Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, 2004 1 EVLA Monitor & Control.

Slides:



Advertisements
Similar presentations
Test Builder & Test Executor Sonja Vrcic Socorro, December 12, 2007.
Advertisements

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
5-6 Dec, 2006EVLA M&C Critical Design ReviewRich Moeser 1 User Interfaces Rich Moeser.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Project Presentation eProcurement System. M.TECH S16- Team S03 Institute of Systems Science Table of Content Project Background Project Requirement User.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Transition Operations Claire Chandler.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Software Status Sonja Vrcic Socorro,
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
EVLA Monitor & Control Transition System Software
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Monitor & Control EVLA Advisory Committee June 10 – 11, 2002.
Output Formats Part I Bryan Butler NRAO Oct-31EVLA Correlator f2f2 Overview 2 types of data: –Monitor data - of interest to engineers and system.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Interim Data Capture & Format (IDCAF) Walter Brisken 2006 Dec 6.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
Bill SahrEVLA Advisory Committee Meeting September 8-9, EVLA Monitor & Control.
Overall Data Processing Architecture EVLA timeline and priorities.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
Software Overview Sonja Vrcic
Monitor and Control Software
EVLA Overall Software Design
EVLA Computing Software Overview.
Chapter 1 (pages 4-9); Overview of SDLC
Antenna Monitor & Control Subsystem Engineering Requirements
Budget, Schedule, Contingency
Software Requirements
EVLA M/C Software PDR, 14 May 2002
VLA to EVLA Transition Plan
Bryan Butler (for Bill Sahr)
EVLA Advisory Committee Meeting
Software Requirements
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
Charge to the Review Panel
EVLA Monitor & Control System
Gustaaf van Moorsel September 9, 2003
Software Requirements
Operations Software Bryan Butler.
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Advisory Committee Meeting, March 19-20, 2009
EVLA M&C Components Observation Executor, Interim & Final Obs2script
EVLA Monitor & Control Bill Sahr NSF Review May , 2006
Requirements Bryan Butler.
Presentation transcript:

Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control

Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, Topics The Overall Design Module Interface Board Hardware & Software The M&C Transition Plan M&C Subsystem Design

Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, Overall Design In June 2004 a high-level design for all EVLA software was completed This design is presented in a document entitled “ EVLA High Level Software Design” It is document # 33 on the EVLA Computing Working Documents web page: workdocs/index.shtm

Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, Overall Design Transparency of Data Flow Diagram

Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, Module Interface Board Hardware The Module Interface Board (MIB) is the means by which EVLA antenna subsystems will be monitored and controlled. The hardware design has been finalized and is ready for quantity production. An M&C Hardware and MIB Software CDR was held on 10/20/2004 No significant impediments to quantity production of the MIB were found The report of the review panel for the CDR can be found on the CDR web page:

Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, Module Interface Board Software Uniform, self-describing interface to all MIB-connected devices. Simple [set, get].. syntax Consists of a generic framework common to all MIBs plus module specific software Framework services include a Service Port, Data Port, Alarms & Alerts, Error Messages, Logging Messages Documents describing the Framework SW, Service Port and Data Port are available on the Computing Working Documents web page:

Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, M&C Transition Plan The M&C Transition Plan referred to here is a plan for software development that accommodates the transition from the VLA to a hybrid VLA-EVLA array, and then to the EVLA. The document is entitled “VLA/EVLA Transition Observing System Development and Re-engineering Plan”, dated September 04, 2004, written by Tom Morgan of the ECD. Available on the Computing Working Documents web page: as document # 37

Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, M&C Transition Plan The M&C Transition Plan consists of 7 phases Phases I - III lead to the elimination of the Modcomp computers Phase IV develops support for on-the-sky testing of the WIDAR correlator prototype Phase V develops support for on-the-sky-testing of the production version of the WIDAR correlator At the end of Phase VI, shared risk observing by external users will be supported Phase VII completes EVLA support for regular science observing using EVLA antennas and the WIDAR correlator

Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, M&C Transition Plan Phase I Primary Objectives (Jan 31, 2005) Basic software in place for use of one or more EVLA antennas in the VLA for observing Phase II Primary Objectives (Q2 2005) New VLA correlator controller Begin work on control of VLA antennas by EVLA Begin migration of Antsol, Pointing Offsets & Archiving Phase III Primary Objectives (Q4 2005) Transfer all remaining functionality to EVLA systems Retire the Modcomps and the Array Process

Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, M & C Subsystem Design Synched with the phases of the M&C Transition Plan M&C Transition Plan software will serve as testbeds for subsystem design The mature form of the EVLA software must grow from the M&C Transition Plan software –To enable continuous operation of the array –Reasonable software development scenarios –Schedules –Manpower

Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, M &C Subsystem Design At end of Phase I of M&C Transition Plan (1/31/2005) Designs for production versions of Observation Executor, Antenna Objects, CALC Design for User Interfaces to non-mib processes A more detailed description of remaining subsystems and their technical requirements A software development plan that includes task breakdowns, task interdependencies, time allocations, and resource allocations.

Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, M & C Subsystem Design During Phase II of M&C Transition Plan (Q2, 2005) Refine subsystem designs developed during Phase I Specify designs for some of the remaining subsystems –Antsol as a Telcal precursor –Control of VLA correlator –VLA Data Capture & Format (DCAF) as EVLA DCAF prototype –Archiving (VLA format) by EVLA system Revise and update the SW development plan generated at the end of Phase I of the M&C Transition Plan