Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.

Slides:



Advertisements
Similar presentations
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Advertisements

Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
EU Developments Transmission Workgroup 3rd November 2011.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
ERGEG GRI NW Cross Border Gas Transmission Investment Virtual Simulation Specification and Design.
GRI NW Investment - From virtual to measurable support Update on project Common effort on making regional investment happen Hague 4 june 2010.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
1 Brussels workshop: 26 and 27 February 2009 Conclusions and minutes Workshop 26 – 27 February 2009 GRI NW Investment I1- Virtual Test/Business Simulation.
Investment workstream 20 January 2009 Cross-border gas transmission‏ Investment project (I1) Advisory Group Meeting Conclusions and minutes, draft Bonn.
Towards Regional Independent Operators – a main driver for successful market integration.
1 Cross-border Investment TRIGGERS GRI NW Investment I1- Virtual Test – Stockholm September 24, 2009 By : Johan Allonsius.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Investment workstream 20 October 2008 Investment project (I1)‏ Update on Consultation Presentation at account and by project manager.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Classification: Internal Status: Draft ERGEG GRI NW Investment Workstream Shippers’ contribution Helga FRANSE, Jerome DUROYON,
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
1 Investment workstream, GRI NW Investments and Incentives an economic perspective Machiel Mulder Office of Energy Regulation Netherlands Competition Authority.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
NW GRI Investment Project Virtual Test Case Adam Cooper - EFET.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
1 Conclusions Stockholm workshop GRI NW Investment I1- Virtual Test/Business Simulation (“recorded and agreed at the workshop”)
Working on investment climate in the NW-region Update By projectleader Investment I1 GRI North-West Investment workstream
Brussels workshop on Investment: 26 and 27 February 2009 “Simulating a (virtual) gas pipeline investment in the NW region” Coming to common proposal on.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Gas Regional Initiative – North West Region London 13 and 14 November 2008 Project manager: Erik Rakhou Investment project – I1 (in co-operation with I2)
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
GRI NW Investment Cross border investment Dublin 19 May Bid Capture Process Adam Cooper & Mike Young.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Brussels workshop on Investment: 26 and 27 February 2009 “Simulating a (virtual) gas pipeline investment in the NW region” Why do we need the Virtual Test.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
Directie Toezicht Energie 1 Gas Regional Initiative North West Maya van der Steenhoven Programme Office 28 April, 2009 Bonn.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Conclusions workshop Dublin.
Investment workstream 22 January 2009 Cross-border gas transmission‏ Investment project (I1) Update to RCC at account of project leader Erik Rakhou Project.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
GRI Investment Project A-Z Adam Cooper EFET Stockholm 24 September.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
European Developments Transmission Workgroup 1 st December 2011.
Investment workstream 08 June 2009 Cross-border gas transmission‏ Investment project (I1) Update for Joint GRI NW Meeting Where are we heading since last.
North West Region Gas Regional Initiatives Regulatory Co-ordination Workshop 23 rd April 2007.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
European Developments Transmission Workgroup 3 rd May 2012.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
1 GRI NW Investment project in progress Cross-border gas transmission‏ Update on Investment project I1 GRI NW Focus at Virtual Test (Business Simulation)
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
2009 TSO Transparency Gas Regional Initiative North-West
GRI NW TRANSPARENCY PROJECT
Presentation transcript:

Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW

Investment workstream 2 NW GRI Project Objectives (*): By end 2008: understand existing incentives on TSOs to make additional capacity available efficiently By end 2009: an agreed regional framework for new cross border (**) investments should be in place By end 2009: begin to establish and implement co-ordinated incentive mechanisms Success Criteria summary: Efficient TSOs can recover their costs & earn a reasonable return commensurate with risk Adequate cross-border investment leading to increased trade & greater price convergence Regulatory regimes support investment in capacity beyond contractual commitments from network users, if adequate * A Vision and a Roadmap for the Gas Regional Initiative North West, 4 April 2008 * Based on ‘A Vision and a Roadmap for the Gas Regional Initiative North West’, 4 April 2008 * * Leading to in/decrease of capacity at a regional interconnection point 1.Reminder roadmap: this project is about path to agreed regional framework…

Investment workstream 2. Visualising virtual test steps and outcomes (1) A published “Economic Test” “Market-based Allocation” Basis of decision (e.g. NPV test) to share risks, costs and benefits, agreed between regulators, TSOs and others Bidding process for capacity determines level of build plus allocation of initial (mid/long-term) capacity. Step 1 (Brussels => Dublin) Step 2

Investment workstream 2. Visualising virtual test steps and outcomes (2); the regional investment climate is a sum of national climates working Expected outcomes test case (to be recorded in a test report): A shared model and a better appreciation for (cross-border, NW) pipeline investment risks and how they should be distributed, including: - stress testing key elements of current regulatory frameworks and some innovative improvements to cross-border investment processes like EFETs bidding process/economic test concept. - assessing are “the outcomes acceptable from a regulators, tso’s and stakeholders perspective”(*) and, if relevant, potential advise on enhancement of the regional investment climate. * See the ToR 8 January 2009, page 4.

Investment workstream 3. Key decisions today focus at confirming test design and going for it…. 1. Approval of generic test design and, sub sequentially, a GO for it based on: Test model and parameters level of detail required (including potential for high level key national detail(s)) Test bidding process and detailed timetable (May – September ‘09; including selecting between alternatives to shipper participation in bidding) Confirming the test questions – enable risk distribution dialogue based on shared model, while stress testing regulatory key parameters and innovative approach to investment process – and way of results recording (test journal). 2. Formation of new working Core group of TSO/Regulator(s)/ (observing) shippers to do Virtual Test tasks on way to September workshops, i.e. running the actual test. 3. Confirming the reference group to assist and advise the Core group. 4. Assignment of detailed tasks and respective timings needed to complete the Virtual Test process to the respective groups (see points 2 and 3). 5. General confirmation of any other crucial details (if any).

Investment workstream Horatio Philips Philips Multi Plane Mk I (1904) Philips Multi Plane Mk II (1907) Perseverance may be needed! Modern airplanes carry millions of happy customers today! Innovation succeeds only after trial – today we do even more Source: Kema presentation

Investment workstream ANNEX

Investment workstream Main relevant documents (excl. other EU discussions going on in parallel, setting the context) Current Roadmap ToR as approved VT document for Brussels Our common presentation Brussels: why are we here and road ahead…  See also other presentations, eg on importance of incentives … Conclusions Brussels, 1 st workshop Developed Excel model Developed bidding sheet Potential (in “pipeline”) Manual (with 4 (9) frameworks) Test “journal” report with findings on the way  Including outline of followed process Advise (report) on bidding process test from “Tilburg” experiment Finally, advise to all stakeholders on enhancing regional framework for investment (if required, by end of 2009)

Investment workstream Remarks We must be clear on differences to current world. Proposal for list Bundled product at borders Proven congestion, test of societal need out of scope  Dedicated pipeline: in relaity pipeline is often incremental to existing pipes - This applies below 2-3 bcm, not at like with us. Transparency on investment model at all levels Simplified frameworks, adopted to the “virtual purpose” (currently 1 parameter fits all) 100% same bidding process for all 4 “test” countries  With a price schedule and flexible contracts durations Pre-defined investment trigger: “when is it economic to invest”  If trigger is met, capacity comes  Trigger is per definition set illustratively as risk dialogue is not finalised Open discussion on principles of settling potentially “uncovered” by contracts part of investment => risk distribution/risk dialogue No other constraints like NIMBY (permits); finance etc…