A Proposal to Update LRIT to Provide Reliable Rebroadcast Tool for GOES DCS Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

DADDS DCS LRIT Prototype LRIT Latency Results Presented by Microcom Design, Inc. May 2014.
GOES-R Ground Segment Project Robin Pfister Deputy Project Manager, GOES-R Ground Segment 6 th GOES Users’ Conference Madison, Wisconsin Tuesday, November.
Spacecraft Constellation GOES-12 scheduled for de-commissioning in Dec 2013 –GOES-12 still supporting South American mission –GOES-12 DCS is turned on.
CSE 308 Project Management. SWE Communication Skills Management: Run a team meeting Presentation: Present aspects of your project during its development.
© 2007 COPLAN AND COMPANY. All Rights Reserved. Permission granted for use by HIMSS membership. 1 Procurement Management Scott R. Coplan, PMP Educational.
HIMAWARI – 8 UPDATE 2013 OCONUS GOES-R PG BILL WARD PACIFIC REGION HEADQUARTERS HONOLULU, HAWAII.
GOES Direct Services. Topics  Direct Broadcast Services  GOES Data Collection Services  Search and Rescue.
NOAA COMMAND AND DATA ACQUISITION STATION
Reginald Lawrence Office of Systems Development
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
Managing the Information Technology Resource Jerry N. Luftman
Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility.
1 GOES DCS Status and Information Dan Schwitalla – th Meeting of the STIWG– 18 – 20 May 2009.
DCP COMMAND …bringing two-way communications to your DCPs.
1 EDDN Status and Information Dan Schwitalla – 2009 USGS STIWG/TWG – 6-8 May 2014.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
Environmental Satellite Product and Distribution System (ESPDS) GOES-R Access Subsystem (GAS) John Linn ESPDS System Engineering 7 October 2009.
Robin Pfister (GOES-R Ground Segment Deputy Project Manager)
Port Security Social Media Project Advisory Group May 15, 2012.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
LRGS Enhancements for LRIT NOAA TWG Meeting May 12, 2011 Sutron Corporation Davis Drive, Sterling VA Tel: (703)
Tuesday, October 06, 2015 Santos Rodriguez NWS EMWIN HRIT/EMWIN.
1 DCPR Power Ranges Proposed for CS v.2.0 DCS Manufacturers Meeting June 13, 2007 Peter Woolner Noblis
1 PETER WOOLNER MITRETEK SYSTEMS KAY METCALF NOAA GOES DCS PROGRAM MANAGER NOAA DECISION BRIEFING STIWG AND TWG NOVEMBER 7-8, 2006 ASHEVILLE, NC.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 2, 2012.
Upcoming Frequency Topics: Future GOES-R Concerns
Kay Metcalf NOAA GOES DCS Program Manager Office of Satellite Data Processing and Distribution NOAA’s Satellite and Information Service GOES DCS: NOAA.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
NOAA Satellite Proving Ground/User Readiness Meeting
Document Management System for Construction Industry From Crystal Infosystems & Services.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or is with copies to
LRIT Testing at NOAA/CO-OPS STIWG Oct CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CO-OPS operates a DOMSAT system at its two regional.
Support for GOES Data Collection System Presentation to the Advisory Committee on Water Information by Charles Kazimir, Chairperson of the Satellite Telemetry.
GIS Application for the Delaware Radiological Emergency Preparedness Program Dan Rose – Delaware Emergency Management Agency Steve Stasolla – SRC Consulting.
Software Reusability An efficient way in Software Development By Tejaswi Peesapati
Breakout Session Topic: Atmosphere A and B 1.During the GOES-R era, NOAA/NESDIS hopes to move away from system “stovepipes” and into the realm of integrated.
DEC.10,20061 Santos Rodriguez, NWS EMWIN CURRENT EMWIN OVERVIEW.
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
GOES-R Ground Segment Project Robin Pfister Deputy Project Manager, GOES-R Ground Segment GOES Users’ Conference Madison, Wisconsin Tuesday, November 3,
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451  Contact Phil Whaley at (757) or Al McMath.
EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group for Meteorological Satellites - CGMS EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group.
LRIT Project Status Update STIWG/TWG, Boise, ID Mark Bushnell NOAA/NOS/CO-OPS May 02, 2012 Definitions LRIT – Low Rate Information Transmission LRGS –
1 NOAA Center for Weather and Climate Prediction (NCWCP) June 17, 2005 Briefing for Dr. David A. Sampson Deputy Secretary of Commerce.
GOES Program October 1, 2002 Steven P. Kirkner GOES Program Manager, NOAA/NESDIS.
NOAA Satellite Direct Readout Conference Welcome! – to the 2011 NOAA Direct Readout Conference! Kathleen Kelly Director, Office of Satellite Products and.
Geostationary Operational Environmental Satellite (GOES) User’s Conference Current Status of the NOAA GOES Direct Services Paul Seymour – Broadcast Services.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
GOES Data Collection System Status of Version II Transmitter Implementation Information Brief for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
Top Recommendations GOES POES Services Frequencies.
December,  No official date for full switchover from RMS 2.38 to RMS 3.0  State of the RMS Support Contract  Expect regular updates once per.
DCP Command Status Oct DCP Command Update Phase 2 SBIR completed in June Successful Tests conducted on both GOES East and GOES 14 Satellites.
DADDS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 6, 2014.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
GOES-R Series User Readiness Planning and Development May 12, 2004.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager November 17, 2010.
CGMS-43-NOAA-WP-03 Coordination Group for Meteorological Satellites - CGMS PDA Product Distribution & Acquisition by NOAA Presented to CGMS-43 Plenary.
DADDS New Features Tuesday, May 3, 2016Sioux Falls, SD Letecia Reeves, GOES DCS Customer Service Specialist NOAA/NESDIS/OSPO/SPSD.
GOES Data Collection System Status of Version II Transmitter Implementation Information Brief for TWG Kay Metcalf NOAA GOES DCS Program Manager November.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) DECEMBER 5, 2008.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
Supporting quality devices
Banking RFP & Transition Process NCLGIA Summer 2016 Conference
Progress leisure OCR GCSE ICT.
Project Information Management Jiwei Ma
GOES DCS Customer Interaction/Access Training
Presentation transcript:

