NLCTA and ESA (Next Linear Collider Test Accelerator and End Station A) Carsten Hast Test Facilities Department Head SLAC DOE HEP Review July 7 – 9, 2008.

Slides:



Advertisements
Similar presentations
L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures.
Advertisements

Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
SLAC Electron Beam Test Facilities 5 MeV to 23 GeV Carsten Hast, Head Test Facilities SAREC Meeting at SLAC, July 2013 FACET ● ESTB ● NLCTA ● ASTA.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.
Welcome! Mauro Pivi SLAC, ESTB Workshop March 2011, SLAC.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Accelerator Systems Division FACET Accelerator Overview John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
AS Diagnostic Collaboration Mark Boland
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
Low Emittance RF Gun Developments for PAL-XFEL
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
FNAL, May 10, Introduction for Beam Diagnostics Laboratory Main Mission: R&D on charged particle beam diagnostics for e + /e - linear colliders.
Summary of Accelerator System (WG2) 김귀년 경북대학교. Presentations for WG2 -Polarized Electron Source for ILC in Korea - ( 김귀년 ( 경북대 ), 박성주 (PAL)) - ILC Bunch.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Operations, Test facilities, CF&S Tom Himel SLAC.
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
The T506 Experiment: Electromagnetically-Induced Radiation Damage to Solid-State Sensors Test Facilities Users Workshop SLAC, September Bruce Schumm.
FACET Update ARD Status Meeting Christine Clarke April 14 th 2011.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
The End Station Test Beam (ESTB) at SLAC Carsten Hast For the everlasting never giving up SLAC Test Beam Gang R. Erickson, T. Fieguth, C. Hast, J. Jaros,
SLAC ARD Test Facilities Tor Raubenheimer December 8 th, 2010.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
Initial Results from the SLAC ESTB T-506 Irradiation Study International Workshop on Future Linear Colliders University of Tokyo, November 2013 Bruce.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
The T506 Experiment: Electromagnetically-induced Radiation Damage to Solid-State Sensors Test Facilities Users Workshop SLAC, September Bruce Schumm.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
NLCTA Facility Capabilities E. R. Colby 5/18/09. NLCTA Overview RF PhotoInjector Ti:Sapphire Laser System Next Linear Collider Test Accelerator Cl. 10,000.
SL_THOMSON C. Vaccarezza on behalf of the SL_Thomson team.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Prospects for developing new tubes
Auxiliary Positron Source
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Testbeam plans for LEP instrumentation
End Station A Test Beam ESTB Design, Performance, Infrastructure, Status Mauro Pivi, SLAC on behalf of the ESTB team: C. Hast, T. Beukers T. Fieguth, R.
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
A summary of world-wide test beam facilities
End Station Test Beam (ESTB) at SLAC
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
Advanced Research Electron Accelerator Laboratory
FACET Accelerator Overview
SLAC Beam Test Facilities Overview (emphasis ESTB) Carsten Hast, SLAC
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
High Level Physics Applications for LCLS Commissioning
FACET Accelerator Overview
Operational Experience with LCLS RF systems
Presentation transcript:

NLCTA and ESA (Next Linear Collider Test Accelerator and End Station A) Carsten Hast Test Facilities Department Head SLAC DOE HEP Review July 7 – 9, 2008

SLAC DOE HEP Review July 7 - 9, 2008 Page 2 ARD Test Facilities Department *After this winter’s financial turmoil and reorganization ARD founded a new Test Facilities Department –Helps to develop and test near-term solutions for accelerator systems including RF structures and power sources as well as beam optical, diagnostic and collimation systems. –Operates and supports the large test facilities at SLAC NLCTA in ESB L-Band and X-Band RF test facilities in ESB End Station A FACET (2009) Hardware and personnel contributions to ATF/ATF2 program at KEK Support for LCLS hard- and software development *Personnel (2008) –Five engineering physicists, two technicians

ESA ESB & NLCTA

SLAC DOE HEP Review July 7 - 9, 2008 Page 4 SLAC Research Yard (RY) ESA ESB LCLS BSY NLCTA

SLAC DOE HEP Review July 7 - 9, 2008 Page 5 End Stations A and B *Both End Stations are very large and versatile concrete structures with excellent infrastructure: –3-15 MW of electrical power available –Abundance of cooling water –Tunnels for cable ways and other utilities –50t crane coverage –Walls are designed as radiation shields removable *ESA: 62m x 35m x 20m *ESB: 50m x 25m x 15m

