LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.

Slides:



Advertisements
Similar presentations
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
Advertisements

Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
EN-EL and LS2 Gerard CUMER, EN-EL february Presentation outline 2 Part 1 : Overview of CERN’s electrical network Part 2 : Power Quality _ Statistics.
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
EN-CV interventions during YETS
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Utility Engineers, PC.  Generation  Transmission  Distribution.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
The Technical Network in brief Jean-Michel Jouanigot & all IT/CS.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
TE-CRG Activities D. Delikaris, TE-CRG.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
I. Bergevoet - Training preparation
YETS & LS2 Works EN-EL / Power distribution
CONS and HL-LHC day Analysis of needs from TE-EPC
Situation of the Static Var Compensators at CERN.
CONS and HL-LHC day Analysis of needs from BE-CO
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
TE-MPE LS1 review Vision from EN-EL(CF)
YETS & LS2 Reminder G. Girardot 20 juin 2017.
EN 4946 – Refurbishment of Electrical Substations
the high-voltage network of CERN ToMORROW
Special LS1 day on 12 June 2012, EDMS:
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
the CERN Electrical network protection system
HL Consolidation Day Analysis of needs from BE-ICS
SPS activities during LS2 TE-EPC (Power Converter Group)
EN-CV interventions during EYETS for PS and PSB
YETS & LS2 Works EN-EL / Power distribution
Overview & baseline of LS2 and roadmap for CRG
GIS Portal Racks Project
F Duval, on behalf of EN/EL
Business opportunities related to CERN electrical network
ABP/RTL Main RTL Activities for 2007/8:-
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe and a reliable operation of 7 TeV/beam The goal of LS1 is to implement everything needed for a safe and a reliable operation of 7 TeV/beam

LS1 : EL Upgrade & Consolidation Three different types of activities are planned  The consolidation of the electrical infrastructure  The maintenance of the accelerator infrastructure  A large amount of requests from equipment groups F. Duval - Chamonix Priority Priority 2 Priority 1 & Priority 2 but also Priority 3 & 4 Reliable Operation of LHC Operation of 7 TeV February 8, 2012

Consolidation of electrical infrastructure It is part of a consolidation program which spans over 15 years aiming at substantially increasing the reliability and the availability of the power distribution network. F. Duval - Chamonix It develops around the following three themes: 1.Replace ageing equipment 2.Embed redundancy, secured network, robust failure cause elimination 3.Prepare for future needs ReplacementSPS Power cables, LHC UPSs, BA5 substation ConstructionElectrical substation for the CCC rack room Consolidation66 kV protection, 66 kV substation in Meyrin UpgradeSCADA system February 8, 2012 Consolidation Maintenance Equipment groups

Consolidation of electrical infrastruct ure February 8, 2012F. Duval - Chamonix Example C1 : SPS Power Cables Consolidation Maintenance Equipment groups  Power cables 3.3/18/66 kV, control cables and optical fibres  90 km in 7 km long trenches  Tubes buried in 2011  Cables pulled in 2012  Cables connected and commissioned during LS1  Cost: 17 MCHF  6 FTE

Consolidation of electrical infrastruct ure February 8, 2012F. Duval - Chamonix Example C1 : SPS Power Cables Consolidation Maintenance Equipment groups WHY:  SPS 18 kV network is made of 40 years old cables  Cable screen section has to be increased in order to carry higher currents  Many faulty joints during the past years.  Moisture detected in the screen layer during last repair operations

Consolidation of electrical infrastruct ure February 8, 2012F. Duval - Chamonix Example C1 : SPS Power Cables Consolidation Maintenance Equipment groups

Consolidation of electrical infrastruct ure February 8, 2012F. Duval - Chamonix Example C2 : BE91 Substation Consolidation Maintenance Equipment groups 3.3 kV Diesel power station New building m2 substation in Prevessin  6.5 MCHF  8 FTE  Infrastructure delivered end 2012  Commissioning during LS1 (2013) Partners: EL, CV, Civil Engineering, HSE

