Examination of Corrupted Data in the Tile Calorimeter Stephanie Hamilton Michigan State University The ATLAS Experiment Supervisor: Irene Vichou (U of.

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
S 1 Summer Student Sessions 13 August 2008 Chew Soo Hoon University Of Malaya, Malaysia Jan Stark LPSC, Grenoble, France
Off-axis Simulations Peter Litchfield, Minnesota  What has been simulated?  Will the experiment work?  Can we choose a technology based on simulations?
Error Propagation. Uncertainty Uncertainty reflects the knowledge that a measured value is related to the mean. Probable error is the range from the mean.
Photon Polarization Analysis Bill Bugg Data selection: 1)PCALE Max cut 2)Visual Inspection. For every cycle of every run we plot and examine a series of.
Far Detector Data Quality Andy Blake Cambridge University.
1 G4MICE downstream distributions G4MICE plans Rikard Sandström Universite de Geneve MICE collaboration meeting 27/6-05.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
An Online Calorimeter Trigger for Removing Outsiders from Particle Beam CalibrationTests Denis O. Damazio José Manoel de Seixas Signal Processing Lab –
1 Hadronic In-Situ Calibration of the ATLAS Detector N. Davidson The University of Melbourne.
Update FTK Meeting 07/13/06 Erik Brubaker U of Chicago.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Introduction to Hadronic Final State Reconstruction in Collider Experiments Introduction to Hadronic Final State Reconstruction in Collider Experiments.
In order to acquire the full physics potential of the LHC, the ATLAS electromagnetic calorimeter must be able to efficiently identify photons and electrons.
Identifying anomalous strips David Stuart, Noah Rubinstein University of California, Santa Barbara June 18,
Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter As of 9am 05/28/2003.
Compact TileCell for the ATLAS ESD (status) ( Continued from 29/09/04 TileCal Software meeting )  The compactification option implemented for TILE use:
Search For the Higgs H o ->ZZ*->bbll Philip Davis (NMSU) Mentor: Dr. Teuscher (U of T) Aided by Christophe Le Maner (U of T)
Paris, July 17, 2009 RECENT RESULTS OF THE IGEC2 COLLABORATION SEARCH FOR GRAVITATIONAL WAVE BURST Massimo Visco on behalf of the IGEC2 Collaboration.
Ian Ross Rose-Hulman Institute of Technology Mentor: Dr. Richard Teuscher University of Toronto ATLAS Group ATLAS Calorimeter: Cosmic Ray Commissioning.
C.ClémentTile commissioning meeting – From susy group talk of last Wednesday  Simulation and digitization is done in version (8) 
Google C++ Testing Framework Death Tests. In many applications, there are assertions that can cause application failure if a condition is not met. ◦ Square.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
0 Status of Shower Parameterisation code in Athena Andrea Dell’Acqua CERN PH-SFT.
NA48-2 new results on Charged Semileptonic decays Anne Dabrowski Northwestern University Kaon 2005 Workshop 14 June 2005.
Pavel Šťavina, Bratislava 2004 Slovak contribution to experiment ATLAS  Even though Slovakia is small country with limited finances we have fulfilled.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Ian Ross Rose-Hulman Institute of Technology Mentor: Dr. Richard Teuscher University of Toronto ATLAS Group ATLAS Calorimetery: Cosmic Ray Commissioning.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
Preliminary analysis of p-Pb data update n. 6 Lorenzo Bonechi LHCf Catania meeting – 19 December 2013.
24/06/03 ATLAS WeekAlexandre Solodkov1 Status of TileCal software.
Combined HEC/EMEC testbeam data can be read and analyzed within the ATLAS Athena framework A “cookbook” gives an introduction for how to access the data.
EXAMINATION OF CORRUPTED DATA IN THE TILE CALORIMETER Stephanie Hamilton Michigan State University The ATLAS Collaboration Supervisor: Irene Vichou (U.
Hadron energy reconstruction in ATLAS Ongoing work (Per, Kerstin and C Santoni and V Giangiobbe from C-F): Analysis of combined test beam data: reconstruction.
8/26/02 D0 Calorimeter Task Force Stephanie Beauceron LPNHE - Paris 1 Offline zero suppression Aim: Understand the huge value of Missing E T at 1.5  Principally.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
28 July 2006 CERN REU Status Report 1 Lindsey Gray, University of Florida RCT Trigger Supervisor and Database Project Status Lindsey Gray Advisors: Dr.
Completing the Square. Learning Targets  Learn how to complete the square  This allows us to go from Standard Form to Vertex Form  Solving for x in.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
Bennett Magy 1. T  TeV 2 Neutrinos can’t be detected by the ATLAS detector, but we can still piece them back together 3.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
HEP Tel Aviv University LumiCal (pads design) Simulation Ronen Ingbir FCAL Simulation meeting, Zeuthen Tel Aviv University HEP experimental Group Collaboration.
NIKHEF –D0 meeting, June 6, 2001 Freya Blekman, NIKHEF Amsterdam SMT pedestal management Weekly NIKHEF – NIJMEGEN – D0 meeting June 6, 2001 Freya Blekman.
CALOR April Algorithms for the DØ Calorimeter Sophie Trincaz-Duvoid LPNHE – PARIS VI for the DØ collaboration  Calorimeter short description.
DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 1  Examines  Crate Unpacking.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
Combined HEC/EMEC testbeam data can be read and analyzed within the ATLAS Athena framework A “cookbook” gives an introduction for how to access the data.
AliRoot survey: Analysis P.Hristov 11/06/2013. Are you involved in analysis activities?(85.1% Yes, 14.9% No) 2 Involved since 4.5±2.4 years Dedicated.
06/2006I.Larin PrimEx Collaboration meeting  0 analysis.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
Software Week - 8/12/98G. Poulard - CERN EP/ATC1 Status of Software for Physics TDR Atlas Software Week 8 December 1998 G. Poulard.
Revision Questions Experimentation. 2 Explain Independent variable The variable that is changed by the person doing the experiment. Remember: If I am.
Z & W Boson Reconstruction with Monte Carlo Simulations and ATLAS DATA Adam Lowery Supervisor: Dr. Jonas Strandberg Wednesday, August 11, 2010.
June 2004 ATLAS WeekAlexander Solodkov1 testbeam 2004 offline reconstruction.
Argonne National Laboratory ATLAS Tile Calorimeter Testbeam Pilot Project ATLAS Software Workshop Geneva 2 September 1999 David Malon
Thomas Ruf, CERN EP Experience with C++ and ROOT used in the VX Beam Test Thomas Ruf, CERN, EP  Why? Event structure for VX-data rather complex: raw hits.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
Halina Bilokon, Vitaliano Chiarella, Simonetta Gentile, Giovanni Nicoletti Higgs Meeting 18 April 2006,CERN. Data based method for background subtraction:
Muon Detectors Tile Calorimeter Liquid Argon Calorimeter Solenoid Magnet Toroid Magnets 46m 22m SemiConductor Tracker(SCT) Pixel Detector Transition Radiation.
Matteo Volpi, Luca Fiorini Timing study with Muons at 90º from first beam PRELIMINARY STUDY (Barcelona) 1 Tile Timing Group meeting 17 September 2008.
Check of Calibration Hits in the Atlas simulation. Assignment of DM energy to CaloCluster. G.Pospelov Budker Institute of Nuclear Physics, Novosibirsk,
ATLAS Tile Calorimeter Data Quality Assessment and Performance
on behalf of ATLAS LAr Endcap Group
Electron -converted photon –pi0 discrimination
Hadronic recoil analysis:
Data Analysis in Particle Physics
Rolling Search For a GRB Cascade Signal
IX International Workshop ACAT
Presentation transcript:

