Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.

Slides:



Advertisements
Similar presentations
Force Majeure & payment of Exit Charges Jeff Chandler - 6 th October 2011 Transmission Workgroup - Elexon 1.
Advertisements

NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Enduring Offtake Arrangements including an Off-Peak Interruptible Service Peter Bolitho.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Review Group 221 Session 3: 13 October Introduction  During this presentation we will seek views on the following questions.  What should the.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Connected System Exit Points Options for strategic regime change Chris Warner.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Wales & West Utilities Entry – Standard Special Condition D12
Transitional Exit Capacity Proposals -Update
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Exit Capacity Release Methodology Statement
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
UNC Modification Proposal 0373
Capacity Methodology Statements: Impact of Mod 452
Capacity Methodology Statements
Connected System Exit Points Administration Options
7th July 2011 Transmission Workgroup - Elexon
Chris Warner Network Code Manager
Proposer: Malcolm Montgomery Panel Date: 20/10/16
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Connected System Exit Points Administration Options
MOD National Grid NTS Initiated Flow Swaps
Long Term Non Firm Capacity Update
Transmission Workstream – Partial Assignment
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Transmission Workstream – 6th July 2005
Review Group 221: Review of Questions from Session 2
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Presentation transcript:

Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose

2 Transitional Period Mod 198 extended the transitional period out to Oct 2012 Third time the sunset clauses have been extended GEMA currently expect to reconsider 116V (and all its variants) along with 195/195A in Nov 08 but: –this date could slip –NG remains concerned over the timelines for implementing any of the mods for Jul 2009 –possibility of further appeals Transitional period could therefore extend beyond Oct 2012 User’s will continue having to book NTS Exit Capacity subject to the UNC and NG’s ExCR Methodology Statement during this time.

3 ExCR & UNC – Shipper User Latest ExCR (currently awaiting Ofgem determination) states that: –where existing exit capacity is available it will be allocated on a first come first served basis. Shipper Users shall request it in accordance with UNC section G2 and B3.2 –where incremental exit capacity is required within investment lead times it will be allocated only if a safe operating system can be maintained and if analysis demonstrates that it is economical to do so –where incremental exit capacity is required beyond investment lead times an ARCA will be offered providing specific reinforcement is required and the incremental request is for greater than 20m therms p.a. –incremental exit capacity (where no reinforcement needed) cannot be booked more than 6 months prior to first gas flowing UNC: –Section B3.2.2.b states Shipper Users are not allowed to apply for NTS Exit Capacity at a NTS CSEP earlier than 6 mos prior to the proposed date of registration, but makes no mention of any linkage to first gas flow –Section G2 applies to new NTS Supply Point Components but makes no mention of a 6 mos restriction. New site can only be registered once on SPR

4 Shipper User Risks Not entirely clear what the basis for Shipper Users booking NTS Exit Capacity is during the transitional period: –NTS CSEP v NTS Supply Point Component –new NTS Exit Point v incremental increase at existing NTS Exit Point –6 mos prior to proposed registration date or first gas flow date –when new site can be recorded on SPR and interaction with NExA and meter Shipper Users are exposed to the risk that exit capacity that exists when they start building their facility (power station/storage site/interconnector) will not be available when they come to commission their facility. If NTS reinforcement is required an ARCA will alleviate the risk of capacity not being available when required. But: –generic ARCA terms make the Shipper User liable for the full cost of reinforcement unless it can successfully appeal it to Ofgem using previous precedents. –ARCA only applies if demand > 20m therms p.a.

5 ExCR & UNC – DNO User DNO Users acquire NTS Offtake Capacity in accordance with the ExCR Methodology Statement and UNC Section B6 DNO Users subject to the same ExCR restrictions as Shipper User except DNO Users can book incremental capacity outside investment lead times if NTS reinforcement is not required. Section B6: –requires NG to issue an OCS for Gas Years throughout the transitional period –allows DNO Users to apply increase Offtake Capacity for any Gas Year shown on the OCS in each July Application Window –allows DNO Users to increase Offtake Capacity for any Gas Year shown on the OCS out with the July Application Window in response to a new or additional capacity request at an LDZ Supply Point

6 Proposal (1) UNC should specify the circumstances whereby NG will be required to enter into an ARCA with a Shipper User or non code party for NTS Exit Capacity at a new NTS Exit Point. This will provide greater clarity as to when capacity can be registered/reserved and remove the risk that existing capacity may not be available at the point of commissioning. Circumstances where an ARCA would be required to be offered under the UNC are: –specific reinforcement is required as is currently the case, except minus the 20m therm p.a. threshold –existing firm exit capacity is available or specific reinforcement is not required but a Shipper User has demonstrated to NG that its relevant consents have been secured, or are securable, and that its relevant construction programme is on target to offtake gas by the capacity request date This will provide greater clarity and flexibility in when capacity can be reserved and should ensure that existing firm capacity is only reserved in advance only where it can be reasonably demonstrated that a facility is going to be built that will use it.

7 Proposal (2) The UNC would also reference the high level terms which might be expected to be included within such an ARCA such as: –duration and registration dates –scheduling and rescheduling of any specific reinforcement –NG’s obligations and liabilities when making capacity available –Shipper User’s obligations and liabilities to pay charges and provide security –assignment, force majeure and other boilerplate conditions –site specific offtake parameters NG would offer an ARCA within 10 business days successful demonstration and a Shipper User’s would have 20 business days to accept it. In the event the terms were deemed unreasonable it could still be appealed to Ofgem. NG would not offer an ARCA to a Shipper User with a credit restriction. Any such ARCAs would be valid only during the transitional period and this mod would not affect the terms of any existing ARCAs. NG might be expected to amend the terms of their ExCR to reflect this mod and may also reconsider the terms of the current generic ARCA to align the user commitment therein with that included in the enduring offtake reform Modification Proposals.