W E L C O M E Power Grid Corporation of India Limited.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

Tariff. The rate at which electrical energy is supplied to a consumer The rate at which electrical energy is supplied to a consumer Therefore tariff naturally.
The Single Electricity Market in Ireland
1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
1 ABT Based Boundary Metering. 2 ABTBoundary Metering+
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
1 A Staff Presentation Developing a Common Platform for Electricity Trading RAVINDER Chief (Engineering) Central Electricity Regulatory Commission 7 th.
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
THE INDIAN POWER SYSTEM PECULIARITIES, PROBLEMS AND SOLUTIONS.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
1 APPROPRIATE PRICING OF TRANSMISSION A PRESENTATION BY SRLDC, BANGALORE.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
1 ABT WORK SOUTHERN REGION EXPERIENCE. 2 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy.
1 ABT WORK SOUTHERN REGION EXPERIENCE. 2 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
SRLDC 1 POWER SYSTEM OPERATION A FRESH PERSPECTIVE Power Grid Corporation of India Limited New Delhi, India.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
MERIT ORDER OPERATION AND GRID DISCIPLINE S.P.KUMAR MANAGER(IT), SRLDC,BANGALORE.
1 SCOPE OF THE PRESENTATION Grid operation - overview Availability Based Tariff Benefits to Region & it’s constituents Intra_state ABT – it’s necessity.
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Power Trading Financial Markets Electricity. Triple Point Technology2 Current Situation… GenerationTransmissionDistributionConsumers.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
SRLDC 1 COMPETITION IN GENERATION Power Grid Corporation of India Limited New Delhi, India.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
UTILISATION OF IDLING CAPACITY OF CAPTIVE POWER PLANTS-A VIABLE ALTERNATIVE BHANU BHUSHAN DIRECTOR(OPERATION),POWERGRID.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
UI – ITS MANY AVATARS!. UNSCHEDULE INTERCHANGE It's more than what meets the eye!!!!
1 ABT WORK SOUTHERN REGION EXPERIENCE. 2 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy.
W E L C O M E Power Grid Corporation of India Limited.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Open Access.
Congestion regulations
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
An operational analysis of Kadamparai Pumped Storage Hydro Plant located in Tamil Nadu Sanyasi Naidu.
Presentation transcript:

W E L C O M E Power Grid Corporation of India Limited

UNSCHEDULE INTERCHANGE It's more than what meets the eye!!!!

WHAT’S OUR OBJECTIVE? ECONOMIC OPERATION OF THE GRID ECONOMIC OPERATION OF THE GRID PROMOTE TRADE PROMOTE TRADE STABILITY OF THE GRID STABILITY OF THE GRID ROBUST SETTLEMENT SYSTEM ROBUST SETTLEMENT SYSTEM COMMERCIAL MECHANISM WHICH COMPLEMENTS SECURITY COMMERCIAL MECHANISM WHICH COMPLEMENTS SECURITY SEAMLESS CHANGE PROCESS SEAMLESS CHANGE PROCESS FREEDOM FREEDOM

LET’S SEE HOW THE UI MECHANISM OF ABT TAKES ON MANY AVATARS The fox knows many things, but the hedgehog knows one big thing …… —Greek poet Archilochus

THE MANY AVATARS PROMOTING TRADE PROMOTING TRADE COMPETITIVE ENVIRONMENT COMPETITIVE ENVIRONMENT OPEN ACCESS OPEN ACCESS BALANCING/SPOT MARKET BALANCING/SPOT MARKET ROBUST SETTLEMENT MECHANISM ROBUST SETTLEMENT MECHANISM NASH EQUILIBRIUM NASH EQUILIBRIUM ULTIMATE OPTIMISER ULTIMATE OPTIMISER OPEN AND FAIR MARKET PLACE OPEN AND FAIR MARKET PLACE WIN-WIN PLATFORM WIN-WIN PLATFORM

IT’S SIMPLICITY ITSELF! INEXPENSIVE TO IMPLEMENT INEXPENSIVE TO IMPLEMENT MINIMUM LOGISTICS MINIMUM LOGISTICS METERING IN PLACE IN MOST PLACES METERING IN PLACE IN MOST PLACES PRICE SIGNAL AVAILABLE AT ANY POWER OUTLET ! PRICE SIGNAL AVAILABLE AT ANY POWER OUTLET ! EASY SETTLEMENT EASY SETTLEMENT EASE OF REGULATION EASE OF REGULATION EASY TO UNDERSTAND AND IMPLEMENT EASY TO UNDERSTAND AND IMPLEMENT

