CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.

Slides:



Advertisements
Similar presentations
Welcome to the Award Winning Easiest to Use & Most Advanced View, Manage, and Control Security, Access Control, Video, Energy & Lighting Systems, & Critical.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
June 2010 At A Glance The Room Alert Adapter software in conjunction with AVTECH Room Alert™ devices assists in monitoring computer room environments as.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
The Interface Solution Experts Intrinsically Safe Design, TCM installs in: Class I, II, & III Div 1 and 2 (Zones 0/1 & 2) Up to 32 Channels.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Cooling Update (May 2011) Tim. Overview From last time – Estimate Power Loads Active components Extraneous heat sources – Develop methodology for exploring.
CEDAR Cooling (CEDAR Meeting 23 rd May 2011) Tim Jones.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
NetVuze Precision Network Meter standalone, easy to use, networked with data logging.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
Electrical Engineering in the Semiconductor Equipment Industry A Look at a Typical Job Description of an Equipment Electrical Engineer Recent Job Description….
BioWin ®. Bio Gas – The alternative energy source of the future! BioWin ® - Bio Gas Analysis of the future!
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
High Sensitivity Smoke Detection
BOE/BME – MDT: DCS For the 2 BOE, DCS needs to handle 2 x 2 HV (1 ch/multilayer) 2x LV 2x JTAG, associated 2 MDMs/ELMBs Monitoring of T, B and CSM sensors.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
What we can resolve and Our experience in the field of industrial solutions.
Scope To develop a interactive electronics control system and fabrication support to design a next Constant Climate Chambers. Existing product with heater,
ELMB miscellanea Dr Zhige (Gary) Zhang. ELMB miscellanea 1)Over voltage protection for analog input 2)Hardware resetting 3)Allocation for RICH2 4)Configuration.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
André Augustinus 16 September 2002 Safety issues.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Scope To convert panel meter based B lood Bank Refrigerator to a dedicated and customized control unit with enhanced feature and automation. Existing product.
Vacuum system.
NA62 – GTK Cooling Station 1 Main characteristics Fluid: C 6 F 14 (fluorocarbon) Operating temperature: -30 °C ÷ -10°C Temperature precision: ±1 K Temperature.
Muon System Safety Issues Burkhard Schmidt.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
NA62 CEDAR PMT Cooling Update Tim. Chiller Investigations Web search identified Huber as one possible supplier – Europe-wide – Popular at CERN UK sales.
Virtual Analyser What is it Have you ever faced an analyser failure that requires a plant shut down to repair & wished that there.
Path The purpose of this project is to design a universal data recording device to monitor the health of a Dresser-Rand compressor during operation. In.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
RPC DSS & DCS Action Matrices Review Anton Dimitrov CMS Action Matrix Review 2015, 06.Mar.2015, CERN, Geneva.
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Helen Heath, Magnus Loutit.  Useful meetings at CERN before Easter ◦ ML and HH met with John Fullerton from BE for practical advice on the CEDAR motor.
KTAG Mechanics, Optics and Cooling Progress and Schedule NA62 CEDAR Meeting 26March20121.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
LOGO Electronic Volume Converter TZ, PTZ ”Flougas-T”
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
NEW RMC Rack Multi Control.
NWU IT-ES/NWU IT-ELD Monitoring systems
PID meeting SNATS to SCATS New front end design
SCADA for Remote Industrial Plant
ATLAS MDT HV – LV Detector Control System (DCS)
Performance of an Automated Water Based Cooling System for CBM MuCh
T-6B On-Board Oxygen Generation System (OBOGS)
Robert Gomez-Reino Garrido
August 23, 2000 R.N. Dubois Dow Chemical
Rapid Automation Design
Accelerator PSS Radiation Monitoring
T-6B On-Board Oxygen Generation System (OBOGS)
Presentation transcript:

CEDAR PMT Array DCS (Tim)

Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs at each light guide – Recent developments (removal of pre-amps and provision of local NINO boards needs some consideration Currently just a ‘monitoring’ system – Any control (eg. chiller) set manually or by dedicated systems (eg. Huber chiller control s/w) 12/12/20112CEDAR DCS

DCS & DSS Assumptions – Some software / hardware system exists to log range of parameters of different types. – Monitored data can be displayed via on-screen panels. – Monitored data logged at intervals to storage – Alarm events Can have different levels of severity Pass through into data stream Require operator to RESET – There exists a separate Detector Safety System Prevents failures causing BIG PROBLEMS! 12/12/20113CEDAR DCS

CEDAR PMT ARRAY DCS 12/12/20114CEDAR DCS

Evolution Removal of pre-amps from light-guide arrays does not eliminate all heat sources (PMTs & custom PMT bases) – Still need (would like) temperature sensor at each light guide position (need to think about location) Local NINO boards – Assume these are mounted within the PMT array enclosure but separated from the Light-guides (eg. on the sides). Assume – Power ~ 30 mW/PMT channel = 8W per side – Two boards – One 4-wire T sensor per board – 4 extra 4 wire T sensors 12/12/20115CEDAR DCS

Inventory of Monitored Parameters ParameterFormatCount CEDAR Gas Pressure2 wire V1 CEDAR Temp4 wire T1 PMT Encl. N2 Flow2 wire V2 PMT Encl. Pressure2 wire V2 PMT Encl. RH2 wire V2 PMT Encl. Temp4 wire T4 PMT Encl. Coolant Inlet Temp4 wire T2 PMT Encl. Coolant Outlet Temp4 wire T2 PMT Light Guide Temp4 wire T8 NINO Board Temp4 wire T4 Chiller Outlet Temp4 wire T1 Chiller Inlet Temp4 wire T1 Chiller Outlet Pressure2 wire V1 Chiller Inlet Pressure2 wire V1 Chiller Flow2 wire V1 TypeCount 4 wire T23 2 wire V10 12/12/20116CEDAR DCS

Alarms Critical – cause immediate power down of all LV & HV systems & automatic call to expert – Chiller Flow LOW – Chiller Outlet Pressure LOW or HIGH – Chiller Outlet Temp LOW or HIGH – PMT Encl. N2 Flow LOW (x2) Warning - – Any (PMT Encl. Temp – CEDAR Temp) LOW or HIGH – Any (PMT Light Guide Temp – CEDAR Temp) LOW or HIGH – CEDAR gas pressure LOW or HIGH 12/12/20117CEDAR DCS

DSS May be more relevant for operation with H2 – but should think about it now Should be a stand-alone system separate from DCS but should also send signal to DCS A DSS alarm should result in an (automated) action which makes the system safe (primary concern is human safety) DSS Inputs – H2 concentration within PMT array enclosures (2) – Enclosure door HV interlock (2) – ? 12/12/20118CEDAR DCS

Remarks Preliminary set of monitoring points defined Need to review to make sure it’s the right list No local DCS expertise – Need advice on DCS signal input modularity and types – Need software support to configure DCS databases & develop display panels, messages, alarm screens, etc.. Would need DCS system operational locally during assembly of PMT arrays to check out individual sensor performance and to estimate suitable monitoring point measurement frequencies. 12/12/20119CEDAR DCS