Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.

Slides:



Advertisements
Similar presentations
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Advertisements

Risk Analysis Fundamentals and Application Robert L. Griffin International Plant Protection Convention Food and Agriculture Organization of the UN.
M & E for K to 12 BEP in Schools
PROJECT RISK MANAGEMENT
Note: Lists provided by the Conference Board of Canada
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 7: Managing Risk
Action Logic Modelling Logic Models communicate a vision for an intervention as a solution to a public health nutrition (PHN) problem to:  funding agencies,
Risk Assessment and Management Katie Matthews GEOG 350 November 8, 2007.
Planning and Strategic Management
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
The Australian/New Zealand Standard on Risk Management
ENVIRONMENTAL MANAGEMENT PLAN
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Integrated Risk Management Charles Yoe, PhD Institute.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Integrated Risk Management Institute for Water Resources 2010.
Auditing A Risk-Based Approach To Conducting A Quality Audit
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Managing Project Risk.
61 What is hazard risk management?. 62 Emergency risk management is “a systematic process that produces a range of measures that contribute to the well.
Frequently Asked Questions (FAQ) prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9.
Health Systems and the Cycle of Health System Reform
Opportunities & Implications for Turkish Organisations & Projects
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
The participants should have understood the following basic principles: Integrating gender considerations into project design and implementation Assessing.
Internal Auditing and Outsourcing
Identification, Analysis and Management
What is Business Analysis Planning & Monitoring?
Environmental Impact Assessment (EIA): Overview
Environmental Risk Analysis
Chapter 10 Contemporary Project Management Kloppenborg
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
KEYWORDS REFRESHMENT. Activities: in the context of the Logframe Matrix, these are the actions (tasks) that have to be taken to produce results Analysis.
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
UNDP Handbook for conducting technology needs assessments and Preliminary analysis of countries’ TNAs UNFCCC Seminar on the development and transfer on.
SECTION IV: GENERAL DESCRIPTION OF STEPS TAKEN OR ENVISAGED BY NON-ANNEX I PARTY TO IMPLEMENT THE CONVENTION Workshop on the Use of the Guidelines for.
Project Management Planning Minder Chen, Ph.D. CSU Channel Islands
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Project Management IV1021Fö5 Risk Management. Agenda Project Risk Project Risk Management The Risk Management Process Goal: get an understanding of basic.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
Lecture : 5 Problem Identification And Problem solving.
Screen 1 of 20 Vulnerability Vulnerability Assessment LEARNING OBJECTIVES Define the purpose and scope of vulnerability assessment. Understand how vulnerability.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
SOFTWARE PROJECT MANAGEMENT
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
Chapter 8 The Marketing Plan McGraw-Hill/Irwin
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Initiation Project Management Minder Chen, Ph.D. CSU Channel Islands
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
The Risk Management Process
Introduction to Project Management Chapter 9 Managing Project Risk
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
Logical Framework Approach 1. Approaches to Activity Design Logical Framework Approach (LFA) – Originally developed in the 1970s, this planning process.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
UNIT III. A managerial problem can be described as the gap between a given current state of affairs and a future desired state. Problem solving may then.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
DARSHANA RAGHU MANAGEMENT. Risk Management Risk management is the identification, assessment, and prioritization of risks followed by coordinated and.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
An Overview on Risk Management
HUMAN RESOURCE GOVERNANCE, RISK MANAGEMENT AND COMPLIANCE
Strategic Environmental Assessment (SEA)
OECD good practices for setting up an RIA system Regional Capacity-Building Seminar on Regulatory Impact Assessment Istanbul, Turkey 20 November 2007.
Managing the Planning Process
Managing the Planning Process
Presentation transcript:

Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009

Learning Objectives At the end of this session participants will be able to: –Define and discuss risk –Discuss risk management –Identify and discuss the elements of the risk management model proposed for the Corps

Risk Explained o Risk –chance of something happening that will effect National or Corps’ objectives o Measured in terms of consequences and likelihoods o Consequence can be negative (loss) or positive (potential gain) o Uncertainty can produce results better or worse than expected

Risk Management Essentially, making decisions under uncertainty Planning, analyzing, organizing, implementing and monitoring efforts to control the effects of uncertainty on the Corps’ Civil Works Program

Characteristics of Integrated Risk Management Universal Applicability Analytically-based and judgment-driven Simple and Flexible Systematic and Scalable Iterative Transparent and Open Dcoumented

Establish Decision Context Identify Risks Analyze Risks Evaluate Risks Risk Mitigation Monitor, Evaluate, Modify Communicate and Consult Risk Assessment COE Risk Management

Establish Decision Context Description This task establishes the decision context in which a risk management decision will be made. It includes defining the management problem, and establishing the measurable objectives of the activity to which the risk management process is being applied. Decision making criteria, evident uncertainties, and the questions to be answered in subsequent analytical steps are identified in this step. Outputs A written problem statement A written statement of the activity’s objectives A written list of management information questions A written list of the decision criteria A written list of the key uncertainties

Establish Decision Context Something triggers RM activity Decision problem is defined Goals, objectives, and strategies of RM identified and articulated Decision criteria explicitly considered so appropriate information is gathered Stakeholder and public involvement begins Establish Decision Context

Defining a Problem Problem identification-recognizing a problem exists Problem acceptance-deciding to focus attention and resources on it Problem representation-articulating the problem for the Corps and others and linking it to possible solutions Establish Decision Context

Identify Risks Description Identify the risks relevant to the decision context. This means identifying but not yet quantifying the consequences (positive or negative) and likelihoods and how they will be expressed. It includes asking and answering “what can go wrong” and “how can it happen” about the problem setting. Outputs A narrative description of the risks or significant uncertainties of concern to this risk management activity. A decision whether or not to pursue a risk assessment.