THE PROBLEMS EARLIER…. ERRATIC FREQUENCY ERRATIC FREQUENCY LOW VOLTAGES LOW VOLTAGES FREQUENT DISTURBANCES FREQUENT DISTURBANCES OVER/UNDER DRAWALS CAUSING CONSTRAINTS OVER/UNDER DRAWALS CAUSING CONSTRAINTS INDISCIPLINED SYSTEM OPERATION INDISCIPLINED SYSTEM OPERATION ARCHAIC SETTLEMENT SYSTEM ARCHAIC SETTLEMENT SYSTEM

AVAILABILITY TARIFF AVAILABILITY TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM

WHAT IS AVAILABILITY TARIFF? PAYMENT OF FIXED COST DEPENDS ON PLANT AVAILABILITY( ie.. MW DELIVERING CAPACITY). PAYMENT OF FIXED COST DEPENDS ON PLANT AVAILABILITY( ie.. MW DELIVERING CAPACITY). VARIABLE COST IS PAID DEPENDING ON THE ‘SCHEDULED GENERATION’ VARIABLE COST IS PAID DEPENDING ON THE ‘SCHEDULED GENERATION’ ANY DEVIATIONS FROM THE SCHEDULE ATTRACTS A FREQUENCY LINKED CHARGE. ANY DEVIATIONS FROM THE SCHEDULE ATTRACTS A FREQUENCY LINKED CHARGE.

UI : THE GENESIS ABT IMPLEMENTED IN SOUTHERN REGION ON 1 st January, 2003 ABT IMPLEMENTED IN SOUTHERN REGION ON 1 st January, 2003 UI ‘ TURNOVER’ AMOUNTS TO RS XXXX CRORES TILL XXOCT03 UI ‘ TURNOVER’ AMOUNTS TO RS XXXX CRORES TILL XXOCT03 INTER-REGIONAL UI TRANSACTION : RS YYY CRORES INTER-REGIONAL UI TRANSACTION : RS YYY CRORES HIGHEST UI TRANSACTION IN A DAY (INTER REGIONAL) = ZZ MU, RS 107 LAKHS HIGHEST UI TRANSACTION IN A DAY (INTER REGIONAL) = ZZ MU, RS 107 LAKHS HIGHEST UI TRANSACTION IN A DAY (INTRA REGIONAL) = DD MU, RS SSS LAKHS HIGHEST UI TRANSACTION IN A DAY (INTRA REGIONAL) = DD MU, RS SSS LAKHS

THE AVATARS OF UI TRADITIONAL TRADITIONAL SETTLEMENT OF DEVIATIONS SETTLEMENT OF DEVIATIONS GRID DISCIPLINE GRID DISCIPLINE PRICE/OPTIMISATION VECTOR PRICE/OPTIMISATION VECTOR SPOT MARKET SPOT MARKET BALANCING MARKET BALANCING MARKET MERIT ORDER OPERATION MERIT ORDER OPERATION SETTLEMENT FRAMEWORK SETTLEMENT FRAMEWORK PUMPED STORAGE PUMPED STORAGE MERCHANT GENERATOR MERCHANT GENERATOR CAPTIVE POWER PLANT CAPTIVE POWER PLANT DISCOMS DISCOMS ARBITRAGE ARBITRAGE CATALYST FOR COALITION CATALYST FOR COALITION CO-OPERATION THROUGH NON-CO-OPERATION CO-OPERATION THROUGH NON-CO-OPERATION SELF HEALING MECHANISM’ SELF HEALING MECHANISM’ TRANSPARENCY TRANSPARENCY IMPOSSIBLE TO RIG PRICES IMPOSSIBLE TO RIG PRICES NEUTRALITY NEUTRALITY PSEUDO COMPETITOR PSEUDO COMPETITOR PAYMENT SECURITY THROUGH THE POOL PAYMENT SECURITY THROUGH THE POOL

THE BASIC PREMISE OF UI HELPING THE GRID GETS REWARDED, HURTING THE GRID IS PENALISED

FREQUENCY BASED DESPATCH BEFORE APRIL 1 st 2004

THE CAPTIVE POWER PLANT HUGE CAPACITY IS BOTTLED UP FOR WANT OF HUGE CAPACITY IS BOTTLED UP FOR WANT OF COMMERCIAL ARRANGEMENTS COMMERCIAL ARRANGEMENTS FLEXIBILITY FLEXIBILITY REGULATION REGULATION SCHEDULING MECHANISM BETWEEN SEB/TRANSCO/DISCOM AND CPP SCHEDULING MECHANISM BETWEEN SEB/TRANSCO/DISCOM AND CPP DEVIATIONS (UI) TO BE RATE DEPENDING ON THE FREQUENCY DEVIATIONS (UI) TO BE RATE DEPENDING ON THE FREQUENCY

