Web
Chapter 7 Advanced Form Techniques
Shelly Cashman: Microsoft Word 2016
Chapter 18 Finalizing a Database.
Presentation transcript:

TUTORIAL 5 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 18/11/2012 Introduction to MS Project 2007

Assigning Cost Resources to Tasks 2 Cost resource costs, which are a fixed dollar amount that you enter when assigning the cost resource to a task. The amount is not affected by changes in duration or any other schedule changes to the task, although you can edit the amount at any time. If task 4, Pick locations, is not already selected, click it the Task Name column. In the Assign Resources dialog box, select the Cost field for the Travel cost resource.Cost Type 500, and then press Enter. Task 4 now includes costs resulting from all three types of resource assignments: work, material, and cost. Click the name of task 5, Hold auditions. In the Assign Resources dialog box, select the Cost field for the Catering cost resource.Cost Type 250, and then click Assign. Project assigns the cost resource to the task.

Assigning Material Resources to Tasks In this exercise, you assign the material resource Video Tape to a task and enter a fixed-unit quantity of consumption. In the Task Name column, click the name of task 4, Pick locations. You plan to use up to four tapes while picking locations. In the Assign Resources dialog box, select the Units field for the Video Tape resource.Units Type or select 4, and then press Enter. Because video tape is a material resource, it cannot do work. Therefore, assigning a material resource does not affect the duration of a task. 2

Assigning Cost Resources to Tasks Cost resource costs, which are a fixed dollar amount that you enter when assigning the cost resource to a task. The amount is not affected by changes in duration or any other schedule changes to the task, although you can edit the amount at any time. If task 4, Pick locations, is not already selected, click it the Task Name column. In the Assign Resources dialog box, select the Cost field for the Travel cost resource.Cost Type 500, and then press Enter. Task 4 now includes costs resulting from all three types of resource assignments: work, material, and cost. Click the name of task 5, Hold auditions. In the Assign Resources dialog box, select the Cost field for the Catering cost resource.Cost Type 250, and then click Assign. Project assigns the cost resource to the task. 4

Formatting and Printing Your Plan Creating a Custom Gantt Chart View In this exercise, you create a custom Gantt chart and apply predefined formatting to it using the Gantt Chart Wizard. You then preview the results for printing. On the Tools menu, click Options. In the Options dialog box, click the View tab.View Under the Outline options for label, select the Show project summary task check box, and then click OK. Project displays the project summary task at the top of the Gantt Chart view. You might see pound signs (##) or only part of the value in the project summary task’s Duration field. If so, complete step 6.Duration Double-click the right edge of the Duration column in the column heading to expand the column so that you can see the entire valueDuration 5

Creating a Custom Gantt Chart View Next, you will create a copy of the Gantt Chart view so that the formatting changes you make will not affect the original Gantt Chart view. On the View menu, click More Views.View The More Views dialog box appears, with the current view (the Gantt Chart view) selected. Click the Copy button. The View Definition dialog box appears. In the Name field, type Custom Gantt Chart, and then click OK In the More Views dialog box, click the Apply button. On the Standard toolbar, click Scroll to Task. 6

Creating a Custom Gantt Chart View Next, you will use the Gantt Chart Wizard to format the Gantt bars and milestones in the chart portion of the Custom Gantt Chart view. On the Format menu, click Gantt Chart Wizard. The welcome page of the Gantt Chart Wizard appears Click Next. The next screen of the Gantt Chart Wizard appears. Click Other, and on the drop-down list next to the Other option, click Standard: Style 4. This is the only selection you’ll make in the Gantt Chart Wizard for now, so click the Finish button. The final page of the Gantt Chart Wizard appears. Click the Format It button, and then click the Exit Wizard button. The Gantt Chart Wizard applies the Standard: Style 4 formatting to the Custom Gantt Chart view and then closes. 7

Creating a Custom Gantt Chart View Next, you will format an individual Gantt bar. You’d like to give more visual attention to the Gantt bar for the Hold auditions task. Click the name of task 5, Hold auditions. On the Format menu, click Bar. On the Bar Shape tab, under Middle, click the Color box. Click Blue, and then click OK. On the File menu, click Print Preview On the Print Preview toolbar, click Close 8

Drawing on a Gantt Chart Project includes a Drawing toolbar with which you can draw objects directly on the chart portion of a Gantt chart. For example, if you would like to note a particular event or graphically call out a specific item, you can draw objects, such as text boxes, arrows, and other items, directly on a Gantt chart. In this exercise, you display the Drawing toolbar and add a text box to the Custom Gantt Chart view. On the View menu, point to Toolbars, and then click Drawing.View On the Drawing toolbar, click the Text Box button, and then drag a small box anywhere on the chart portion of the Custom Gantt Chart view. In the box that you just drew, type Film festival January 10 and 11 On the Format menu, point to Drawing, and then click Properties. The Format Drawing dialog box appears. 9

Drawing on a Gantt Chart Click the Line & Fill tab if it is not already selected. In the Color box under the Fill label, click Yellow. Next, you’ll attach the text box to a specific date on the timescale. Click the Size & Position tab. Make sure that Attach To Timescale is selected, and in the Date box, type or click 11/03/2012. In the Vertical box under Attach To Timescale, type 2.75 (this is the number of inches below the timescale where the top of the box will be positioned), and then click OK to close the Format Drawing dialog box. Project colors the text box yellow and positions it below the timescale near the date you specified. Click in an empty area of the Gantt Chart view to unselect the text box. On the View menu, point to Toolbars, and then click Drawing.View 10

Formatting Text in a View You can format text in tables, such as task names in a Gantt Chart view. In this exercise, you switch to a different view and then use text styles and direct formatting to change the appearance of the text in that view. On the View menu, click More Views.View In the Views box, click Task Sheet, and then click Apply. On the View menu, point to Table: Entry, and then click Summary.View Next, you’ll change the way in which Project formats an entire category of information-in this case, summary tasks. On the Format menu, click Text Styles. On the Item to Change list, click Summary Tasks. In the Size box, click

Formatting Text in a View In the Color box, click Blue. In the Background Color box, click Silver. In the Background Pattern box, click the dark dot pattern at the bottom of the drop-down list. Click OK. In the Summary table, click the Cost field for task 7, the Production summary task.Cost On the Format menu, click Font. In the Font Style box, click Bold Italic. In the Background Color box, click Yellow. Click OK. 12

Formatting and Printing Reports Reports are intended for printing Project data. In this exercise, you view a report in the Print Preview window and then edit its format to include additional information. On the Report menu, click Reports.Report Click Overview, and then click the Select button. In the Overview Reports dialog box, click Project Summary, and then click Select. In the Print Preview window, click the upper half of the page with the mouse pointer. On the Print Preview toolbar, click Close 13

Formatting and Printing Reports Next, you will preview and edit a different report. Click Assignments, and then click Select. In the Assignment Reports dialog box, click Who Does What When, and then click Select. On the Print Preview toolbar, click the Multiple Pages button. On the Print Preview toolbar, click the Page Setup button. Click the Header tab. On the Print Preview toolbar, click Close. Click Close again to close the Reports dialog box. The Task Sheet view reappears. 14

END of Tutorial 5 15