A Proposal to Update LRIT to Provide Reliable Rebroadcast Tool for GOES DCS Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12, 2011

May 2011NOAA GOES DCS2 GOES DCS Rebroadcast Currently Provided through Commercial DOMSAT contract Has Worked Well for Many years but has become logistically cumbersome –Contract Mechanism to Encourage Free and Open Competition Makes it Difficult to Manage User Transitions Required Requiring Technology Continuity Restricts Competition to only one vendor –Coverage Restricted to Continental U.S. –Cost otherwise would most likely be prohibitive –Vendor currently providing more coverage, but is “at will” Could be changed at any time because contract does not require hemispheric coverage –Exchanging fund between government agencies to fund contract has become very difficult

May 2011NOAA GOES DCS3 DOMSAT Status Final Option Year of DOMSAT contract exercised Beginning new one year bridge contract –Paperwork in progress 2011 (Sept) funded by NOS, USGS, BLM, BR and USACE –MOU’s set up for BLM and USACE (amendments in progress) –MOU in progress for BR –USGS made “quid pro quo” arrangement with NOS –NOS funds directly tapped through procurement documents (means no MOU required) –NESDIS (Kay’s office) providing $12k NESDIS will combine all DOMSAT service contracts for 5 year follow on contract Suggested Changes to LRIT makes it viable replacement

Low Rate Information Transfer (LRIT) GOES Rebroadcast of NESDIS products –Primary Function to provide user access to NESDIS satellite products at low cost –“Packetized format” Information Packaged in Small Files –GOES DCS Rebroadcast Provided to provide low cost reception of data to platform owners Products created at NOAA Satellite Operations Facility (NSOF) in Suitland, MD Transferred to WCDA via land lines Transmitted to satellite at Wallops Nov-2010NOAA GOES DCS4

GOES DCS Into LRIT Uses an LRGS client with username “LRIT” –Originally implemented because DAPS code could not be modified –LRGS located at Wallops –LRGS user makes request to WCDA for data every 30 seconds –File created and transferred to LRIT system in Suitland –Inserted into LRIT stream at Suitland LRIT stream transferred to WCDA Infamous “double hop” Nov-2010NOAA GOES DCS5

Vulnerabilities Priority assignments could provide conflicts when system fully loaded (not seen yet) –Currently DCS Random has Priority “1” –Regular DCS has Priority “2” –Must be integrated with standard LRIT data stream (i.e. images) LRGS is separate process for technical staff to monitor Interfaces unclear –Sometimes WCDA thinks LRIT is down –Sometimes LRIT technicians think “DCS” is down –An extra step for technicians to remember Manual restart process required in case of nonstandard actions like reboot Nov-2010NOAA GOES DCS6

Recommendation for DCS Insert into LRIT DADDS is DCS Standard Distribution System LRIT stream similar to DOMSAT and NWSTG streams Provide “spicket” to feed LRIT from DADDS ADVANTAGES: –Only one platform to maintain –Only one process to restart DADDS from NSOF insert DCS into LRIT Backup LRIT at WCDA can be fed by WCDA DADDS –IF LRIT at NSOF goes down WCDA will pick up operations May 2011NOAA GOES DCS7

Recommendation to Remedy Priority Concerns LRIT system on GOES-R renamed “HRIT/EMWIN” –Data rate faster so “High Rate” instead of “Low Rate” –Emergency Managers Weather Information Network (EMWIN) stream combined Proposal to GOES-R from LRIT, EMWIN and DCS programs: –Provide virtual channels for each service HRIT will have one stream EMWIN will have one stream DCS Rebroadcast will have one stream Each service given channels based on predefined bandwidth Priorities for each service will be determined within those bands by the program (DCS will define priorities for their portion of uplink, etc.) May 2011NOAA GOES DCS8

Status of GOES-R Proposal Integrated Product Team (IPT) formed Initial discussions begin Funding not yet Confirmed to Build Ground System Nov-2010NOAA GOES DCS9

NEXT Steps for DCS Closely monitor HRIT/EMWIN Discussions –DCS team members on IPT Close to Decision within a few months Begin Analysis of Changes Required for Receivers Quickly –High hopes that not many changes required Continue Existing DOMSAT contract for 5 years to allow time for Transition Nov-2010NOAA GOES DCS10