WHEN AND HOW TO GO TRANSBOUNDARY EFFECTIVE STRATEGIES FOR TRANSBOUNDARY NATURAL RESOURCE MANAGEMENT Harry van der Linde Senior Program Officer Biodiversity.

Slides:



Advertisements
Similar presentations
WCDR Thematic Panel Governance: Institutional and Policy Frameworks for Risk Reduction Annotated Outline UNDP – UNV – ProVention Consortium – UN-Habitat.
Advertisements

Armand Racine Consultant Chemicals Branch
USDA May 21, 2003 Sustainable Rangelands Roundtable.
Good governance for water, sanitation and hygiene services
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Key Messages National Riparian Lands Research & Development Program Assessing Community Capacity for Riparian Restoration.
Scaling-Up Early Childhood Intervention Literacy Learning Practices Maurice McInerney, Ph.D. American Institutes for Research Presentation prepared for.
European Clearing-House Mechanism Portal Toolkit Expert Group Meeting
Strategies and Structures for Research and Policy Networks: Presented to the Canadian Primary Health Care Research Network, 2012 Heather Creech, Director,
INTERNATIONAL UNION FOR CONSERVATION OF NATURE. 2 Implemented in 12 countries of Africa, Asia, Latin America and the Middle East, through IUCN regional.
Best practice partnership models
Capacity Building Programme on the Economics of Adaptation Supporting National/Sub-National Adaptation Planning and Action Building Sustained Capacities.
Country-Level Coordination & the GEF – an Overview.
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
Session 3. National Employment Strategies and Policies: The International Context Makiko Matsumoto Employment Strategy Department, ILO 25 May 2004, Turin.
Intellectual Property and Bilateral Trade Agreements Moving towards effective participation.
Lessons Learned for Strong Project Delivery & Reporting Sheelagh O’Reilly, Kristin Olsen IODPARC Independent Assessors for the Scottish Government IDF.
Summary Report of CSO Meeting GEF Expanded Constituency Workshop (ECW), Southern Africa 15 th July 2013 Livingstone, Zambia (
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
Problem Definition Exercise. U.S. Fish & Wildlife Service General Summary Responses from ½ of those surveyed (n=14/31) Broad and narrow in scope Narrow.
IWRM PLAN PREPARED AND APPROVED. CONTENT Writing an IWRM plan The content of a plan Ensuring political and public participation Timeframe Who writes the.
Outline 1.Background to the concept 2.Justification for the proposed TBCA 3.Proposed TBCA delineation 4.Possible institutional and management frameworks.
Sub-Regional Workshop for GEF Focal Points in Asia Bangkok, Thailand 7-8 April 2009 Tracking national portfolios and assessing results.
Changing institutional landscapes for wind power implementation. an international comparison Aberdeen, February 21 st 2008 Seminar: “Explaining National.
Critical Role of ICT in Parliament Fulfill legislative, oversight, and representative responsibilities Achieve the goals of transparency, openness, accessibility,
1. 2 Why is the Core important? To set high expectations –for all students –for educators To attend to the learning needs of students To break through.
Theme III Introducing Greater Impact Orientation at the Institutional Level Group 6.
BALANCED SCORECARD WORKSHOP ROLLOUT FOR SOUTH AFRICAN NATIONAL PARKS.
Regional Centers for Results Based Management and Evaluation Capacity Development: Regional Centers for Results Based Management and Evaluation Capacity.
Creating a Learning Community Vision
Outcomes of the 16 th Regional Disaster Managers Meeting held from 9 th – 11 th August 2010 Presentation to the Pacific Humanitarian Team Monday 6 th December.
Overview of Integrated Landscape Land Use Planning Mike Chaveas, US Forest Service International Programs CARPE Inception Workshop Yaoundé, Cameroon February.
BALANCED SCORECARD WORKSHOP ROLLOUT
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
Development and Transfer of Technologies UNFCCC Expert Workshop On Technology Information Technology Transfer Network and Matchmaking Systems: a LA & C.
Improving Coverage and Management Effectiveness of the Protected Area System in the Republic of Moldova Maria NAGORNII Head of the Analysis, Monitoring.