Examination of Corrupted Data in the Tile Calorimeter Stephanie Hamilton Michigan State University The ATLAS Experiment Supervisor: Irene Vichou (U of IL, Urbana-Champaign)

My Project (review) Tile Calorimeter in ATLAS detector ▫Negative energy, generally abnormal data  This constitutes about 1% of all data with significant cell energies taken by TileCal Examine several different variables for TileCal corrupted data ▫Test in standard data integrity filters and new tests for cell energy, time reconstruction  How many “bad” events are from known reasons?  How many are from reasons we don’t quite understand yet and escape detection?  Source is largely front end or data transmission issues 19 July

Status as of June 29 Learning to use ROOT and C++ Learning my way around the framework Getting familiar with the way detector performance is analyzed in TileCal In the first steps of developing macros to plot variables I was interested in 19 July

Status as of July 19 Fully developed macro for plotting ▫Through trial and error, determined interesting variables Several plots of variables while implementing different cuts Searching for cases in which the pulse signal from the readout channel is anomalous and variables to detect these cases 19 July

Searching for anomalous pulse signals 19 July To the right is an example of a “normal” pulse signal Since it is normalized, the “0” in this case is normal. I am looking for cases in which there is a zero for any “x” on the graph before normalization and before the background has been subtracted. This would NOT be normal! x x x x x x x

19 July

7 Also checking data integrity variables

Why is my project important? Increase knowledge of the reasons behind TileCal corrupted data Validate criteria that would prevent “bad” event leaks into good quality data Create less headaches for the physicists using this data 19 July

What’s Next? Have been using a small “test” data ntuple (1109 events) to develop my code ▫Move to full data ntuples Examine variables within full ntuples ▫How many bad samples are due to known errors?  These will be taken care of ▫How many involve abnormal times recorded? ▫How many involve abnormal energies? ▫How many involve abnormal values for χ 2 ? 19 July

Adventures Hiking in the Jura, Zermatt, Bern, Geneva, Barcelona… ▫Favorite either Zermatt or Barcelona Rome this weekend (!!!), Paris next weekend Still would like to explore Geneva some more 19 July