F FNAL Hugh Montgomery Fermilab October, 2005. f October20,22, 20052Collider International Finance Committees New Director Pier Oddone –July 1, 2005 Organization.

Slides:



Advertisements
Similar presentations
A National Lab with a Global Mission Pier’s Symposium Fermilab, 13 June 2013 Stefan Söldner-Rembold, U of Manchester 13 June 2013S Söldner-Rembold - Pier's.
Advertisements

DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
F Future of Neutrino Program at FNAL NuMI Off-Axis Meeting Hugh Montgomery January 12, 2004.
The SLAC Scenarios Study A Long range planning exercise Tom Himel SLAC EPAC June 12, 2003.
1 Chapter Officer Roles & Responsibilities. 2 Chapter Officers/Leadership Team Serving on the Chapter Leadership Team is a privilege as well as a responsibility.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
F Run II Experiments and the Grid Amber Boehnlein Fermilab September 16, 2005.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
CDF perspectives and Computing needs KISTI, Dec 5 th 2008 DongHee Kim.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ICFA Report to KILC12 January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; 23 April 2012ICFA Report to KILC121.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
NEKIA Business Development Progress Report Board of Directors Meeting May 7,2003.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Long Range Planning Pier Oddone September 24, 2007.
P5 recommendation on Tevatron running Report of June 8 meeting FNAL.
Management subcommittee closeout Jay Marx (chair, LBNL), Joel Butler (Fermilab), Stan Wojcicki (Stanford) Thanks to all for cooperation and openness!!
F FNAL Hugh Montgomery Fermilab October, f October 27,28, 20062Collider International Finance Committees Organisation Issues Fermi Research Alliance.
F Fermilab: The Future Fermilab Users Meeting Hugh Montgomery June 3, 2003.
DOE Annual Review of SLAC HEP Research Program June 14-16, 2005 SLAC Charge to Committee Issues Procedures.
9 June 2005 FNAL Users’ Meeting 1/15 S.Kopp Collaborations between University Groups and the Fermilab Accelerator Division.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
Fermilab Budget Presentation Research Program Hugh Montgomery February 27, 2006.
Cost and Engineering Working Group Introduction Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group LBNE Reconfiguration.
All Hands Meeting FY 2008 Budget Pier Oddone Fermilab December 20, 2007.
F COMPUTING DIVISION ALL-HANDS MEETING May 7, 2004.
11 Welcome to All! October 26-28, 2009 Washington, D.C. Welcome to All! Accelerators for America’s Future Symposium and Workshop October 26-28, 2009 Washington,
1 Budgetary Issues Budgeted for 56 total attendees at subcommittee meetings, including co-chairs We have budgeted for each subcommittee to have 2 face-to-face.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Director’s Review 5/5/03 Spalding DRAFT RLS 1 Project Planning  Documentation to DOE June 1  DOE Review ~July 22 Documents Summary Project Overview,
1 Hadron Collider Physics Symposium 2006 at Duke University July 8, 2005.
Report from Fermilab Presentation to ICFA Symposium Daegu, Korea September 2005 Pier Oddone.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
June 15, 2002David Finley to Aspen PAC Slide 1 Report on 132 nsec Operation Report to the Fermilab.
Office of Science U.S. Department of Energy 1 ILC R&D Program Dr. David Sutter, Senior Program Manager Office of High Energy Physics Office of Science.
Summary Comments and Discussion Pier Oddone 40 th Anniversary Users’ Meeting June 8, 2007.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
F Detector and Computing Operations Hugh Montgomery DOE Tevatron Operations Review March 27, 2007.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
22 September 2006 Global Design Effort 1 The Global R&D Board Status Bill Willis GDE Columbia University.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
F Tevatron Run II Computing Strategy Victoria White Head, Computing Division, Fermilab June 8, 2007.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
Terry Wyatt, University of Manchester, UK 1 Manpower - Part 2 AvailabilityAvailability –Survey –Comparison of Needs and Availability –Caveats/to-do list.
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
ICFA Report to New Frontiers in Physics January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; June 15, 2012New Frontiers in Physics1.
F The Coming Particle Physics Revolution FNAL Long Range Plan : Progress Report Hugh Montgomery March 11, 2004.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
University Research Model Committee - Key points/issues - Other points/issues - New ideas - “University Model” issues in the report - Findings and Recommendations.
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
Muon Collaboration Meeting Steve Geer MUTAC Review, Jan, 2003 Muon Collaboration WELCOME.
DETECTOR RESEARCH AND DEVELOPMENT Fred Borcherding 1.
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
A Post P5 Planning Exercise at Fermilab Greg Bock Fermilab PAC July 24, 2014.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
Accelerated Protons and Personnel Doses
Jefferson Lab Overview
Remote Operations Erik Gottschalk 5 October, 2005
S4 will be a “big” Collaboration:
Yet Another Report from DOE Office of High Energy Physics
Presentation transcript:

f FNAL Hugh Montgomery Fermilab October, 2005

f October20,22, 20052Collider International Finance Committees New Director Pier Oddone –July 1, 2005 Organization –Some changes in the organization Nagaitsev: Recycler  ILC Shiltsev: Tevatron  LHC (New Head: Ron Moore) Kephart: TD  ILC Program Director Directions –Maintain the ships of the line (CDF, D0, CMS/LHC, MINOS, MiniBooNE) –ILC –Neutrinos NovA Proton Driver (Proton Plan on steroids)

f October20,22, 20053Collider International Finance Committees The outside world Operations Review (March 29-31) Annual Program Review (May 24-26) –Praised the collider program Physics Advisory Committee (June) HEPAP (July) –Manpower Study P5 (September)

f October20,22, 20054Collider International Finance Committees With P5: Management Experiment (FNAL) Budgets –Experiment Operating Budgets –Computing Budgets Experiment MOUs –  2002 –  2004,5 –  2006,7 recent development International Finance Committees –Commitments to experiment operating –Contributions to computing –Effort and participation

f October20,22, 20055Collider International Finance Committees With P5 Developments over past year HEPAP study –FNAL provided “PI” input for all the FNAL experiments –Developed transition plan for post-docs with a slight increase over a couple of years –Physicists Based view of FNAL physicists on a name-by- name assessment Checked with group leaders

f October20,22, 20056Collider International Finance Committees With P5: Collider Experiment Task Force Director charged a Task Force –Chair: Joel Butler- Associate Head of PPD “for experiments” –Membership from Laboratory and from Experiments plus a Co- Chair of the HEPAP Study. … would like to hear an interim report from the committee by September 7 prior to the P5 Meeting at Fermilab on September 12, 13.

f October20,22, 20057Collider International Finance Committees Collider Experiment Task Force Charge –review what is known about the scientific and technical needs for completing the Tevatron program through –choose its own methodology parse the total demands into segments partition easily understood segments from the more difficult make use of existing data from the HEPAP study, from the effort within the experiments Scrub needs should be scrubbed to ensure that they are real, important, and appropriately sized Address the needs through FY2007 as an initial step –As the gap between actual needs and available resources becomes clear, the committee should move to develop a suite of potential remedies. streamlining of operations and data analysis, sharpening the physics focus and ensuring the essential analyses are being addressed, merging certain support activities for D0 and CDF, increasing the use of post docs and visitors, and making special arrangements with CMS and ATLAS to smooth out the transition include an analysis and recommendations on what the agencies might do to ameliorate the problems associated with the transition.

f October20,22, 20058Collider International Finance Committees Collider Experiment Task Force Subgroup #1: Collaboration resources –Membership: Terry Wyatt and Rob Roser (co-chairs), Luciano Ristori, Pierre Petroff, Young- kee Kim, Gerry Blazey, and Chip Brock. Subgroup #2: Operations Requirements and resources –Membership: Willis Sakumoto and George Ginther (co-chairs), Linda Stutte, Mike Lindgren, Rob Roser, Gerry Blazey, Joel Butler, Jim Strait Subgroup #3: Data Processing requirements and resources – Membership: Ashutosh Kotwal and Gavin Davies (co-chairs), Amber Boehnlein, Rick Snider, Young-Kee Kim, Terry Wyatt, Bob Tschirhart, Vicky White Subgroup #4: Physics Analysis requirements and issues – –Membership: Gerry Blazey and Young-Kee Kim (co-chairs), John Hobbs, Volker Buesher, Franco Bedeschi, Rob Roser, and Beate Heinemann. Task Force has made considerable progress. –Draft Report Submitted to Director

f October20,22, 20059Collider International Finance Committees P5 Outcome? Anecdotal/Informal/Clandestine Readings only so far. P5 was impressed by: –Accelerator performance and prospects –Experiment performance and prospects –Experiment understanding of the issues –Expect to return to this issue in (early) 2007 Also heard that having heard from FNAL and SLAC, P5 needs to hear from the other side of the ledger

f October20,22, Collider International Finance Committees Tevatron

f October20,22, Collider International Finance Committees Tevatron

f October20,22, Collider International Finance Committees Experiments CDF D0

f October20,22, Collider International Finance Committees Schedule Recycler and electron cooling have been instrumental in the stores generated by stacking all the antiprotons in the recycler before shooting to the Tevatron. All the very highest Luminosity stores have been of this type. Issue for accelerator is to establish a higher antiproton production rate. This was the motivation for Director to delay shutdown to spring. –Ancillary concerns – feeder work in depths of cold Recent comedy with the Zebra Mussels now appears to prevent starting in February.

f October20,22, Collider International Finance Committees MiniBooNE Beam Delivery

f October20,22, Collider International Finance Committees NuMI/MINOS Beam Delivery Problem with Target worked around Recent problem with horn, fixed Hitting the 250 kwatt level Currently have > 6E19 protons on target 2005 Goal is 1E20 protons on target –They will be close

f October20,22, Collider International Finance Committees Conclusions Past Year was very successful for the Collider experiments Neutrino Program is firing on all cylinders Future will continue to have challenges for management Future continues to hold great promise for collider physics. Advances in luminosity are driven by advances in the use of the Recycler and electron cooling. Fermilab continues to be committed to the Tevatron Collider program.