Tasks Start of risk assessment when one is done Identify –Presenting/existing risks –Risk reductions –Residual risks –Risk transformations –Risk transfers Ask and answer (scenarios) –What can go wrong? –How can it happen? Methods depend on nature of activity, process, or asset Stakeholder and public involvement Identify Risks

Analyze Risks Description Estimate the consequences and likelihoods of the risks identified in the previous step. At the same time recognize and report decision critical uncertainties and incorporate them as a source of risk. The consequence and likelihood for each risk may be combined to produce an estimated level of risk. Alternative management strategies are analyzed in this step. This is often the principle analytical step in the risk management process. Outputs Written answers to the risk managers’ questions with a focus on relevant uncertainties Descriptions of formulated alternative risk mitigation strategies Risk characterization of each significant risk with a focus on relevant uncertainties Formal risk assessment if required

Analyze Risks Remainder of risk assessment Each individually identified risk is analyzed –Gather information –Identify and assess significant sources of uncertainty –Identify options for achieving RM objectives and solving the problems –Evaluate and compare risk management options while accounting for uncertainty Analyze Risks

Evaluate Risks Description Risk management alternatives are evaluated and compared to identify the best solution. This evaluation includes consideration of the risk and other values important to the decision. The evaluation will consider the cost to reduce increments of risk; who bears the risk; what risks are managed, reduced, borne, transferred, and so on. Outputs An effective summary or display of the uncertainties most relevant to the risk manager’s decision Display of the varying contributions of the risk management options to the risk management objectives and other social values considered in the decision process

Evaluate Risks Separates minor/acceptable risks from major/unacceptable risks With stakeholder and public input determine if risk is tolerable or not Tolerance is based on trade-off among residual risk, cost of risk reduction and other factors Evaluate Risks

Risk Management Decision Description A decision is made to accept or take action to manage the identified risks. If action is taken, a risk management strategy is developed and implemented. Desired and measurable outcomes of the management strategy are identified at this step so the success of the plan can be monitored and evaluated. To the extent there is significant analytical uncertainty, the risk management strategy will include an adaptive management plan to reduce such uncertainties over time and as needed modify the execution of the actions taken. Outputs Determination of a tolerable level of risk for this risk management issue Selection of the best risk management option Identification of measurable desired outcomes to monitor the options success When appropriate, an adaptive management plan An implementation plan An implemented plan

Risk Mitigation Reduce unacceptable risks to TLR –Combinations of options may be needed RM plan should identify mitigation measures, responsibilities, schedules, expected outcomes, and measurements associated with mitigation strategy It’s critically important to identify desired outcomes of RM strategy prior to implementation Risk Mitigation

Mitigation Strategies Acceptance/retention Avoidance Reduction Transfer or risk sharing Containment Constant monitoring Continuous research Development of substitutes Precautionary principle Increasing resilience- resistance and robustness to surprises Treatment of risk Build confidence and trustworthiness Reduce uncertainties Clarify facts Involve affected people Deliberation Accountability Risk Mitigation

Communicate and Consult Description Active communication is an essential part of risk analysis. Communicate and consult with internal and external stakeholders as appropriate at each stage of the process. If there are shared risk management decisions, they should be identified, the decision participants recorded and a formal agreement documenting the shared responsibility for the decision prepared and signed by all responsible participants. Outputs Preparing and executing a public involvement plan including provisions for risk communication.

Communicate and Consult Keep all stakeholders informed about –Process –Findings of risk assessment steps –Nature of risk and its associated benefits –Deliberations that lead to risk management decision –Their role in implementing the solution Continual communication among participants to minimize misunderstandings and surprises at the end of the process Communicate and Consult

Monitor, Evaluate, Modify Description There are several purposes of post implementation monitoring. One is to assure that there is progress toward achieving the outcomes of the implemented risk management strategy. If there is an adaptive management process there will be data collection targeted to testing hypotheses required to reduce analytical uncertainties identified in the initial planning process. This task also scans the overall setting for the activity to identify hazards or changes in socioeconomic preference or conditions that may not have been recognized during the initial risk analysis process, or that may have changed in their significance. In all cases, the risk mitigation strategy may be modified in accordance with what is learned. Outputs A plan for monitoring, reviewing and modifying the implemented solution Implementation of that plan

Monitor, Evaluate, Modify Implication of uncertainty is RM is evolutionary decision making Assure decision is having desired outcome Monitoring-gather information that measures progress toward desired outcome(s) Information is evaluated to determine if adequate progress is being made toward outcomes If outcomes are not satisfactory changes are needed A mechanism for change, e.g. adaptive management plan, is part of best practice Monitor, Evaluate, Modify

To learn more about Actions for Change visit us on the web at Questions?