SLAC DOE HEP Review July 7 - 9, 2008 Page 6 End Station B (ESB) *NLCTA Next Linear Collider Test Accelerator –small X-Band test accelerator (11m) –achieved peak energy of 350 MeV –Shielding designed for 1.2 GeV *E-163 Laser Acceleration –Using 60 MeV NLCTA beam into the experimental hall –Class 4 laser room *L-Band SNS modulator for RF tests of couplers, RF distribution systems outside of beam enclosure and cavities inside of NLCTA *4 X-Band RF structures for equipment testing –3 with 300 MW power –1 with 150 MW power *Building new L-Band test stand with Marx-modulator and klystron for life testing of both (operational this fall)

SLAC DOE HEP Review July 7 - 9, 2008 Page 7

SLAC DOE HEP Review July 7 - 9, 2008 Page 8 NLCTA Infrastructure

SLAC DOE HEP Review July 7 - 9, 2008 Page 9 NLCTA Beam Parameters *E-163: Ultralow Energy Spread Probe 5 pC, 60 MeV, x-y emittance 2.5  x 2.5 , 1ps bunch length 0.03% energy spread, 1 A peak current *Nominal High Energy Beams 0.25 nC, 350 MeV, 2  x 2  x 1.8 ps x 0.8%, 56A 1.00 nC, 350 MeV, 4.3  x 4.2  x 1.5 ps x 0.6%, 267A, (Laser upgrade) (Range: nC, MeV; focused density: 10 5 J/cm 2, peak density: 9.8 x /cm 3 ) *High Current Driver (Assumes laser upgrade and added pulse compressor) 1 nC, 350 MeV, 17  x 4  x 1.8ps x 0.65% (3.2 kA spike, long tail) *High Current Driver and Low Energy Witness (assumes major beam line upgrades to NLCTA) 0.9 nC, 350 MeV driver –and– 0.1 nC, 60 MeV witness with continuously variable timing

SLAC DOE HEP Review July 7 - 9, 2008 Page 10 NLCTA Future Program *Near Term (1-2 years) –Run E-163 and follow up experiments –L-Band and X-Band RF structure and pulse compression tests *Longer Term –Upgrade experimental hall (currently E-163) for higher energy –L-Band and X-Band RF structure and pulse compression tests –Currently in the planning stage for what could be done with the various possible beams of NLCTA

SLAC DOE HEP Review July 7 - 9, 2008 Page 11 Future Program Ideas for NLCTA

SLAC DOE HEP Review July 7 - 9, 2008 Page 12 NLCTA Maintenance and Upgrades Need to guarantee an efficient operation for the next five years and beyond *2008 –1 EOICs ($200k), ½ technician ($80k) and management/installation/safety ($125k) –M&S maintenance, consumables ($100k) –Maintenance/Repair labor ($150k) *2009 –1.5 EOICs ($300k), ½ technician ($80k) and management/safety ($125k) –M&S maintenance, consumables ($100k ) –Modernize the control system for modulators and make it compatible with other installations New PLCs ($40k) and new software controls ($75k) –Maintenance and upgrades of modulators Redesign grounding ($10k) and redesign tuning straps ($20k) Spare capacitors and miscellaneous other equipment (M&S) ($50k) Increase maintenance efforts (Labor ) ($250k) –Start rewrite of complete NLCTA control system from SCP to EPICS (SCP is phased out very soon) ($300k) –Buy necessary hardware for new EPICS control system ($75k) –New power supply for station 0 (increased operational efficiency) (M&S $50k, labor $30k) *2010 –Continued operation: 1.5 EOIC ($300k), ½ technician ($80k) and management/safety ($125k), –Maintenance/Repair (M&S $100k, Labor $250k) –Continue EPICS upgrade for NLCTA control system ($300) –Build spare modulator and klystron ($300k)

SLAC DOE HEP Review July 7 - 9, 2008 Page 13 End Station A (ESA) *Old work horse for deep inelastic scattering experiments *Successfully used during the past years for various test beams –simple radiation experiments to verify simulation codes –mini-Antarctica for calibrating ANITA, a balloon experiment looking for ultra high energy (UHE) neutrinos –ILC and Super-B detector development –ILC machine detector interface 18 feet Wakefield box Wire Scanners rf BPMs Dipoles + Wiggler T-487: long. bunch profile “IP BPMs” T-488 Ceramic gap for EMI studies

