PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Software and analysis Malte‘s Garfield isochronal Lines.

Slides:



Advertisements
Similar presentations
1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
Advertisements

E.K.Stefanides March 07, The Muon Spectrometer of the ATLAS detector: progress report on construction and physics studies at the University of Athens.
sTGC for ATLAS Small Wheel upgrade
2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
GEM Detector Shoji Uno KEK. 2 Wire Chamber Detector for charged tracks Popular detector in the particle physics, like a Belle-CDC Simple structure using.
7/5/05,MEG DC,je MEG DC 1.Foils 2.Wires 3.Frames + tools 4.Preamplifier 5.Gas pressure control 6.final.
E-field calculations for the TPC/HBD N. Smirnov Upgrade Working Group Meeting 05/13/03, BNL.
Prototype TPC Tests C. Lu 12/9/98 V = 0. Gas gain test for the low pressure chamber The chamber is constructed with the following parameters: D anode.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
ENGR 225 Section 2.1. Review ~ Force per Area Normal Stress –The average normal stress can be determined from σ = P / A, where P is the internal axial.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Structure Analysis I. Lecture 13 Cables & Arches Ch.5 in text book.
Forced Oscillations and Magnetic Resonance. A Quick Lesson in Rotational Physics: TORQUE is a measure of how much a force acting on an object causes that.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
Drift Chambers and Pattern recognisation  Fabrizio CeiPattern recognition ideas INFN & Pisa University  Hajime NishiguchiKapton foils for DC cathode.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
June 9, 2008What’s a Drift Chamber? Mac Mestayer Drift Chambers: The Science behind the Art What are they? how do they work? ionization of the gas by particles.
17 February 2010DCH Analysis1/22 MEG DCH Analysis MEG Review Meeting 17 February 2010 W. Molzon For the DCH Analysis Working Group.
PHENIX Drift Chamber operation principles Modified by Victor Riabov Focus meeting 01/06/04 Original by Sergey Butsyk Focus meeting 01/14/03.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
Copyright © 2009 Pearson Education, Inc. Applications: Motors, Loudspeakers, Galvanometers.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
STAR Collaboration Meeting Rene Bellwied – Wayne State University July 2004 SVT Calibration and STI tracking status An update of work since the SVT review.
An Integrated Single Electron Readout System for the TESLA TPC Ton Boerkamp Alessandro Fornaini Wim Gotink Harry van der Graaf Dimitri John Joop Rovekamp.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Muon-raying the ATLAS Detector
PrimEx collaboration meeting Energy calibration of the Hall B bremsstrahlung tagging system using magnetic pair spectrometer S. Stepanyan (JLAB)
 A wire 1 meter long carries a current of 5 Amps. The wire is at right angles to a uniform magnetic field. The force on the wire is 0.2 N. What is the.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Calibration Malte‘s Garfield isochronal Lines and drift.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Single tube detection efficiency BIS-MDT GARFIELD Simulation GARFIELD Simulation Anode wire voltage as a function of the distance from the wire Electric.
1 ENE 325 Electromagnetic Fields and Waves Lecture 9 Magnetic Boundary Conditions, Inductance and Mutual Inductance.
 0 life time analysis updates, preliminary results from Primex experiment 08/13/2007 I.Larin, Hall-B meeting.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Particle Tracking for CDC prototype Amangaliyev Temirlan.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
TRIUMF laboratory studies Christopher Hearty University of British Columbia/IPP 27-Sep-2010.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
ICARUS T600: low energy electrons
News from Cracow on the forward tracking
DC56 R&D Goals, Schedule and Status
Entrance Muon Counter (EMC)
Applications: Motors Loudspeakers Galvanometers
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
Cosmic Test Updates Vito Palladino 16/12/2013.
The Compact Muon Solenoid Detector
DCH calibrations 2013 Gordon Lim, UCI.
MEG DC HV supply preamplifier noise and DRS Input attenuation
m -> eg Drift Chambers
MEG II実験 液体キセノン検出器の建設状況
Chapter 28 Magnetic Fields
Status report MEG DC 20/6/06 Test in COBRA Hajime,Matthias,Johny Peter : beam, Wataru : COBRA Necessary Modifications in DC.
Presentation transcript:

PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Software and analysis Malte‘s Garfield isochronal Lines and drift time calibration Calibration of cathode to anode ratio‘s,.... 3)2004 MEG Drift chambers

PSI-21-january-2004MEG Drift chambers2 New foil sample (.25  m Al), ~ 5 x 5 cm good quality 36 kCHF for 40 foils final design 1.Shape of the frame 2.Deformation by mechanical pre-tension Precise measurements (.1 mm) Flexibility in the procedure to digest differences between old and new foil

PSI-21-january-2004MEG Drift chambers3 Tension of the foil must give the same torque as the forces used to pre-tension the frame Constant during manipulation New tool to ‚transport‘ the frame, groove with O-ring around the edge to pump Inner cathode frame

PSI-21-january-2004MEG Drift chambers4 hood frame

PSI-21-january-2004MEG Drift chambers5 Same informations as for the inner cathode modify design of frame, f. ex. He „bag“ at the same pressure as chambers, bubbler,.... !! tool is very efficient !!

PSI-21-january-2004MEG Drift chambers6 Garfield calculation and calibration of drifttime

PSI-21-january-2004MEG Drift chambers7 a)Practically identical in both directions b)Small effect of magnetic field c)Garfield OK to a few %

PSI-21-january-2004MEG Drift chambers8 Wire 1 Wire 2 Plan 1 Plan 4 x 1.10 x 1.05 x 1.00

PSI-21-january-2004MEG Drift chambers9 Norm_cath 1 = ( x1 + y1*sin(  ))*(1 + p1*sin(  ) ) (1) Norm_cath 2 = ( x2 - y2*sin(  ))*(1 + p2*sin(  )) (2) Norm_cath 3 = (x3 + y3*cos(  ))*(1 + p3*cos(  )) (3) Norm_cath 4 = (x4 - y4*cos(  ) )*(1 + p4*(cos(  )) (4) p1,p2,p3,p4 correction for the trackside For each event and each wire: S1 : sin(  from equation 1 C3 : cos(  from equation 3 S2 : sin(  from equation 2 C4 : cos(  from equation 4 Software and calibration Only ratio‘s are important,right-left,anodes-cathode

PSI-21-january-2004MEG Drift chambers10  1 = atan2(S1,C3)  2 = atan2(S2,C4)  m =.5*(  1+  2) Minimize  event( abs( S1-sin(  m) ) + abs( S2-sin(  m) ) + abs( C3-cos(  m) ) + abs( C4-cos(  m) ) +  cath (abs(Norm_cath j -meas j )) Procedure works with defined p1,p2,p3,p4 more to do on minimalisation function Quality of the procedure seen only after fit of trajectories (particularly effects of p‘s)

PSI-21-january-2004MEG Drift chambers11

PSI-21-january-2004MEG Drift chambers12 Plan wires 11 22 Choose the correct combination of and with the Maximum of cos(  1) + cos(  2)

PSI-21-january-2004MEG Drift chambers Design of Prototyp Optimise construction procedure and get all informations for foils and frames access MC (Hajime) to look for alternativ solutions „final“ design test run in summer

PSI-21-january-2004MEG Drift chambers14 1.Non magnetic preamp and cable 2.Anode print test chamber (1:1) no cathode strip Print, non magnetic preamp and cable,...sampling chip Can be modified to have cathode