© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. Finance Process 22 May 2006.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

(416) Achieving Sustainable Service Excellence Approach & Credentials EFFICIENCY, GROWTH & PERFORMANCE MANAGEMENT.
Improving Your Business Results Six Sigma Qualtec Six Sigma Qualtec Six Sigma Qualtec – All Rights Reserved June 26, 2002 BEYOND SIX SIGMA: A HOLISTIC.
1 Chapter 3 Project Organization, Selection, and Definition.
ROLES & RESPONSIBILITES. 2 Explain Process Excellence / Continuous Improvement (CI) roles and responsibilities. Learning Objectives At the end of this.
Improving Your Business Results Six Sigma Qualtec Six Sigma Qualtec Six Sigma Qualtec – All Rights Reserved Deployment Approach From Initialization to.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
Roles and Responsibilities QMS Infrastructure. All Rights Reserved, Juran Institute, Inc Performance System.v1 1.PPT Learning Objectives 1.Become.
Charting a course PROCESS.
Release & Deployment ITIL Version 3
BPM Governance Identifying methods for prioritizing, standardizing, measuring and controlling BPM efforts.
Development of Six Sigma
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Copyright © Six Sigma Academy International, LLC All Rights Reserved Voith Financial Workshop May 11, 2006.
Copyright © Six Sigma Academy International LLC All Rights Reserved Steering Committee Procedures And Best Practices.
Transforming Business Through Smarter Process April 23, 2008 Finance Policies and Processes.
0 0 Six Sigma – Financial Overview. 1 1 Roles and Responsibilities of the Finance Support Team Policy Setting – Define Savings/Benefits – Provide tools.
Project Charter Document Control Directory Structure Shared Network Drive 0703-O O-001.xls Data Contacts 0703-S S-001.xls 0703-O-002.
The Business and People Side of BPM Joe DeMarco Black Belt Consultant Motorola Schaumburg, IL.
1561 INITIATIVE Lessons Learned and Future Considerations
Items Required for Process Hand-off
0 Six Sigma Project Guidance. 1 Roles and Responsibilities of the Finance Support Team Define Savings/Benefits Provide Financial Support – Project Selection.
© 2001 Six Sigma Academy. Exec. Consultant Paul Gillard TFS Ken Chmiel Division Steering Committee Exec – D. Sollenberger Fin – J. Anderson ADT - Tim.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
Deployment Strategy Six Sigma Academy.
Copyright © 2006 Six Sigma Academy International, LLC All rights reserved; for use only in compliance with SSA license. SSA Financial Product Finance Policies.
PRIMO Limited & 6 Sigma By HKU SPACE 6 Sigma Consultant Firm 30-May-2006.
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
Alpharma Six Sigma Deployment Proposal November, 2003.
© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. 1 Cover slide: Event name Team name and.
Project Selection Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Steering Committee Structure
Project Chartering & Approval Process
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
Finance Support.
Roles and Responsibilities of the Finance Support Team
Managing Challenging Projects Presented to the class of: Dr. Jane Mackay M.J. Neely School of Business.
TF&S – Deployment Structure February 24, Proposed Deployment Structure Exec. Consultant Paul Gillard TFS Ken Chmiel Division Steering Committee.
Communications. 2 The TFS Communication Plan Elements ◦Define Who – Why – How – When ◦Tagline message and Logo ◦Define and assemble Toolkits for Communicators.
WELCOME Business Process Management WELCOME. KEY ROLES/RESPONSIBILITIES Project Execution TeamsGovernance Team Project Leaders Deployment Team Project.
© 2003 Six Sigma Academy0 Critical Success Factors/Pitfalls Champion Workshop.
Info-Tech Research Group1 Manage the IT Portfolio World Class Operations - Impact Workshop.
© 2003 Six Sigma Academy0 The Roles of Six Sigma Champion Workshop.
Info-Tech Research Group1 Manage IT Budgets & Cost World Class Operations - Impact Workshop.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
1 Chapter 9 Implementing Six Sigma. Top 8 Reasons for Six Sigma Project Failure 8. The training was not practical. 7. The project was too small for DMAIC.
Analyze Wrap Up and Action Items
TM 720: Statistical Process Control DMAIC Problem Solving
Control Phase Wrap Up and Action Items
Lean Six Sigma DMAIC Improvement Story
Six Sigma.
Data Architecture World Class Operations - Impact Workshop.
Control Phase Wrap Up and Action Items
Define Phase Wrap Up and Action Items
Description of Revision
Project Organization Chart Roles & Responsibilities Matrix
Quality Management Six Sigma
IS&T Project Reviews September 9, 2004.
Improve Phase Wrap Up and Action Items
Control Phase Welcome to Control
Control Phase Welcome to Control
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Analyze Phase Welcome to Analyze
Measure Phase Wrap Up and Action Items
{Project Name} Organizational Chart, Roles and Responsibilities
Lean-Green belt six sigma program
Presentation transcript:

© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. Finance Process 22 May 2006

© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. 2 Agenda Objectives5 Minutes The Role of the Finance Rep.5 Minutes Valuation Guidelines5 Minutes Classifications of Benefits 10 Minutes Validating Results 10 Minutes Finance Timeline 5 Minutes Case Studies 5 Minutes WhatDuration

© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. 3 Objectives Finance’s Contribution to a Successful Deployment  Second only to Senior Management commitment  Allows project prioritization through estimates of benefits opportunities  Provides validation of all claims relating to financial improvement  Allows administration of accountability toward the Process Excellence effort  Supports a rewards and recognition program for project teams Finance Core Team Deliverables  Define Finance’s role and responsibility in supporting the Deployment  Define the project support timeline and valuation guidelines  Provide Q&A to topics supporting Lean Six Sigma financial analysis  Define rules for validation of savings and examples through Case Study  Create a universal Financial Worksheet for conducting project analysis  Utilize the power of ProjX for tracking financial benefits

© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. 4 The Role of the Finance Rep Provide the project team support by:  Establish the forecast value of a project with Project Champion  Serve as project team consultant  Validate the forecast of a project throughout the all project phases  Track and report the financial results of a project Principle Responsibilities:  Act as a resource to Project Champions in support of their efforts to define and prioritize projects  Work with the Project Leaders (Project Mgr., Black Belt, Green Belt) to: Identify financial metrics and project impact Validate financial results Track benefits after project complete Not a full-time position, but a key role within each project  Anticipated to be 8-12 hours per project over 3-4 months Finance Reps maintain current positions / reporting relationships

© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. 5 Valuation Guidelines Measurement  Project Leader defines process metric that will be used to determine that defects have been eliminated and documents method used to track  Finance Rep defines associated financial metric(s) and uses them to quantify costs of defect and validate benefits from eliminating defects Finance Rep Meeting Guidelines  Meet with Project Champion to create a high level original forecast  Meet with Project Leader as necessary to discuss project updates  Meet with Project Team, Project Champion or Project Leader as requested Project reviews, brainstorming, control plan Reporting and Documentation Tools  Financial Worksheet  Financial Tracker within Project Tracking Tool

© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. 6 Classification of Benefits Each project must classify it’s benefits into one of the following categories: Hard Benefits:  Realizable and quantifiable savings that can be attributed directly to the project Soft Benefits:  Intangible benefits that could not be measured and tracked directly to the project  Project can be successful without realizing any soft savings “Unrealized” Hard Benefits:  Benefits that will require an action on the part of management to be realized.  Will remain “Unrealized” until appropriate action is taken Example 1 – A capital improvement will increase sales, but is deferred until a later time Example 2 – An improvement creates available capacity (labor, equipment, etc), but no action is taken to remove the resource.

© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. 7 Original Forecast Begin during scoping and complete when project is loaded Obtain supporting documentation from Project Champion, Sub Process Owners and SME’s Enter in Project Tracking Tool Explain issues to Project Champion and Project Leader Revises as many times as necessary. Review with Project Leader prior to implementation Revisit supporting Documentation Enter in Project Tracking Tool Explain issues to Project Champion and Project Leader For 1 st 3 months of Realization, review with Project Leader Next 9 months of Realization, review with Sub-Process Owner Enter in Project Tracking Tool Audit that process changes remain controlled after 18 months into Realization Validating Results Initial Validation Revised Validations Including Final Validation Realization Review with Project Leader early in project Obtain Supporting Documentation from Project Leader Enter in Project Tracking Tool Explain issues to Project Champion and Project Leader