Train timetables Time real life problems – Year 4/5.

Slides:



Advertisements
Similar presentations
Period 5 Grammar: Past Perfect tense You had already cleaned the blackboard before I entered the classroom. What happened first? A: You cleaned the blackboard.
Advertisements

School Bus Safety.
Bus timetabling and scheduling ITEC 810 Project Supervisor: Stephen Smith Xinru Ma ( )
Give a definition from the following words. The surface; the trains; a railway system; run; under; in which; of the ground A railway system in which the.
Siemens Education Clean silent trains.
A group of 68 students went to an amusement park
Mike is a middle school student. His class begins at _________________. So he always gets up ____________. He often leaves home _____________. He usually.
Interpreting Graphs and Tables
CALCULATING TIME, SPEED & DISTANCE Time / Distance / Speed Calculations.
Paragraph Writing.
Simulation with ArenaChapter 2 – Fundamental Simulation Concepts Discrete Event “Hand” Simulation of a GI/GI/1 Queue.
If 2 wave trains, launched at the same moment in time, travel the same distance to reach the same point, they will arrive If one has farther to travel,
CTA Improvement Project By: Gwendolyn Brooks College Prep.
24 Hour Clock Activities.
Access to Princess Park By Public Transport GLOBAL VILLAGE MULTICULTURAL FESTIVAL.
Hampshire Learning Disability Partnership Board Representatives Transport Report Handout July 2013 Winchester and District Advocacy Project.
A Trip to the Zoo Your Task: Plan an excursion to the Zoo By the end of this unit, you will be able to: Read a timetable Calculate duration of time Record.
Metro Scheduling By Philip Anderson & Liza John. Metro Scheduling Case Study Real world Practice.
DP3, Part I Sara Kalantari WHO: PNA’s WHAT: need for assistance WHERE: CalTrain.
Writing Improper Fractions EXAMPLE 1 Using the Least Common Multiple EXAMPLE 1 Model Trains Two model trains share a station, but they run on separate.
Traffic Management System And Passenger Information System Western Railway Experience.
ML Approaches – Conceptual Stuff Nitin Kohli DS W210 – Capstone Project.
Tutor : Chen Yan Wuzhong Vocational Education Center School 04/23/2010.
Stockport Key Centre Analysis 1 This PowerPoint presentation has been created to accompany GMTU Report 947 – GMATS Stockport Key Centre report Whereas.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Timetabling Components Unit 5: Staff & Fleet Scheduling.
Uncertainty in Trip Planning in Transportation Systems A. P. Sistla (Joint work with Booth, Wolfson and Cruz)
Walking between home and school. Leaving home in the morning on your walk to school.
Training begins in… 15:00 minutes Training begins in… 14:00 minutes.
Higher Education Precinct Analysis 1 This PowerPoint presentation has been created to accompany GMTU Report 1055 – GMATS Higher Education Precinct report.
Birmingham – Stratford – Banbury – High Wycombe – London Marylebone Issue 30 – 5 December 2014 Service information for December 2014 Every Saturday and.
Pg. 40 #13-24 ANSWERS.
Upper Key Stage 2 Calculation Workshop. Year 5 Addition and Subtraction Addition Your child will be using the column method when adding whole numbers.
Trafford Key Centre Analysis 1 This PowerPoint presentation has been created to accompany GMTU Report 1000 – GMATS Trafford Key Centre report Whereas report.
 time flies  This common idiom means that time passes quickly.  'Time flies when you are having fun.'
Quality indicators impact on overall citizen satisfaction BEST Survey 2014.
40 Minutes Left.
Minutes Left:
TRAIN PREPARATION PROCEDURE TRAIN IS TURNED “ON” PROCEED TO DEPOT SUPERVISOR AND GET DAILY OBSERVATION REPORT FORM GO TO THE ASSIGNED 3-CAR TRAIN TURN.
Direct train link to Manchester Picadilly Use this for GMex and Portland Street Premier Travel Inn’s WAF organised shuttle – Terminal 3 Arrivals hall –
In the underground-ground Under ground there are trains, In the trains – trains There are people – people People travel somewhere, Where they work, Where.
Excursion to Wynnum park By Eh San. At 9:30am, we met other students at South Bank bus stop.
What You Need to Know. Entering the Exam Room What is allowed… Bottled water… put on the floor, not the table Pencils/erasers for multiple choice exams.
In the underground-ground Under ground there are trains, In the trains – trains There are people – people People travel somewhere, Where they work, Where.
WELCOME. TEACHER’S PROFILE: Safiqul Islam ID No. 21 Assistant Teacher (Computer) Kutubpur Rowshan High School Sakhipur, Tangail.
TRANSPORTATION TRAVELING BY BUS, TAXI, SUBWAY. BUS A popular way to travel in cities is on a bus. “How did you get here today?” “I took a bus.”, “I traveled.
12hour and 24hour time Can you convert the times?
How to Read a Bus Schedule
TRAVELLING Коровина Е.И. Учитель английского языка ГБОУ СОШ №1387.
Programme.
Tutor:Chen Yan Wuzhong Vocational Education Center School 04/23/2010.
3.9 Continued….Word Problems Involving Proportions
The Freedom Riders We are exploring: The events of the Freedom Rides
Unit 9 Wheels Lesson 2 On the move 桐城中学 宋 笑.
1-9 Interpreting Graphs and Tables
Type Title Here Directions: Use index cards or Avery Business Card templates to create game cards . Players roll the die, take a card, answer the question.
Arrivals09:41 Please do not leave your baggage unattended.
Title: Mr. Santoro Gets Delayed
UNIVERSITY EXAM: EXAMINATION RULES FOR STUDENTS
Discrete Event “Hand” Simulation of a GI/GI/1 Queue
□ + □ = □ □ - □ = □ □ - □ = □ 1 1 ____ten and____one make ____. 10 1
I dare to take the train First name
Creating Time & Space to Study
A film starts at 13:45 and lasts for 1 hour and 35 minutes
I wake up at 7. 30am. It takes me 45 minutes to get ready for school
Selected Topics in Project Management “John goes to Town”
Timetables.
A Day at the Zoo.
Read timetables using 24-hour clock Calculate time intervals
Timetables – Bingo – Only Answers
FULL STEAM AHEAD (УМК «Spotlight», 8 класс)
Presentation transcript:

