Bjørn W Melaa Excom Vice Chairman The Gas Regional Initiatives and the CBP "working towards a standardised European gas network"

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

EASEE-gas 20/10/2003 EASEE-gas Peter Taff (centrica) GTE Conference 22/23 October 2003.
Nina Grall DG TREN – Directorat C GRI SSE-EFET WS, 21/01/2008, Prague Concepts for the EU Gas Market Requirements and framework EUROPEAN COMMISSION.
EURELECTRIC vision on market development – what can the industry provide to accelerate market development? Peter ŠTULC Chairman of EURELECTRIC TF flow-based.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Vienna, 8 April th IG Meeting Meeting Guide.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Dipl. Ing. Dr. Stephan Ressl Vice Chairman EFET Europe Gas Chair EFET SSE Head of Business Development EconGas GRI SSE Vienna, European Federation.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Rocío Prieto, Co-Chair CEER LNG TF 20 th Madrid Forum September 2011 Accessing European LNG terminals.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
28 September 2004Energy Community South Eastern Europe1 Gas in South Eastern Europe GTE presentation Philippe Mannoni GTE Executive Secretary Zagreb, 28.
Message Codification & Maintenance Message & Workflow Design WG: = Member countries.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
EG pfa-sb Athen_November2005.ppt GIE Annual Conference The View of the Users of Gas Infrastructures Presented by Dieter Pfaff E.ON Ruhrgas AG Chairman.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Natural gas industry in Lithuania. Gas transmission and gas distribution companies in Lithuania. Gas consumption, gas consumers.
GRI SSE – latest developments as seen by a concerned TSO OMV Gas, November 2007.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
Directorate General for Energy and Transport Nina Grall Directorate General – Energy and Transport European Forum Gas 2007 – Paris Towards one.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
GTE views on the role of TSOs As foreseen in the Third Package Joint Workshop ERGEG GRI SSE and EFET 21 January 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
European Federation of Energy Traders 1 Brussels, 22 September 2009 Implementing the 3 rd EU Energy package Colin Lyle, EFET Gas Committee Chairman
Biomethane and the European gas infrastructure EBA Workshop 3 September 2015 Thierry Deschuyteneer Executive Secretary.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
1 The Spanish Gas Industry and the 3 rd Package Antoni Peris Mingot – Sedigas President GIE Annual Conference – Madrid.
Joint Workshop EFET and GRI REM SSE 21 January 2008, Prague, Czech Republic.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
1 Gas Regional Initiative Regional Energy Market South-South East Hub development as a regional balancing market Italian Balancing Point TF.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
23 September 2004GTE Annual Conference1 Review of the Madrid Forum VIII July 2004 Geert E.H. Joosten GTE President GTE Annual Conference September.
Coordination of Capacity Products Meinhard Janssen GTE ExCom Member GTE+ Workshop on GTE+ Work Programme 24 June 2008.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
International Association of Oil and Gas Producers Stakeholder view of EFET R_ISO Proposal Prague – 21 January 2008.
Maribor, October 9, 2007 Implementation of EASEE-gas’ rules Or …Working towards a functioning European gas network European Association for the Streamlining.
6th Stakeholder Group meeting Stockholm – 26 November 2009 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer,
GTE ppt 1 Brussels, Henri Cattoor, Edigas Chairman GTE Interoperability, EASEE-gas and LNG.
ETSO-GTE Supporting a secure and liberalized European energy market A Joint Presentation by Mr Geert Joosten, GTE Mr Juha Kekkonen, ETSO 22 January 2003.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
Technical Barriers to Gas Trade and Interoperability
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
Gas Transmission Europe
2009 TSO Transparency Gas Regional Initiative North-West
Background and Process
ERGEG GRI South South East – , Maribor
Logo(1.00”:3.33”) Font is Rotis Sans Serif however font may have to be embedded as it is important that this does not change on any presentations Size.
Achieving the Internal Gas Market The view of gas suppliers
GRI NW TRANSPARENCY PROJECT
Gas balancing – where next
8th SG meeting ERI South-West Europe
Meinhard Janssen GIE Board Member
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

Bjørn W Melaa Excom Vice Chairman The Gas Regional Initiatives and the CBP "working towards a standardised European gas network"

Who is EASEE-gas? What are the CBPs? The service proposed by EASEE-gas

Who is EASEE-gas? What are the CBPs? The service proposed by EASEE-gas

European Association for the Streamlining of Energy - gas Exchange- gas Mission: "to develop and promote common practices to simplify and streamline business processes between the stakeholders that will lead to an efficient and effective European Gas Market" Created in March 2002 with the support of the Madrid Forum Member States Industry European Commission Regulators

Few participants, stable and long lasting relationships Before new regulation With new regulation Hence need to streamline transactional processes Many players, short lived and fast changing relationships

Ownership of gasPhysical flow of gas Producers End Users Transporters Distribution Network Operators Suppliers Retail Suppliers LNG Terminal and Storage Operator and Service Provider (LTSOSP) Traders & Shippers Associate Members Members are from the entire European gas chain

86 full members & 25 associate members 6 segments currently active

Provides a unique structured platform in Europe where gas industry participants can: -discuss harmonisation & simplification of business process -agree on CBP, on a voluntary basis "Voluntarism is better than regulation" Will not advocate before any regulatory body The US example shows it works

Who is EASEE-gas? What are the CBPs? The service proposed by EASEE-gas

CBP aim to deal with "user oriented purposes", and with the whole description of the process: business process, message and workflow design, technology standard It is essential to monitoring implementation business process message & workflow design technology standard implementation CBP "Common Business Pratice"

CBP (02)Harmonisation of units CBP Harmonisation of nomination and matching process CBP protocol CBP Harmonisation of gas quality CBP Interconnection agreement CBP Constraints CBP Message transmission protocol CBP Common data network CBP Company's identifier encoding CBP Connexion point identifier encoding CBP release periods CBP CBP Harmonisation of the allocation information exchange Secondary capacity trading Existing CBPs: current situation tbi tbc tbc : to be completed tbi : to be implemented

Who is EASEE-gas? What are the CBPs? The service proposed by EASEE-gas

Action plan Implement existing CBPs 2. Complete existing CBPs 3. "Transpose" existing CBPs to other segments 4. Draw up new CBPs

implementation Action plan Implement existing CBPs Make implementation easier –Help desk –Inform EASEE-gas members & partners for IT preparation –Set up a responsible contact list for implementation, for each company Propose to monitor implementation –Set up a CBP preparation & implementation timetable (eg. "company x CBP") –Set up "EASEE-gas workshops" dedicated to implementation issues

technology standard message & workflow design Action plan Complete existing CBPs CBP Harmonisation of nomination and matching process CBP Harmonisation of the allocation information exchange CBP Secondary capacity trading Common manual for sales agreements "Dictionary of terms & definitions"

technology standard business process message & workflow design CBP TSO / producer TSO / regas operator TSO / storage operator regas nominations storage nominations CBP TSO / producer TSO / regas operator TSO / storage operator CBP regas capacity storage capacity CBP regas capacity storage capacity Action plan "Transpose" existing CBPs to other segment harmonisation of nomination and matching process harmonisation of the allocation information exchange secondary capacity trading interconnection agreement

business process Commodity trading arrangements (cf. Efet) Shipping-swapping Changing supplier Explore and develop ways for the consultation process, with GTE+ Action plan Draw up new CBPs technology standard message & workflow design

Thank you for your attention