SLAC DOE HEP Review July 7 - 9, 2008 Page 14 Future Activities in ESA Hadronbeamline BeTarget e  diagnostics photon diagnostics eeee e  beam test area 2 º X-ray mirrors e  dump spont.undulator ESA (62 m long)

SLAC DOE HEP Review July 7 - 9, 2008 Page 15 *A ~10 GeV undulator solution fits as an x-ray source and provides the opportunity for HEP Test Beams *Test beam program will use primary and secondary beams much in the same fashion and for similar purposes as in the past years –Primary beam Beam instrumentation and accelerator physics studies, e.g. ILC Particle astrophysics detectors and techniques Materials damage studies with thin and thick targets, with a range of bunch lengths Radiation exposure and beam dump tests: Activation, residual dose rates and materials damage –Secondary beam (single electrons and hadrons) Detector R&D for HEP detectors like Super-B, LHC-detector upgrade, ILC- SiD development ESA: LCLS-Undulator 2 and Test Beams

SLAC DOE HEP Review July 7 - 9, 2008 Page 16 Phased approach to Future ESA Test Beams *LCLS-U2 might start 2014 *Phase 1: 2009(?)-2012 –Modernize the ESA PPS system design and implementation would probably cost about $500k, but needs additional study –Need upgraded kickers –Would seek agreement from SLAC management and BES for a defined fraction of LCLS beam pulses, e.g., 1% of 120 Hz –Possibility of beam halo in the linac as a completely parasitic source for secondary beam *Phase 2: 2014 onwards? –100% of spent beam will be available for test beams *Linac task force working towards recommendation for a coordinated development plan, with the aim that this will be adopted by SLAC management

SLAC DOE HEP Review July 7 - 9, 2008 Page 17 Conclusions NLCTA is a vibrant facility –Serves E-163 and many RF system test programs –Well integrated in the operation of the other programs in ESB –Necessary maintenance and upgrades haven’t been performed in the past years, which are now requested for FY2009 and beyond –Resources need to be committed to facilitate the move from SCP to EPICS based control system –NLCTA wants to expand its user base provided sufficient support is made available ESA –Had a very successful Test Beam Program in the past years for ILC MDI, various detector component studies, and other experiments –Currently no beam operation, pending PPS modernization –With the LCLS-U2 100% of spent beam would be available for Test Beams

ESA Additional

SLAC DOE HEP Review July 7 - 9, 2008 Page 19 ParameterILC (cold) X-band (warm) CLIC (warm) LCLS2 / ESA-TB Repetition Rate 5Hz120 Hz100 Hz60 Hz Energy 250 GeV 14 GeV Bunch Charge 2.0 x x x (0.2 – 1.0) x  x,  y (  m) 10, , , 0.022, 2 rms Bunch Length 300  m110  m30  m  m rms Energy Spread 0.1%0.2%0.35%(0.02 – 0.2)% Bunches/Train Bunch spacing 300ns2.8ns0.5ns- Train length 1ms300ns150ns- Beam parameters: ESA-TB vs. Linear Colliders

SLAC DOE HEP Review July 7 - 9, 2008 Page 20 ParameterDesired Parameter CapabilityLCLS2 in ESA Energy(0.1–100) GeV (0.1–14) GeV e, (0.1–8) GeV  Charge per bunch0.2– –10 10 e, (0.1–10) , ~0.1 K and p Particle type e , K, pe  K, p Bunch repetition rate (Hz)10 Hz or higher60 Hz Precise beam trigger Needed for time-of-flight measurements and TOF R&D Yes Spill length/pulse Single RF bucket ideal; pseudo-ILC train useful for ILC electronics power pulsing Single RF bucket Multiple particles/rf bucket possible? Useful for some linearity tests; useful for vertex detector track confusion studies Yes, with electrons or mix of electrons and pions rms x, y spot size<1cm; <1mm useful5 mm ok; reduced rate at 1 mm Momentum analysis?Yes (1%); for some tests to 0.1%Yes (1%) x,y,z space available1–4 m, 1–4 m, 1–3 m5 m, 5 m, 15 m Instrumentation Trigger counters; Halo veto counters; High resolution beam hodoscope; Particle ID (Cherenkov, TOF, shower counter); Small, high field solenoid; sturdy support table with remote movers Good capability for providing these Crane(0-10) tons15- and 50-ton cranes available ESA strength ESA satisfies many desired capabilities for a test beam facility Test beam capabilities with LCLS-U2 in ESA