AN EVERY DAY EXAMPLE SEB CPP + STEEL PLANT CAPACITY: 2X65 MW RATE: 100p/UNIT REQUIREMENT: 120±10 MW CAPABILITY: 120 MW AVAILABILITY: FULL FOR 10 MONTHS, ONE UNIT ON OH FOR 1 MONTH EVERY YEAR CONDITIONS 1)30 MW MINIMUM DEMAND 2)70 MW MAX DEMAND FOR 2 MONTHS REPURCUSSIONS: FOR 10 MONTHS THE CPP RUNS AT PART LOAD OF 90 MW DUE TO CONDITION 1) ABOVE

UI AND THE CPP- ADVANTAGES ADVANTAGES TO CPP ADVANTAGES TO CPP SIMPLICITY – A FREQUENCY METER IS ALL THAT IS REQUIRED SIMPLICITY – A FREQUENCY METER IS ALL THAT IS REQUIRED NO TELEMETRY OR COMMUNICATION WITH SLDC/SEB NO TELEMETRY OR COMMUNICATION WITH SLDC/SEB NO PRICE TO BE NEGOTIATED NO PRICE TO BE NEGOTIATED CPP DOES NOT HAVE TO SEARCH FOR BUYER CPP DOES NOT HAVE TO SEARCH FOR BUYER CPP CAN MAKE A REASONABLE PROFIT. CPP CAN MAKE A REASONABLE PROFIT. ADVANTAGES TO SEB/TRANSCO/DISCOM ADVANTAGES TO SEB/TRANSCO/DISCOM IMPARTIAL AND UNBIASED SYSTEM IMPARTIAL AND UNBIASED SYSTEM NEED NOT WORRY ABOUT CPP UNDER-GENERATING AT LOW FREQUENCY AND OVER-GENERATING AT HIGH FREQUENCY NEED NOT WORRY ABOUT CPP UNDER-GENERATING AT LOW FREQUENCY AND OVER-GENERATING AT HIGH FREQUENCY FRAMEWORK FOR SETTLEMENT IS ALREADY AVAILABLE FRAMEWORK FOR SETTLEMENT IS ALREADY AVAILABLE A WIN-WIN SITUATION !!!

ABT MECHANISM FOR DISCOMS GENCO GIVES STATION WISE AVAILABILITY FOR DAY AHEAD GENCO GIVES STATION WISE AVAILABILITY FOR DAY AHEAD TRANSCO RECIEVES ISGS AVAILABILITY FOR THE DAY AHEAD TRANSCO RECIEVES ISGS AVAILABILITY FOR THE DAY AHEAD TRANSCO BROADCASTS THE SAME TO DISCOMS TRANSCO BROADCASTS THE SAME TO DISCOMS DISCOMS REVERT BACK WITH REQUISITIONS DISCOMS REVERT BACK WITH REQUISITIONS TRANSCO FINALISES AFTER DUE CONSIDERATION (SECURITY ASPECT) TRANSCO FINALISES AFTER DUE CONSIDERATION (SECURITY ASPECT) INFORMS ISGS REQUISITIONS TO RLDC. INFORMS ISGS REQUISITIONS TO RLDC. BROADCASTS FINAL SCHEDULE TO DISCOMS BROADCASTS FINAL SCHEDULE TO DISCOMS REVISIONS IF ANY REVISIONS IF ANY

ADVANTAGES ECONOMIC OPERATION ECONOMIC OPERATION CHEAPER GENERATORS ARE ENCOURAGED CHEAPER GENERATORS ARE ENCOURAGED ONUS ON DISCOMS TO MANAGE LOADS ONUS ON DISCOMS TO MANAGE LOADS REALISTIC REQUISITIONS REALISTIC REQUISITIONS CAPTIVES AND IPP’S HARNESSED CAPTIVES AND IPP’S HARNESSED GENCO MAINTENANCE SCHEDULES WOULD BE AGRESSIVE GENCO MAINTENANCE SCHEDULES WOULD BE AGRESSIVE CONTROL OVER UI QUANTUM(HEAVY UNDER/OVER DRAWALS WOULD BE THING OF THE PAST) CONTROL OVER UI QUANTUM(HEAVY UNDER/OVER DRAWALS WOULD BE THING OF THE PAST) CAPACITY ADDITION – INVESTMENT COMMENSURATE WITH LOAD GROWTH CAPACITY ADDITION – INVESTMENT COMMENSURATE WITH LOAD GROWTH