Train timetables Time real life problems – Year 4/5

The timetable Departure - Manchester Destination - Liverpool 109:5511:15 210:25? Part 1. Each train has a Starting station (Departure) and a starting time. At the other end of the table each train has a finishing place (Destination) There are two trains on this timetable, but there can be as many as you want. Watch out for stations in-between the departure and destination stations. Departure - Manchester Destination - Liverpool 109:5511:15 210:25?

Direct Trains Departure - Manchester Destination - Liverpool 109:5511:15 210:25? 1.How long will passengers have to wait for the next train if they miss the first one? What time will train 2 arrive at Liverpool? How long does it take train 1 to reach Liverpool? Challenge! Each train takes 20 minutes to change driver and take on new passengers. What time would you expect train 1 to get back at Manchester? Part 1.

Trains with one stop Departure - Manchester 1 st stop – Stockport Destination - Liverpool 113:5514:00? 214:25?14:45 314:55?? Fill in the blank spaces on the timetable, then use it to answer these questions: 1.How long does it take to travel from Stockport to Liverpool? 2. What time would you expect a fourth train to reach Liverpool? Part 2.

Trains running late! Part 3. Departure - Manchester 1 st stop – Stockport Destination - Liverpool 113:5514:0014:15 214:2514:3014:45 314:5515:0015:15 Train one arrived at Stockport at 14:33. How much earlier will train two need to set off from Liverpool so that it arrives on time? Train left at the normal time, but was held up at Stockport for 9 minutes. What time did it arrive? Due to leaves on the line each train is now running late!