Presentation Title Capacity Building Programme on the Economics of Adaptation Supporting National/Sub-National Adaptation Planning and Action Economics.
European Commission Environmental cooperation in the Mediterranean June 2009.
Country Presentation- GEF Operational Focal Point, Sri Lanka GEF Sub-Regional Workshop 2-3 December 2007, Bali, Indonesia Anura Jayatilake Director, Environmental.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW Meeting, April – May 2013.
1 PROPOSED GCOS DONOR FUND A Progress Report to SBSTA Intersessional Meeting 2 June 2003 S L Barrell Australia.
9 December 2005 Toward Robust European Air Pollution Policies Workshop, Göteborg, October 5-7, 2005.
NCSA AS A TOOL FOR INTEGRATED ENVIRONMENTAL MANAGEMENT (ARMENIA EXPERIENCE) Anahit Simonyan June, 2004 Bratislava UNDP ARMENIA.
April_2010 Partnering initiatives at country level Proposed partnering process to build a national stop tuberculosis (TB) partnership.
Presented by: Steve Litke, Fraser Basin Council Winnipeg, Manitoba June 18, 2012 Collaborative Approaches to Watershed Governance – Lessons from BC.
The ILO’s approach to Decent Work for Young People Giovanna Rossignotti Coordinator Youth Employment Programme Course (A300850) - Trade union training.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Optimising results of protected area management efforts – a capacity building workshop Sportsman’s Arms Hotel, Kenya 27 th Nov – 1st Dec.
Faisal Naru Head of Better Regulation DAI Europe Ltd November 2007 Washington London Johannesburg Ramallah RIA – An Art and not a Science.
Integrating GEF in Environment and Sustainable Development Plans and Policies - – Jamaica’s Experience GEF CSP Sub-regional Workshop for Caribbean Focal.
CAPACITY DEVELOPMENT FOR POLICY MAKERS TO ADDRESS CLIMATE CHANGE: Lessons learned from Ecuador Carola A. Borja, Undersecretary of Climate Change Ministry.
UNDP Current and post-2015 Climate Change Support Jan Kellett, Bureau for Policy and Programme Support Presentation, ACP, October 2015.
WCPA Best Practice Protected Area Guidelines on transboundary conservation: Key concepts Presenting IUCN WCPA BPG on transboundary conservation WPC, Sydney,
The World Bank’s Experience with Country Environmental Analysis (CEA) Sub-Regional Workshop for GEF Focal Points Europe and the CIS 7-8 March 2007, Istanbul.
Theme 2 Developing MPA networks Particular thanks to: Theme 2 Concurrent Session Rapporteurs, Dan Laffoley, Gilly Llewellyn G E E L O N G A U S T R A L.
A STRATEGY FOR REDUCING DEMAND IN ILLICIT PRODUCTS FROM ENDANGERED SPECIES Background: Why reduce demand? Expert Workshop outcomes Strategy principles.
ELEMENTS OF STRATEGY FOR ACHIEVING SOCIAL PROTECTION FLOOR Global Network, Cape Town 7 December 2012 BY AFRICAN LABOUR RESEARCH NETWORK (ALRN)
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
Strategies for making evaluations more influential in supporting program management and informing decision-making Australasian Evaluation Society 2011.
THE SECURITY SECTOR REVIEW PROCESS. ISSUES Understanding: -Scope: What are the elements of a SS Review? -Need: Why review the Security Sector? -Process:
FAO Turkey Partnership Programme (FTPP) FAO Final Evaluation of the FTPP Summary for FTPP Programming Meeting, 14 December
Managing the National Communications Process UNFCCC Workshop on Exchange of Experiences and Good Practices among NAI Countries in Preparing NCs September.
“DEVELOPMENT OF A NATIONAL ICT POLICY ICT Policy in the ECTEL Member States Mr. Donnie Defreitas MSc, (Hav.), ECTEL Caribbean Internet Forum Bay Gardens.
Local Area Management Project (LAMP) SSMR Inception Workshop Centre for Resource Management and Environmental Studies (CERMES) University of the West Indies,
USAID and National Adaptation Plans John Furlow Jonathan Cook E3/GCC Office 1.
Agriculture in Australia Agriculture in Australia utilises a large proportion of the country’s natural resources. Agricultural activity is undertaken on.
Developing a Monitoring & Evaluation Plan MEASURE Evaluation.
THE VIRUNGA-BWINDI TRANSBOUNDARY STRATEGIC PLAN
Forest and Landscape Restoration (FLR)
Presentation transcript:

WHEN AND HOW TO GO TRANSBOUNDARY EFFECTIVE STRATEGIES FOR TRANSBOUNDARY NATURAL RESOURCE MANAGEMENT Harry van der Linde Senior Program Officer Biodiversity Support Program

Acknowledgements yThe Biodiversity Support Program (BSP) is a consortium of World Wildlife Fund, The Nature Conservancy, and World Resources Institute, funded by the United States Agency for International Development (USAID). This product was made possible through support provided to BSP by the Global Bureau of USAID, under the terms of Cooperative Agreement Number DHR-A (funding for the Southern Africa study came from the USAID - Regional Center for Southern Africa (RCSA)), and by the Africa Bureau of USAID, under the terms of Cooperative Agreement Number AOT-A yThe opinions expressed herein are those of the authors and do not necessarily reflect the views of USAID. yContributions from many experts and organizations in Africa and beyond.

Contents  Context of TBNRM  Set-up of the BSP project  When to go transboundary?  How to go transboundary?  Future for TBNRM?  Conclusion

Interest for TBNRM  Interest by local communities  First International Peace Park in 1932  Now 169 transboundary protected area complexes worldwide  Large regional economic development initiatives  Political stability – Peace Parks Initiatives  Broad landscape approaches by international conservation organizations  International conventions and funding mechanisms

Ecoregions of Africa

Distribution of Elephants in Southern Africa

Project Approach yInitiate analysis of TBNRM as approach for natural resource management and conservation yReviews and case studies in four regions in sub-Saharan Africa. yPan-African analysis yA pan-African workshop yPreparation of pan-African guidance

Various Motivations for Involvement...  Diversity in interests  Multiple opportunities: -ecological -social and cultural -economic and financial -political institutional

TBNRM Definition ‘Any process of collaboration across boundaries that increases the effectiveness of attaining Natural Resource Management or Biodiversity Conservation goal(s).’

When to go Transboundary?  Options: to work nationally, exchange information, work transboundary  When the whole is greater than the sum of the parts  A proposed mechanism to analyze: -Place in ecological spectrum -Threats and opportunities  Sometimes most efficient, sometimes not!  To be applied to each NRM and biodiversity objective  To be applied towards new and ongoing initiatives

Further Scoping Analysis Stakeholder Identification and Consultation Yes No Yes Initial Scoping Transboundary Vision Consultation Development of a Transboundary Vision Stay National

TBNRM-Initiative Cycle Analyze Data and Communicat e Results Implement Management and Monitoring Plans Develop a Transboundar y Monitoring Plan Develop a Transboundary Management Plan Transboundar y Vision See Figure Iterate Use Results to Adapt and Learn Adapted from Margolius and Salafsky, 1998, to the context of TBNRM Transboundary Initiative Cycle

How to go transboundary  Key elements to the process of identification, planning and implementation:  levels to be involved (stakeholder identification, consultation and involvement)  the need for and variety of agreements  communication  organizational and individual capacity (roles of stakeholders in the process) enabling conditions

Context of these key elements of the process  Some are applied on a national level, but a transboundary approach adds additional challenges and complexities  Flexibility of application – what is useful all depends on the situation  Very much scale and time dependent  It should be an adaptable, flexible process and iterative

Levels- Some Lessons  What can be achieved at local level only is limited; more ambitious TBNRM goals require involvement of a wider range of levels  Communication is essential within and between levels in each country, and with the equivalent levels across the international border  TBRNM is more efficient if it involves the simplest scale possible to achieve the goals and it is probably more effective if it is not driven from the top.

Lessons, Con’t  Stakeholder involvement: -two levels apply: parallel in-country and across the border -exact ‘mirror-image’ counterpart organizations may not exist across the border  it is advantageous to build on existing relationships

Agreements  For different purposes  Different types and levels  Some lessons:  Negotiating agreements is costly and time-consuming; purpose should be very clear  Agreements can increase the sustainability of outcomes by making the process less dependent on the immediate action of individuals  Need for adaptive management – may develop over time from informal to formal

Communication  Obtain a common focus across sectors, within levels, within organizations, up and down levels and across countries  Share information widely  Keep up the dialogue when it becomes hard  Communication - some lessons:  A common focus and vision, early on in the process  Transparency Appropriate messages to a broad target audience – involve other sectors and disciplines

Organizational and Institutional Capacity  A critical minimum capacity on national levels  Learning by doing  Role for regional institutions?

 Capacity-Some lessons:  In case of insufficient national capacity – build first, or adjust expectations  An outside facilitator can support the process in case of weak organizations on both sides of border – technical and financial  Develop existing institutions to include TBNRM or establish new ones

Constraints and Enabling Conditions  TBNRM initiatives in a broader ‘environment’  An enabling condition is a condition that facilitates, supports or is essential for successful TBNRM  Is relevant in an ecological, social and cultural, economic-financial, political and policy, institutional context  Which are relevant varies between initiatives, scale and over time

Future of TBNRM- Gaps and Needs  Economic valuation of TBNRM  TBNRM's role in economic development  Financing of TBNRM initiatives  Cross-sectoral collaboration  Use of regional and international fora  Mechanisms for learning, support and networking

Conclusions  TBNRM is a viable option for NRM and biodiversity conservation  But, if conditions for internal, national NRM are absent, the situation will not be improved by going transboundary  TBNRM should be seen as a process, not a fixed approach – there is no blueprint and flexibility and adaptability is key  It is a relatively new approach - need to learn from each other