Consolidation of electrical infrastruct ure February 8, 2012F. Duval - Chamonix Example C2 : BE91 Substation Consolidation Maintenance Equipment groups WHY:  Increase 18 kV Prévessin distribution  Creation of a secured power station for the SPS and Prévessin  Construction of a new LV substation to ensure full redundant infrastructure (EL + CV) for the CCC

Maintenance of the accelerator infrastructure In addition to the usual periodic maintenance operations and those delayed until LS1, we will address particular and labour intensive activities. These include: the replacement for irradiated cables the replacement of water cooled cable hoses in 3 LHC sectors the cleaning of unused cables in the most crowded areas e.g. SPS-Point 5 the replacement of non radiation-resistant fibres F. Duval - Chamonix 20129February 8, 2012 Consolidation Maintenance Equipment groups

Maintenance of the accelerator infrastructure February 8, 2012F. Duval - Chamonix Example M1 : Replacement of WCC hoses in 3 LHC sectors Consolidation Maintenance Equipment groups Risk of “leakage” due to hoses not conforming to the technical specifications (presence of chlorine and cracks)  Hose of WCC to be replaced in 3 LHC points (4 right, 6 and 8)  Length: 3120 m.  Commissioning and tests.  2 MCHF  3FTE  All LS1 UA83

Maintenance of the accelerator infrastructure February 8, 2012F. Duval - Chamonix Example M2 : Cleaning of unused cables in SPS point 5 Consolidation Maintenance Equipment groups New cabling installations are becoming impossible in several areas  Cleaning list of unused cables with the help of users’ groups  Identify unused cables on site  Disconnect unused cables  Remove unused cables  3.2 MCHF  3FTE  2013

Maintenance of the accelerator infrastructure February 8, 2012F. Duval - Chamonix Example M2 : Cleaning of unused cables in SPS point 5 Consolidation Maintenance Equipment groups

Requests from equipment groups A large amount of user requests have already been made filling almost 100% of our capacity during LS1. But based on the last shutdown, we estimate that only 50% of the requests for LS1 are currently known. Some examples: R2E; relocation of EL equipment and recabling in 2 LHC points. PS Access system (PSS), RF upgrade project in SPS BA3. Linac4 and Transfer line to Linac2 The BE/BI upgrade projects, HIE Isolde, Elena, Video SPS, RF fire brigade, GSM-BTS, DAQ system for CMS and LHCb, ATLAS & ALICE consolidation, Cryo upgrade, etc. F. Duval - Chamonix February 8, 2012 Consolidation Maintenance Equipment groups

Requests from equipment groups February 8, 2012F. Duval - Chamonix Example R1 : relocation of EL equipment and recabling in 4 LHC points. Consolidation Maintenance Equipment groups See M Brugger’s presentation  6 EL sections involved  EL Budget: 5,5 MCHF  8FTE  2013/2014

Requests from equipment groups February 8, 2012F. Duval - Chamonix Example R2 : PSS new PS Access system. Consolidation Maintenance Equipment groups GS/ASE project (P. Ninin)  3,2 MCHF  Cables & Fibres  3.5 FTE  2012/ TT2/TT2 L4 L2/LEIR/SWY/PSR CTF AD/NTO F 37 ISL/TT70 PUITS Génie civil Echelles Proposition de répartition des câbles sur le site

Strategy Because EN/EL will have a huge program of work during LS1, all our projects have been organised so that 1.they can start during the technical stops in 2012 and 2.ideally, only those activities which must take place during a full shutdown are carried out during LS1. Therefore the EL program for the shutdown has commenced early (January 2012) and will be completed later (2015). EN/EL has already started to increase its engineering and technical resources so that newcomers (New contractors as well) will have at least a minimum period of time for training and integration. F. Duval - Chamonix February 8, 2012

… in summary huge load A huge load on EL resources substantial increase of resources A substantial increase of resources to cope with the work which has reached the limit of the supervision capacity of the EL staff not yet known Probably all the needs of the equipment groups are not yet known tough rules of the priority The tough rules of the priority will be applied and some requests will have to wait F. Duval - Chamonix February 8, 2012