1 SEVERAL REMARKS ON THE FUEL CYCLE ECONOMY Roman Kubín, Rudolf Vespalec ALTA, a.s. CZECH REPUBLIC 17 th AER Symposium - September 2007, Yalta.

Slides:



Advertisements
Similar presentations
CIMA-GMP FAT & QM CENTER
Advertisements

PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
OKLAHOMA TURNPIKE AUTHORITY Request For Proposals Pre Bid Meeting.
International Cooperation in Development and Supply of Nuclear Fuel for Czech NPPs Vladimír Hlavinka Chief Production Officer «ATOMEXPO 2009» 27 th May.
© CRISP Technologies CRISP Technologies introduces InvoiceCheck ® “Your Automated Invoice Processing Solution”
1 Quality in Contracting Dr. Tariq A. Aldowaisan; CSP, CQA, CQE, CQM/OE Gulf Lead Consultants Kuwait Electricity & Water Contractors Conference & Exhibition.
2003 Indigo Technology, Inc. All Rights Reserved Integrated Process Teams Process Management Quality Assurance Configuration and Data Management Program.
10.1 ALTERNATIVE SYSTEMS-DEVELOPMENT APPROACHES Traditional Systems Life Cycle –A phased approach, dividing development into formal stages –a formal division.
OHT 2.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 What is software? Software errors, faults and failures Classification.
Final Year Projects in the Context of Manufacturing Process Ian Webster Transform Rail Interiors May 2004.
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
Health Informatics Series
PROCEDURES FOR SELECTING THE CONTRACTOR
© 2003, Educational Institute Chapter 11 System Selection Managing Technology in the Hospitality Industry Fourth Edition (469T or 469)
1December 14, 2006Identifying Preferred Suppliers A Training Tool on Supplier Selection By Kira Connell Bus M 361.
12s-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Module 10 Organizing Procurement Session 10.7 Procurement of Goods:
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
1 CAPACITY BUILDING AND TRAINING ON PROCUREMENT Session 9 – The World Bank Procedures for IT Procurement September 21, 2005 by Arif Hassan.
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed.
From Research Prototype to Production
1 17 th Symposium of AER on VVER Reactor Physics and Reactor Safety September 24-29, 2007, Yalta, Crimea, Ukraine FUEL PERFORMANCE AND OPERATION EXPERIENCE.
Wisconsin Home Energy Assistance Program (WHEAP) - Kenna Arvold, Lead Administrative Review Monitor - Jeff Heino, Administrative Review Monitor.
12-1 Project Management from Simple to Complex This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
Work Package 2 Giacomo Grasso ENEA UTFISSM-PRONOC LEADER Work Package 2 meeting Madrid, May 8, 2012 Current status and organization of the work.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Key Functions of Business Operations
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master Safety in the Procurement Process Bill.
,Yalta,17-th Symposium of AER1 IMPACT OF CHANGED FUEL PERFORMANCES ON SAFETY BARRIER EFFECTIVENESS AT NORMAL OPERATION OF NPP WITH VVER A.V.
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
Advance Planning Briefing for Industry 10 October 2008 Mr. Chuck Comaty.
1 RRC KI Reduced leakage 17th Symposium of AER on VVER Reactor Physics and Reactor Safety September 24-29, 2007, Yalta, Crimea, Ukraine ADVANCED FUEL CYCLES.
MAKING IT HAPPEN. TRB 88 th Annual Meeting Risk Management in Public-Private Partnerships January 14, 2009 Statutory and Public Policy Approaches to PPP.
USE OF THE AXIAL BURNUP PROFILE AT THE NUCLEAR SAFETY ANALYSIS OF THE VVER-1000 SPENT FUEL STORAGE FACILITY IN UKRAINE Olena Dudka, Yevgen Bilodid, Iurii.
November 8, 2005 Philip Wheatley NSNFP Fiscal Year 2006 Workscope.
Chapter 12 Implementation and Maintenance
Need for telecommunications policy Strengthens the telecom department Serves organization in a more coherent and cost-effective manner Allows for smoother.
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
MARINE CORPS INSTALLATIONS EAST CONTRACTING DIVISION DEFINING REQUIREMENTS.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
1 State Scientific and Technical Center on Nuclear and Radiation Safety THE THERMAL-MECHANICAL BEHAVIOR OF FUEL PINS DURING POWER'S MANEUVERING REGIME.
The Contract Management Process Post Award Activities.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
What you need to know about procurement in Major Projects 1.
Framework Agreement How it will help you. Centralized procurement? Is Framework agreement Centralized Procurement? ▫Framework agreement is not Centralized.
Procurement Management System (PMS) What is PMS? What are the Objectives? Features Overview of the database Challenges Future Developments Views from Users.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Administration of a FIDIC Contract - Project Control
Award Management Services
Supply Chain Management Principles
PROJECT MANAGEMENT 2 Chu Eu Ho
APEX Electrical Interconnection Consultants, LLC
Peer Review Agenda (Suggested).
Quality Management Systems – Requirements
الجزء الثالث دراسة السوق.
What is software quality?
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Software Quality Assurance
Operating Margins (OM) Consultation
What is software quality?
Towards International Harmonized Nomenclature for Medical Devices
IT OPERATIONS Session 7.
Software Development In Agile
Requirements engineering in Cloud Computing
Presentation transcript:

1 SEVERAL REMARKS ON THE FUEL CYCLE ECONOMY Roman Kubín, Rudolf Vespalec ALTA, a.s. CZECH REPUBLIC 17 th AER Symposium - September 2007, Yalta

2 Fuel Cycle Economy -17th AER Symposium, Yalta 2007 FUEL PROCUREMENT – contract for fuel supply and associated services FUEL FEATURES AND LIMITS – safety/licensing/operating limits VENDOR´S SERVICES AND ASSISTANCE –documents or direct assistance QUALITY ASSURANCE- vendor´s QA, information databases

3 Fuel cycle Economy -17th AER Symposium, Yalta 2007 TYPE OF THE CONTRACT – fabrication, turn-key FINANCIAL PROVISIONS – production schedule and payment regime, leading times FINAL PRICE – reference date, escalation formula

4 Fuel cycle Economy – 17th AER Symposium, Yalta 2007 FUEL LIMITS – safety, licensing, operating limits vs future customer´s fuel cycle technology CORE PATTERNS – neutron economy, operating flexibility, the first loading pattern SAFETY ASSESSMENT – engineering coefficients, inaccuracies and errors

5 Fuel Cycle Economy – 17th AER Symposium, Yalta 2007 VENDOR´S INVOLVEMENT – fuel substantiation and justification, licensing safety analyses, trial operation DOCUMENTS – instructions for handling and use, licensing support ASSISTANCE –technical support or work management, shipment arrangement POST-SUPPLY SERVICES - feedback

6 Fuel cycle economy – 17th AER Symposium, Yalta 2007 QA AND INFORMATION – vendor´s QA system and information, production process monitoring FUEL WARRANTIES – mechanical limits, remedies, leakage monitoring DATABASES – production, physical, operating, failure analysis OPERATING RESULTS

7 Fuel Cycle Economy – 17th AER Symposium, Yalta 2007 FUEL CYCLE PROCUREMENT AND FUEL CYCLE TECHNOLOGY FUEL CONTRACT EVALUATION – a set of characteristics for vendor choice (safety, operating, financial) FINAL CRITERIA – the price of produced/sold electricity, consumption of uranium