MERCHANT GENERATORS NO FIXED COST IMPLICATION NO FIXED COST IMPLICATION LOW CAPITAL COST PLANTS LOW CAPITAL COST PLANTS CO-GENERATIVES/RENEWABLES ETC CO-GENERATIVES/RENEWABLES ETC NOT ‘TIED’ BY PPA NOT ‘TIED’ BY PPA TREATED MUCH THE SAME AS A CPP TREATED MUCH THE SAME AS A CPP ELECTRICITY ACT 2003 ELECTRICITY ACT 2003 MAY CONNECT TO ANY LEVEL IN THE GRID MAY CONNECT TO ANY LEVEL IN THE GRID OPEN ACCESS IMPLICATIONS OPEN ACCESS IMPLICATIONS DEPENDS SOLELY ON UI MECHANISM TO RECOVER COSTS (FIXED+VARIABLE+PROFIT) DEPENDS SOLELY ON UI MECHANISM TO RECOVER COSTS (FIXED+VARIABLE+PROFIT)

PUMP STORAGE PLANTS A CRUCIAL ELEMENT IN MAXIMISING PAYOFFS IN ABT A CRUCIAL ELEMENT IN MAXIMISING PAYOFFS IN ABT DEPLETED HYDRO RESOURCES DEPLETED HYDRO RESOURCES SET THRESHOLDS FOR PUMPING AND GENERATING MODES DEPENDING ON LOSS/VARIABLE COST SET THRESHOLDS FOR PUMPING AND GENERATING MODES DEPENDING ON LOSS/VARIABLE COST PLANT OPERATOR DECIDES WHEN TO GENERATE/PUMP DEPENDING ON FREQUENCY( SAY GENERATE AT F 50.2 HZ ) PLANT OPERATOR DECIDES WHEN TO GENERATE/PUMP DEPENDING ON FREQUENCY( SAY GENERATE AT F 50.2 HZ ) FLEXIBILITY AND CAPABILITY TO CHANGE MODES FAST IS THE KEY FLEXIBILITY AND CAPABILITY TO CHANGE MODES FAST IS THE KEY THE ‘STORED’ POWER IS USED TO GENERATE IN PEAK ( LOW FREQ) THE ‘STORED’ POWER IS USED TO GENERATE IN PEAK ( LOW FREQ) WATER IS RECYCLED MANY TIMES OVER WATER IS RECYCLED MANY TIMES OVER EXAMPLE:- KADAMPARAI PUMPED STORAGE SCHEME IN TN HAS A RESERVOIR CAPACITY OF 20 MU, BUT THE TOTAL GENERATION ACHIEVED THIS YEAR IS MORE THAN 500 MU) EXAMPLE:- KADAMPARAI PUMPED STORAGE SCHEME IN TN HAS A RESERVOIR CAPACITY OF 20 MU, BUT THE TOTAL GENERATION ACHIEVED THIS YEAR IS MORE THAN 500 MU) KADAMPARAI

GENERATORS :-NON-CONVENTIONAL ENERGY SOURCES VARIATION IN VARIABLE CHARGES DUE TO NATURE OF FUEL VARIATION IN VARIABLE CHARGES DUE TO NATURE OF FUEL DIFFICULTY IN ENTERING INTO PPA’s/CONTRACTS DIFFICULTY IN ENTERING INTO PPA’s/CONTRACTS SEASONAL VARIATION IN GENERATION SEASONAL VARIATION IN GENERATION UI MARKET PLACE PROVIDES A SEAMLESS PLATFORM FOR TRANSACTIONS UI MARKET PLACE PROVIDES A SEAMLESS PLATFORM FOR TRANSACTIONS THE PLANT OPERATOR DECIDES AT WHAT FREQUENCY TO GENERATES DEPENDING ON VARIABLE CHARGES THE PLANT OPERATOR DECIDES AT WHAT FREQUENCY TO GENERATES DEPENDING ON VARIABLE CHARGES

THE TRADING FRAME WORK CTU – INTER REGION CTU_WEST CTU_SOUTH CTU_NORTH CTU_EAST CTU_NE STU RLDC NLDC RLDC

INTER-REGIONAL ARBITRAGE HOW IT WORKS WESTER REGION GRID EASTER REGION GRID SOUTHERN REGION GRID FREQ = 50.2 HZ/ RS 0.70 FREQ = 49.6 HZ/ RS 2.20 DIFFERENCE IS RS 1.50 SIGNAL:- DRAW POWER FROM CENTRAL GRID ER UI SUMMARY

