Summary of CSC Track-Finder Trigger Control Software Darin Acosta University of Florida.

Slides:



Advertisements
Similar presentations
First Tests of a GTL-Prototype-Card using XDAQ S. Kostner, J. Strauss and A. Taurok (Hephy, Vienna) with help from J. Gutleber (CERN)
Advertisements

GCT Software ESR - 10th May 2006 Jim Brooke. Jim Brooke, 10 th May 2006 HAL/CAEN Overview GCT Driver GCT GUI Trigger Supervisor Config DB Test scripts.
Slice Test DAQ. Two Systems Underway There are essentially two systems being designed concurrently: Trackfinder test, and EMU slicetest. Goals of the.
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
PRS/Muon Activities & Status of the Track-Finder Prototype D. Acosta University of Florida PRS/Muon Group Activities Track-Finder test software status.
Slide 1 Control Software for the CMS Pixel Readout 28 April 2004 R.Stone, Rutgers (J.Doroshenko, DW.Kim, U.Joshi, L.Perera, J.C. Yun, et al) CMS Pixel.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
TB2004 DAQ Code Development Status & Prospect. July 1, 2004TB2004 DAQ Code Development2 Contents 1.TB status –run control –peripheral/FED crate –DAQ column.
Sector Processor 2002 Development and Test Plans Darin Acosta.
A Universal Framework for Data Validation Giovanni Organtini INFN-Sez. di Roma.
SR/SP Project Overview Walk through required on-board functionality and validation checks Latency Interface requirements and validation tests Production.
C.Combaret, L.Mirabito Lab & beamtest DAQ with XDAQ tools.
ODE Workshop, LIP, 07-08/04/05 SRP: Software Irakli MANDJAVIDZE DAPNIA, CEA Saclay, Gif-sur-Yvette, France.
Gregory PawloskiAugust 22, 2002 MPC Testing Progress.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
Monika Grothe, U Wisconsin, CMS week March 2004: Status of RCT software 1 Current status of RCT software Monika Grothe U Wisconsin – Madison CMS week March.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
7. CBM collaboration meetingXDAQ evaluation - J.Adamczewski1.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
1 The TrackFinder GUI D. Acosta, L. Gray, N. Park, H. Stöck University of Florida.
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US Peripheral Crate VMEbus Controller Ben Bylsma EMU – ESR CERN, November 2003.
S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Test Software for EMT Paul Padley Rice University May, 2005.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
XTRP Software Nathan Eddy University of Illinois 2/24/00.
Online Software November 10, 2009 Infrastructure Overview Luciano Orsini, Roland Moser Invited Talk at SuperB ETD-Online Status Review.
CSC Test Beam 2004 Summary Darin Acosta (For the EMU Collaboration)
The Control and Hardware Monitoring System of the CMS Level-1 Trigger Ildefons Magrans, Computing and Software for Experiments I IEEE Nuclear Science Symposium,
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Combined SR/SP UF Fits all of previous SP board logic! Main FPGA
Muon Track-Finder Trigger
Online Software Status
Regional Cal. Trigger Milestone: Major Production Complete
New Crate Controller Development
Darin Acosta University of Florida
September CSC Beam Test Report
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
CSC Trigger Muon Port Card & Sector Processor in production
CSC Trigger Meeting Summary
Pierluigi Paolucci & Giovanni Polese
Sector Processor Status Report
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

Summary of CSC Track-Finder Trigger Control Software Darin Acosta University of Florida

Darin Acosta, University of Florida 9 November 2004 Trigger Software Meeting 2 CSC Track-Finder Configuration & Testing Boards Higher level SP02 command panel windows Java interface to XDAQ-based software framework LUT loading

Darin Acosta, University of Florida 9 November 2004 Trigger Software Meeting 3 Firmware & LUT loading n The look-up tables on the CSC Sector Processor are loaded via a HAL-based command line program u Can be called from the Java GUI, or from a script that loads all needed LUTs u We can program multiple chips and boards in parallel (many identical tables) n Updates to the board firmware stored in EPROMs are loaded via a custom VME  JTAG program based on software by National Semiconductor and SBS u Callable from command-line scripts u Recently incorporated into the “JAL” package developed by H.Sakulin, and successfully tested! l We will port our environment to use JAL for firmware loading, in order to strive for a uniform software architecture

Darin Acosta, University of Florida 9 November 2004 Trigger Software Meeting 4 Test Software n Most test software to validate the on-board SP functionality as well as to perform interface tests between boards are written as HAL-based command line programs u Again callable from the Java GUI n For example, last week we successfully conducted a second DT/CSC Track-Finder integration test u Program loads data into FIFO on CSC TF, then injects data to DT TF (or in loop-back to CSC TF) which is captured and read out. l We expected to use an “inject pattern” command distributed via the TTC to conduct the test, but in practice last week we triggered on the data itself. u CSC and DT software are different products and not integrated. l In practice this was not much of a handicap, but for in-situ trigger tests at CMS we should evolve to a common control

Darin Acosta, University of Florida 9 November 2004 Trigger Software Meeting 5 TestBeam DAQ and Beyond n For the 2004 beam tests, we could log CSC Track- Finder data through the VME controller using a standalone HAL program or through an XDAQ-based event-builder n We partitioned the XDAQ modules so that everything could be controlled either through the Track-Finder GUI, the Testbeam Run Control, or any other control software that sends i2o messages

Darin Acosta, University of Florida 9 November 2004 Trigger Software Meeting 6 XDAQ Partitioning TrackFinder Crate GUI PC (Linux) TF PC (Linux) Network Switch GUIDriver TFDriver SBS (Bit3) TFGUI I2o Messages SOAP Messages HAL Hardware LevelSoftware Level PC Level Other apps can send message s to here

Darin Acosta, University of Florida 9 November 2004 Trigger Software Meeting 7 The Integrated EMU GUI The Track-Finder GUI has been extended to include the XDAQ-based run control system for CSC beam tests Controls 4 crates: 2 Peripheral crates, Track-Finder crate, TTC crate DB calls to store configuration parameters Evolving to become a Slicetest control