PICTURE 4.4

HOW ARBITRAGE HELPS TAKES CARE OF EXIGENCIES TAKES CARE OF EXIGENCIES LOW FREQUENCY LOW FREQUENCY HIGH FREQUENCY HIGH FREQUENCY KEEPS PRICE/FREQ MOVING IN A NARROW BAND KEEPS PRICE/FREQ MOVING IN A NARROW BAND HELPS CONTROL CONGESTION HELPS CONTROL CONGESTION DECREASE LOSSES DECREASE LOSSES MERIT ORDER OPERATION IN BOTH REGIONS MERIT ORDER OPERATION IN BOTH REGIONS

GAME THEORY CONCEPTS MATHEMATICAL ANALYSIS FOR INTERACTIONS BETWEEN PEOPLE. MATHEMATICAL ANALYSIS FOR INTERACTIONS BETWEEN PEOPLE. THESE INTERACTIONS ARE CALLED GAMES. THESE INTERACTIONS ARE CALLED GAMES. GAMES ARE PLAYED BY RATIONAL PEOPLE. GAMES ARE PLAYED BY RATIONAL PEOPLE. RATIONAL PLAYERS IN A GAME LOOK TO MAXIMISING THEIR INDIVIDUAL PAY-OFF’s. RATIONAL PLAYERS IN A GAME LOOK TO MAXIMISING THEIR INDIVIDUAL PAY-OFF’s. AN EQUILIBRIUM POINT IS REACHED WHEN ANY PLAYER CANNOT INCREASE HIS PAYOFF UNILATERALLY. AN EQUILIBRIUM POINT IS REACHED WHEN ANY PLAYER CANNOT INCREASE HIS PAYOFF UNILATERALLY. THIS IS REFFERED TO AS A ‘NASH’ EQUILIBRIUM AFTER ITS PROPONENT JOHN NASH. THIS IS REFFERED TO AS A ‘NASH’ EQUILIBRIUM AFTER ITS PROPONENT JOHN NASH. SOME OF THE TYPES OF GAMES ARE SOME OF THE TYPES OF GAMES ARE ZERO SUM GAME ZERO SUM GAME CO-OPERATIVE/NON CO-OPERATIVE GAMES CO-OPERATIVE/NON CO-OPERATIVE GAMES REPETITIVE GAMES REPETITIVE GAMES GAME THEORY CONCEPTS ARE USED TO MODEL HUMAN BEHAVIOUR/STRATEGIES IN A COMPETITIVE MARKET GAME THEORY CONCEPTS ARE USED TO MODEL HUMAN BEHAVIOUR/STRATEGIES IN A COMPETITIVE MARKET THESE CONCEPTS CAN FIND PARALLELS IN THE UI MARKETPLACE THESE CONCEPTS CAN FIND PARALLELS IN THE UI MARKETPLACE

GAME THORY AND UI ZERO SUM GAME :- Σ OF EVERY PLAYERS UI IS ZERO ZERO SUM GAME :- Σ OF EVERY PLAYERS UI IS ZERO REPETITIVE GAME :- PLAYED EVERY 15 MTS (ONE TIME BLOCK OF ABT) REPETITIVE GAME :- PLAYED EVERY 15 MTS (ONE TIME BLOCK OF ABT) NON-CO-OPERATIVE GAME :- EVERY PLAYER LOOKS TO MAXIMISING PAYOFF – ‘…. ITS’ HUMAN TO WANT MORE….!!!’ NON-CO-OPERATIVE GAME :- EVERY PLAYER LOOKS TO MAXIMISING PAYOFF – ‘…. ITS’ HUMAN TO WANT MORE….!!!’ EQUILIBRIA IS REACHED BETWEEN 49 AND 50.5 HZ- STEADY STATE FREQUENCY EQUILIBRIA IS REACHED BETWEEN 49 AND 50.5 HZ- STEADY STATE FREQUENCY MULTIPLE EQUILIBRIUM POINTS IN THE RANGE MULTIPLE EQUILIBRIUM POINTS IN THE RANGE THIS EXPLAINS WHY AN UI MARKET OF A FEW CRORES REGULATES A MARKET MORE THAN A THOUSAND TIMES ITS SIZE! THIS EXPLAINS WHY AN UI MARKET OF A FEW CRORES REGULATES A MARKET MORE THAN A THOUSAND TIMES ITS SIZE!

UI : FUTURE REFINEMENTS TIGHTEN THE FREQUENCY RANGE TIGHTEN THE FREQUENCY RANGE TIME-OF-DAY ELEMENT TIME-OF-DAY ELEMENT CHANGE THE SLOPE CHANGE THE SLOPE

3 D UI OF THE FUTURE? UI RATE